Infrastructure Improvements - PowerPoint PPT Presentation

About This Presentation
Title:

Infrastructure Improvements

Description:

Upgrade street lights to energy-saving light fixtures. Add street lights to make campus safer. ... to edit Master text styles. Second level. Third level. Fourth ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 10
Provided by: davechak
Learn more at: https://www.csuci.edu
Category:

less

Transcript and Presenter's Notes

Title: Infrastructure Improvements


1
Infrastructure Improvements
  • Dependable infrastructure for CSUCI campus
  • Dave Chakraborty
  • Director, Planning, Design Construction

2
Master Plan
  • Campus Buildout Master Plan
  • 2024 Enrollment 15,000 FTEs
  • Master Plan To 2024
  • 2024 Building Area 2.1M GSF
  • 2007 Building Area 550K GSF

3
The Problem with Our Infrastructure
  • Electrical 50 year old system ready to fail.
    Electrical system inadequate to serve future
    growth.
  • Sewer pipes Leaking continuous maintenance
    problem.
  • No cooling in buildings.
  • Inefficient steam heating in buildings.
  • Build data / telecom system ready for future
    growth.
  • Deliver reclaimed water for irrigation.
  • Domestic water and stormwater drainage adequate.

4
The Infrastructure Project
  • New HVAC systems planned for Bell Tower,
    University Hall, Malibu Hall, and Solano Hall.
  • New electrical ductbank and transformers.
  • New telecom ductbank.
  • Repair / replace sewer pipes.
  • New reclaimed water irrigation piping and natural
    gas piping.

5
Project Data
  • PCL is CM_at_Risk Contractor for the project.
  • Project bids in March.
  • Issue Construction NTP April 2008.
  • Construction Budget 40 Million
  • Encumbered funds spent by June 2010.

6
  • Construction Impacts

7
Construction Impacts
  • Vehicle traffic limited to one lane for extended
    periods of time.
  • Pedestrian traffic limited to one sidewalk for
    extended periods of time.
  • Sewer work temporary sewer pipes and pumps will
    have to be installed above ground for extended
    periods of time.
  • Electrical tie-ins buildings will have to be
    powered by generators for days at a time.
  • Building HVAC renovation in University Hall
    Bell Tower Noise interruptions during work in
    crawl space. Sections of buildings will have to
    be vacated for work inside the building (moving
    target).
  • Telecom will be interrupted in buildings when
    data lines are being upgraded.
  • Unscheduled utility interruptions resulting from
    accidents, and unforeseen hidden conditions.

8
Secondary Benefits
  • Upgrade Central Mall remove roads, and create
    pedestrian walkway(s).
  • Upgrade street lights to energy-saving light
    fixtures. Add street lights to make campus safer.
  • Replace sidewalks to satisfy ADA compliance
    requirements.
  • Repair road surface, curbs and gutters.

9
Questions?
  • OPC Contacts
  • Dave Chakraborty x8496
  • Peggy Hoge x3153