Example 2.2. Projecting the Costs of Bookshelves at Woodworks. Winston/Albright ... would like to project its costs of manufacturing the bookshelves into the future. ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 8
Provided by: ISR39
Category:

less

Transcript and Presenter's Notes

Title: Projecting the Costs of Bookshelves at Woodworks


1
Example 2.2
  • Projecting the Costs of Bookshelves at Woodworks

2
Background Information
  • The Woodworks Company knows that wood prices and
    labor costs are likely to increase in the future,
    and it would like to project its costs of
    manufacturing the bookshelves into the future.
  • Build a spreadsheet model that allows the company
    to experiment with the growth rates in wood and
    labor costs so that a manager can see, both
    numerically and graphically, how the costs of the
    bookshelves will vary in the next few years.

3
Planning the Model
  • The reasoning behind the model is
    straightforward.
  • First project the unit costs for wood and labor
    into the future. Then for any year, multiply the
    unit costs by the required numbers of board-feet
    and labor hours per bookshelf.
  • Finally, add the wood ad labor costs to obtain
    the total cost of a bookshelf.

4
BookshelfCost.xls
  • The completed spreadsheet model is shown.

5
Developing the Model
  • Develop the model with the following steps.
  • Inputs Enter the inputs into the upper left
    corner of a worksheet. These can be referred to
    later with Excel formulas.
  • Design output table Think ahead of time how you
    want to structure your outputs. The important
    point is that you should have some logical design
    in mind before diving in.
  • Projected unit costs of wood It is important to
    have a strategy in mind before you enter the
    formulas. You should design your spreadsheet so
    that you can enter a single formula and then copy
    it whenever possible.

6
Developing the Model -- continued
  • For example enter the formula B9 in cell B19
    and copy it to cell C19. Then enter the general
    formula B19(1B10) in cell B20 and copy it to
    the range B20C25.
  • Projected unit labor costs To calculate
    projected hourly labor costs, enter the formula
    B13 in cell D19. Then enter the formula
    D19(1B14) in cell D20 and copy it down to
    column D.
  • Projected bookshelf costs With careful use of
    absolute and relative addresses, enter a single
    formula for these costs for all years and for
    both types of wood. To do this, enter the formula
    B5B19B6D19 in cell E19 and copy it to the
    range E19F25.

7
Developing the Model -- continued
  • Chart Highlight the range E19F25 and click on
    Excels Chart Wizard button. This leads you
    through a sequence of steps. You should
    experiment with the possibilities.
  • The model can be used to answer any what-if
    questions Woodworks might want to ask.
  • It has been built in such a way that a manager
    can enter any desired values in the input cells,
    and all of the outputs, including the chart, will
    update automatically.
  • Burying input numbers inside Excel formulas is
    bad practice.