About This Presentation
Title:

IVHM Modeling

Description:

2. ARC IVHM Systems Engineering ... Discrete Event Sims. Using Behavioral Models. IVHM Requirements Traceability. June 27, 2002 ... – PowerPoint PPT presentation

Number of Views:427
Avg rating:3.0/5.0
Slides: 19
Provided by: koushi2
Category:
Tags: ivhm | modeling

less

Transcript and Presenter's Notes

Title: IVHM Modeling


1
IVHM Modeling
  • NASA Ames Research Center

2
Agenda June 27/28 2002
  • Background, history, and status of the tool, and
    AEE integration status
  • Inputs and their sources, and interdependencies
    with other tools
  • Modeling approach
  • Outputs and users/customers of the outputs
  • Readiness to support SRR and SRD

3
Background and History
  • Work with TA-1 and SEI to determine the
    architectures health mgt rqmts
  • Define IVHM architecture(s) which meet the
    requirements
  • Derive Allocate the respective technology
    requirements
  • Develop required IVHM system level technologies
  • Oversee Manage subsystem health mgt. technology
    development
  • Integrate, Verify and Validate IVHM technologies

4
Modeling Approach
Design Modifications
STS Experience
Modeling and Simulation
Requirement Allocations
Economic Analysis
Achievable Subsystem Requirements
5
Systems Analysis Optimization
  • Establish physical decomposition of the system
  • Define the mission objectives and model related
    concepts of operations
  • Perform Requirements Management and Functional
    Allocations
  • Perform Timeline Analysis and Resource
    Availability
  • Perform/support System Safety assessment
  • Perform Financial Analysis and Simulation
  • Define System IVHM Test Requirements
  • Perform Integrated safety and Cost/benefit Trades

6
IVHM Requirements Traceability
Discrete Event Sims Using Behavioral Models
7
IVHM Component Hierarchy
8
IVHM Component Hierarchy
9
Behavior Model Review
  • Select Type of Simulation To Perform
  • Full Simulation
  • Simulate Turnaround
  • All Simulations Include Behavioral Models
  • Crew / Payload
  • Mission Planning
  • Pre-launch
  • Launch
  • On-Orbit
  • Post Landing
  • Depot Maintenance

10
Behavior Model - 3rd LayerTypical Turnaround
Process Booster 1 Mechanisms
11
Inputs and Their Sources Turnaround Tasks
12
Inputs and Their Sources - Mission Profile
13
Typical Turnaround Simulation Output
14
Sample OutputsTurnaround Booster1 Cost Estimates
15
Sample OutputsCrew Mission Cost Estimates
16
Customers
  • ISAT Dennis Romano
  • AEE Donavan Mathias
  • Operations Modeling Mike Nix
  • Program Office Bill Kahle

17
Interdependencies with Other Tools
Baseline Operations timelines costs
Separation abort timing
Probability LOC LOV
Probability LOC LOV
Weight, TTC, power, volume
Requirements Database Analysis Tool (CORE)
Cost of operations
Operations costs timelines
Vehicle DDTE. vehicle TFU, facilities
development costs
18
SRR and SRD Support
  • Systems Engineering
  • Derived system requirements and provided key
    influence to TA-5 RST IVHM Technology
    Requirements
  • Analyzed, assessed and identified key IVHM
    technology risks/mitigation task plans
  • Traced IVHM Reqs up to Lev I Reqts allocated to
    Subsystems (generic)
  • Derived Initial "TA-1 Impact" Statements showing
    empirical cost/safety evidence for IVHM
  • Analysis Optimization Process
  • Developed and validated a model-based "Analysis
    and Optimization" process for IVHM
  • Formally provides cost/benefit analysis and aid
    in optimized definition and allocation of IVHM
    requirements across RLV
Write a Comment