1
Pivotal Supplier Test
  • Staff Strawman Proposal for ERCOT UBES Market
  • Background Presentation for Technical Workshop
  • August 3, 2005

2
Significant points
  • Tests generation-controlling entities, not QSEs
  • Only tests spinning and quick-start capacity
  • Tests 12-month period

3
Basic steps
  • Count the number of intervals a generation entity
    was pivotal
  • Total UBES offers entitys imputed UBES offer
  • Pivotal if result is less than UBES actually
    deployed
  • Compare number of pivotal intervals to threshold

4
Imputed UBES offers
  • Calculate entitys excess spinning capacity for
    each hour
  • Identify available units (committed, quick-start)
  • Find maximum MW (HSL) planned MW for each unit
    sum up for all available units
  • Multiply excess spinning capacity by common
    adjustment factor
  • System UBES offers / System excess spinning
    capacity

5
Threshold
  • Test sample quantities for pivotal frequency,
    look at trend
  • Re-stablished each 12-month test period
  • Deterministic, based on
  • Observed market data
  • Formula and standard statistical method

6
Threshold test quantities
  • Calculate average offer stack
  • Use 21 equal increments, ranging from 0 to 100
    of average stack
  • Test each quantity against data for each interval
    during 12-month period
  • Total offers test MW MW deployed?
  • Count number of intervals test quantity was
    pivotal

7
Pivotal frequency curve
8
Find the trend line
  • Apply single-variable linear regression to the 21
    data points
  • of pivotal intervals ?0 ?1 MW
  • Find the x intercept (in MW)

9
Find the threshold
  • Test the MW associated with x-intercept against
    data for each interval during 12-month period
  • Number of intervals this quantity was pivotal is
    the threshold for the test period

10
Compliance with 25.503(g)(7)
  • Optional automatic calculation of UBES offers for
    an entity failing the PST

11
Outcomes
  • Preferred outcome entity with market power has a
    neutral effect on competitive prices
  • Acceptable outcome entity with market power
    submits UBES offers at short-run marginal cost

12
Automatic offers
  • Quantity all excess spinning capacity (net of AS
    obligations)
  • Price curve proportionally the same as the
    competitive market

13
Automatic offers
  • Effect is to enlarge the competitive offer stack
  • Avoids price distortions that would result if
    entity with market power were simply required to
    be a price taker
  • Considered not to be withholding of UBES (ex ante
    safe harbor)

14
Original UBES offer stack
15
Parsed offer stack
16
Revised pivotal offer
17
New UBES offer stack
Write a Comment