Initiated testing different model setups ... Further research needed to define multi-path model setup. Recommendations. Short-term proceeding with PT Best-path setup ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 23
Provided by: schm73
Category:

less

Transcript and Presenter's Notes

Title: Floridas New Transit Modeling System


1
Floridas New Transit Modeling System
  • Huiwei Shen, Yongqiang Wu Dave Schmitt
  • 11th TRB Planning Applications Conference
  • Daytona Beach, Florida May
    6th-10th, 2007

2
Background/Context
  • Florida is one of few states that standardizes
    modeling practices
  • Original standards developed in early 1980s
  • Original transit model needed re-evaluation
  • Florida MTF decided in 2005 to convert models
    from Tranplan to Voyager
  • Increasing pressure on transit models from New
    Starts

3
Work Task Overview
  • FDOT needed an updated transit model using PT
    that was mindful of the
  • Existing standards
  • User planner needs
  • New/Small Starts FTA guidance
  • Features capabilities of PT Voyager
  • Key challenge PT was largely untested unused
    at the time

4
Technical Challenges
  • Leg vs. link
  • Multi-path path-builder
  • Always finding a transit path

5
Leg vs. Link
Centroid
Station
Rail Line
6
Transit Link Example
Centroid
Walk-access connector
Sidewalk link
Station
Rail Line
Sidewalk link
7
Transit Leg Example
  • Two requirements
  • All connectors must connect transit stop to
    transit stop or transit stop to centroid
  • Connectors must spider highway network

Centroid
Walk-access leg
Station
Rail Line
8
Leg vs. LinkImplications
  • Could not use link-based access connectors
  • Spidering along highway network conflicts with
    percent walk computations developed in GIS
  • Ubiquitous vs. specific access
  • Requires program to coordinate percent walks
    walk-access connectors
  • Lack of any walk-access connectors implies no
    real transit access ? re-set percent walks to zero

9
Technical Challenges
  • Leg vs. link
  • Multi-path path-builder
  • Always finding a transit path

10
Transit Path-Builders
  • Two types single-path multi-path
  • Single-path
  • Exclusively available in Tranplan, Minutp TP
  • Dominant path-builder in Florida US
  • Multi-path
  • Available in TransCAD Cube-Voyager (PT)
  • Becoming more prevalent

11
Multi-Path vs. Single-Path
Rail/Shuttle
Local Bus
O
D
Express Bus
Also loading percentages!
12
Multi-Path Builders
  • Advantages
  • Reflect sensitivities that would otherwise
  • Be impossible in single-path builders, or
  • Create inconsistencies between the path-builder
    mode choice model
  • Offer better consistency between path-builder
    mode choice weights
  • Unknowns
  • How to
  • Design a multi-path model
  • Coordinate it with the mode choice model
  • Calibrate validate
  • Introduce a new transit mode
  • Whether they meet FTA New/Small Starts guidance
  • Whether they work as intended/desired

13
Happenings
  • Citilabs added a best-path switch to PT in
    summer 2006
  • Addresses FTAs New Starts quality control tests
  • Mimics single-path builder from Tranplan
  • Not compatible with all parameters/keywords
  • Initiated testing different model setups
  • To provide empirical data to assist with
    FTA/Citilabs discussions
  • Help determine best design for a PT-based transit
    model
  • Identify any software or design-related issues
    early on

14
Transit Model Setups
15
Findings
  • Developed PT Best-path setup that mimics
    PT-TRNBUILD results
  • Multi-path model design results very different
    from Best-path TRNBUILD
  • Further research needed to define multi-path
    model setup
  • Recommendations
  • Short-term proceeding with PT Best-path setup
  • Separate guidelines for General New/Small
    Starts use
  • Long-term track evolving FTA guidance, industry
    progress PT updates goal - evolve to multi-path

16
Technical Challenges
  • Leg vs. link
  • Multi-path path-builder
  • Always finding a transit path

17
Finding a Transit Path
  • Previous path-builders like Tranplan TRNBUILD
    would not develop a transit path if walking is
    faster
  • Skim would contain all zeros or just have zero
    IVT
  • No similar logic in PT
  • It does not allow the use of consecutive
    non-transit legs
  • If any transit is available, it will always find
    a transit path no matter how crazy

18
Finding a Transit Path Example
  • Take walk connector 137-2909
  • Ride all-stop north to 2849
  • Take escalator up to 7849
  • Ride skip-stop south to 7909
  • Take walk connector 7909-136

19
Finding a Transit Path Solution
  • Generate all-walk connectors from all zones to
    all zones
  • Compare all-walk time/utility to transit
    skim/utility
  • If all-walk time is less onerous, zero out
    transit skim
  • Can be done post skimming or in mode choice

20
Status
  • Developed framework documents to summarize key
    points
  • Theoretical coordination of individual parts
  • Application parameter settings, technical
    details
  • Both available on www.fsutmsonline.net
  • Developed training model with full transit model
  • Transit model training workshop June 4-7, 2007

21
Special Thanks
  • James Ryan Nazrul Islam, FTA
  • Wade White Dudley Morrell, Citilabs
  • William Woodford, Jeffrey Bruggeman Ashutosh
    Kumar, AECOM Consult

22
  • Thank you!
Write a Comment
User Comments (0)
About PowerShow.com