Safety Grounding Update - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

Safety Grounding Update

Description:

Substation and Line Calculations. 15 Second time used for Substation Bus grounding cables ... Example 8 Calculation. Example 8. Example 8. 2 % increments are 4.8 miles ... – PowerPoint PPT presentation

Number of Views:163
Avg rating:3.0/5.0
Slides: 37
Provided by: DSW93
Category:

less

Transcript and Presenter's Notes

Title: Safety Grounding Update


1
Safety Grounding Update
  • July 25, 2006
  • Phoenix, AZ

2
Power System Safety Manual (PSSM)
  • 2005 PSSM did not have Grounding Tables for
    Regions
  • 2006 PSSM has new Grounding Tables for Regions
  • Appendix K for DSW Grounding Tables

3
2006 PSSM Appendices
4
3 Tables for DSW Data
  • Table 1 Substation Grounds for both the lines
    and substation equipment
  • Table 2 Line Grounds for entire line
  • Table 3 Line Grounds with specific section
    breaks

5
2006 PSSM Appendix KTable 1 pages 173 through
183
6
Table 1 Explanation
  • Faults placed on all buses in cases with DSW and
    connected systems
  • 3 Phase and SLG faults maximum of both
  • 3 Grounding conductor sizes
  • SBS for substation
  • LNS for lines

7
Table 1 Calculations
  • Calculations use the maximum fault current
  • Table 10.1 in 2006 PSSM Cable Limits

8
Substation and Line Calculations
  • 15 Second time used for Substation Bus grounding
    cables
  • 30 Second time used for Line grounding cables
  • 90 derating is used for 2 or more cables

9
Example 1 Calculation
10
Example 2 Calculation
11
2006 PSSM Appendix KTable 2 pages 184 through
190
12
Table 2 Explanation
  • Same calculations as Table 1 for each substation
    line
  • Home Bus and Home Bus kV
  • Remote Bus
  • Maximum for entire line
  • 2/0 cables used
  • 30 second time

13
Example 3 Calculation
14
Each Line Entered Twice
15
Example 4 Calculation
16
Example 4 Calculation
17
Table 3 2006 PSSM Appendix Kpages 192 through 193
  • 2 Pages
  • Spreadsheet with data is 2 pages wide
  • Match pages for the full line entry
  • Most lines have 2 entries with home bus at each
    end
  • Not all lines in Table 3
  • Use Table 2 for max grounding if line not in
    Table 3

18
Page 1 of Table 3
19
Page 1 of Table 3
  • Contains the data for the substations
  • Home and Remote Buses
  • Home Bus Grounding for substation
  • 15 Second Clearing for Buswork
  • 27,000 Amps / 2/0 ground cable
  • 90 used for multiple ground threshold
  • Three phase and SLG fault current at home bus
  • Maximum fault current at home bus used

20
Page 2 of Table 3
21
Page 2 of Table 3
  • Contains the data for the lines
  • Home bus line grounding given
  • Length of line given
  • 4 distances from home bus for ground changes

22
Home Bus Line Grounds
  • 30 Second Clearing for Lines
  • 20,000 Amps / 2/0 ground cable
  • 90 used for multiple ground threshold
  • Three phase and SLG fault current at home bus
    (Page 1 of Table 3)
  • Maximum fault current at home bus used

23
Line Distance Grounds
  • Calculated in 2 increments along Line
  • Change conductors at distance listed for
    breakpoint
  • Distance and grounds start with home bus ground
  • Calculations based on 30 second clearing

24
Example 5 Calculation
25
Example 5
26
Example 5
27
Example 5
28
Example 6 Calculation
29
Example 6
30
Example 7 Calculation
31
Example 7
32
Example 8 Calculation
33
Example 8
34
Example 8
  • 2 increments are 4.8 miles
  • Higher conductor number to lower conductor change
    uses end of 2 increment (conservative)
  • Lower conductor number to higher conductor change
    uses beginning of 2 increment (conservative)

35
Future Work
  • Put lines in Table 3 for all lines with 1 or more
    break points on grounding cable number
  • Update values for lines from previous study
  • Remove buses in Table 1 that are not WAPA buses
  • Remove PTI bus numbers in Tables

36
Questions?
Write a Comment
User Comments (0)
About PowerShow.com