BELENE STAFFING FOR OPERATIONS - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

BELENE STAFFING FOR OPERATIONS

Description:

... to meet the expected demand for required nuclear engineering degreed personnel ... to have engineering degrees in disciplines other than Nuclear Engineering. ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 6
Provided by: pars3
Category:

less

Transcript and Presenter's Notes

Title: BELENE STAFFING FOR OPERATIONS


1
BELENE STAFFING FOR OPERATIONS
  • 5 November 2007

2
Milestone Dates for Belene
  • Preliminary Acceptance Unit 1 January 2014
  • First commissioning activity September 2012
  • Preliminary Acceptance Unit 2 January 2015
  • First commissioning activity September 2013
  • Supply of Training Simulator September 2010

3
Typical NPP Staffing Trend
Years Prior to First Criticality
Source IAEA Workshop, Vilnius, 26-28 June 2007
4
Training of Belene Operating Staffmust begin in
2009 - 2010
  • To meet qualification requirements for Unit 1
    positions in the time required to support the
    current schedule, the only realistic option is to
    utilize personnel that have had KNPP operational
    experience
  • Current enrollment at Universities is not likely
    to meet the expected demand for required nuclear
    engineering degreed personnel
  • Simulator instructors have additional experience
    requirements before being licensed as
    instructors.

5
Issues for Consideration
  • Availability of sufficient number of personnel
    with prior KNPP experience to start vendor
    training for Belene operations
  • Other countries allow license candidates to have
    engineering degrees in disciplines other than
    Nuclear Engineering. Given the extensive
    specialized training provided to operator
    candidates, the approach in Bulgaria may be
    overly conservative
  • Training and experience requirements in
    regulations should consider needs of a new plant
Write a Comment
User Comments (0)
About PowerShow.com