Azeri Chirag Gunashli Full Field Development Produced Water Disposal - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Azeri Chirag Gunashli Full Field Development Produced Water Disposal

Description:

BP as the operator on behalf of its partners in Azerbaijan International ... for this project on 20th October, Hyatt Regency Hotel, Baku, 10.30 -13.30. ... – PowerPoint PPT presentation

Number of Views:124
Avg rating:3.0/5.0
Slides: 2
Provided by: wil86
Category:

less

Transcript and Presenter's Notes

Title: Azeri Chirag Gunashli Full Field Development Produced Water Disposal


1
Azeri Chirag Gunashli Full Field
DevelopmentProduced Water Disposal
  • BP as the operator on behalf of its partners in
    Azerbaijan International Operating Company (AIOC)
    announces that as part of its work programme for
    Azeri-Chirag and Deepwater Gunashli (ACG) Full
    Field Development (FFD) Produced Water Disposal
    (PWD) Project, the Draft Environmental and Social
    Impact Assessment (ESIA) Document has been
    published and disclosed for public consultation.

Proposed Produced Water Pipeline in Relation To
ACG FFD
The PWD project will construct and install a
pipeline which will transport Produced Water from
Sangachal Terminal to Central Azeri Compression
and Water Injection Platform (CWP) where it will
be reinjected into the Azeri reservoir along with
the Produced Water that is separated offshore.
The ESIA document examines the potential
environmental and social impacts of the
activities, and describes the recommended
mitigation measures. The full document and the
Executive Summary have been produced in Azeri,
Russian and English and placed at locations
advertised in the local press. Copies of the
Executive Summary are also available from BP
office, Main Reception, Villa Petrolea for
collection.
AIOC welcomes your comments. Please provide these
on a ESIA Comments Form available at this
location. You are also invited to attend the
Public Consultation meeting for this project on
20th October, Hyatt Regency Hotel, Baku, 10.30
-13.30. Please present or post your completed
forms by the 9th November, 2006 to Saadet
Gaffarova, AIOC HSSE, 1033 Izmir Street, 6th
Floor, Hyatt Tower II or email Saadet
kafas0_at_bp.com For further information please
contact Saadet Gaffarova at BP Azerbaijan.
Tel. 497 93 11
Write a Comment
User Comments (0)
About PowerShow.com