Joint High Speed Vessel JHSV Program Overview - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Joint High Speed Vessel JHSV Program Overview

Description:

Joint High Speed Vessel JHSV Program Overview – PowerPoint PPT presentation

Number of Views:377
Avg rating:3.0/5.0
Slides: 25
Provided by: techn70
Category:
Tags: jhsv | high | joint | overview | program | sew | speed | vessel

less

Transcript and Presenter's Notes

Title: Joint High Speed Vessel JHSV Program Overview


1
Joint High Speed Vessel (JHSV) Program
Overview SNAME SD-5 IHS
28 September 2006
2
DoD High Speed Vessels
SWIFT
SPEARHEAD
3
Fleet Ops .
4
Platform History
  • Program based on 5 years of experience with
    leased vessels
  • Joint Venture
  • Westpac Express
  • Spearhead
  • Swift
  • Army Navy/Marine programs merged into Navy-led
    acquisition program
  • PEO Ships (PMS-325) tasked with procuring Army
    and Navy ships

5
Employment History
  • OIF
  • OEF
  • JTF HOA support
  • UNIFIED ASSISTANCE
  • KATRINA Relief Ops
  • Lebanon Support
  • SOCOM GWOT missions
  • Exercises in all COCOMs

6
Operational Employment
JTF KATRINA OPS
Operation IRAQI FREEDOM
UNIFIED ASSISTANCE
7
Operational Employment
Beirut, Lebanon
Cyprus
8
Operational Employment
KATRINA
Bahrain
9
Seabasing Littoral Maneuver
JLOTS Support
At-sea ship-to-ship transfer
10
Access
RRDF Ops
Austere port ops
Degraded port ops East Timor
Quay wall offload Kenya (JTF HOA)
11
Multi-Mission Utility
Maneuver of mechanized units
Sustainment
Riverine Ops
12
HSV Flight Ops
13
HSV Flight Ops
JTF KATRINA OPS
UNIFIED ASSISTANCE
14
Program Status
  • Initial Capabilities Document (ICD)
  • Analysis of Alternatives (Dec 05)
  • Milestone A (Apr 06)
  • Capability Development Document (CDD)
  • In JCIDS staffing as of 31 Jul 06
  • Performance Specification development
  • In development concurrent with CDD
  • Industry Day 13 Sep 06
  • Milestone B/DDC Award - 2QFY08

15
Acquisition Constraints
  • Cost is a KPP
  • Lead ship acquisition cost capped at 210M,
    follow ships at 170M (FY08 dollars)
  • Commercial, non-developmental acquisition
  • Single platform design to support all services
  • Lead ship award NLT 2QFY08
  • JHSV is not a combatant will be built to
    commercial survivability standards
  • JHSV weight sensitive added features detract
    from overall performance

16
JHSV Capabilities
  • Austere port access
  • Mobility speed, range, payload
  • Mission Operating Environment
  • Minimal manning
  • Habitability support for crew and mission
    personnel
  • Mission Deck and Cargo Handling to support combat
    ready troops and equipment
  • Aviation support

17
JHSV Capabilities
  • Crew-served weapons/Self-defense
  • Command Control
  • At least Open Architecture Computing Environment
    (OACE) level 3
  • Refueling at sea
  • 20-year service life

18
Requirements Overview
  • Ship size design to ensure austere port access
  • Length less than 450 ft
  • Panamax
  • Navigation Draft less than 15 ft
  • Draft includes thrusters (if provided)
  • Mobility - Speed, Range, and Payload
  • Loaded Transport at least 600 st of cargo, 1200
    nm at 35 knots (average speed) without refueling
    in SS3
  • Unloaded Transit at least 4700 nm at 25 knots
    (average speed) without refueling
  • Cargo includes embarked personnel and their
    equipment any mission specific equipment (with
    mission equipment related stores)

19
Top Level Requirements
  • Operating Environment
  • Operate in SS5
  • Survive at best speed/heading in SS7
  • Air temps of 10 105 degree (F), relative
    humidity 50

20
Manning and Habitability
  • Crew design to minimize crewing requirement,
    maximum of 37
  • Dedicated berthing area for mixed gender crew
  • Seating - 312 passengers for 96 hours
  • Some seats may be removable to make room for
    temporary berths
  • Mission Berthing 150 passengers for at least 14
    days
  • Up to 30 berths may be temporary and installed in
    place of some seating
  • Galley and Mess area
  • Support seating 60 people at a time
  • Short term feeding may use tray pack rations,
    long term require fresh meals

21
Mission Deck
  • At least 20,000 sqft usable area
  • Minimum 12,000 sqft in aft portion of mission
    deck must have at least 156 overhead clearance
  • Capable of handling military vehicles including
    M1A2 tank, MTVR truck, Expeditionary Fighting
    Vehicle (EFV), 20 foot containers (TEUs)
  • Designed to minimize onload/offload times
    (traffic patterns, obstructions, turning lanes)
  • Services
  • Mission module stations (power, LAN)
  • Service Panels (potable water, LP air)
  • Tie downs
  • Air recirculation

22
Cargo Handling
  • Ramp
  • Capable of supporting M1A2 tank
  • Capable of offloading astern through 40 degrees
    to one side
  • Capable of offloading M1A2 to lighterage (RRDF)
    in SS1
  • Rapid deployment (5 min) and retraction (10 min)
  • Move 27k pounds between mission deck and flight
    deck
  • Move 40k pounds between pier and mission deck
  • Launch and recover boats up to 40 feet long
  • Not necessarily a dedicated system
  • Launch 2nd boat within 40 minutes of launching
    initial boat
  • Limited capability to move 40k TEUs around
    mission deck

23
Aviation Support
  • Single-spot flight deck for at least H-60/H-1
  • NAVAIR certification for Level 1, Class 2
  • Day/night, instrumented landing with full
    service, no maintenance
  • Limited refueling capability for aircraft
  • 18,000 gallons stowage 1000 gallons service
  • Parking area adjacent to flight deck for at least
    (1) H-60 (T)
  • Enclosed stowage area not required

24
Questions
Write a Comment
User Comments (0)
About PowerShow.com