Title: Transmission System Planning CAISO Perspective and Challenges


1
Transmission System PlanningCAISO Perspective
and Challenges
  • David Hawkins
  • California ISO

2
CAISO Planning Roles
  • Review/comment/approve Transmission Owner 5-year
    expansion plans
  • Address seams issues between TO plans
  • Support National and Regional Planning activities
  • Local Area Reliability Studies - Must Run
    Generation
  • Review / comment / approved new generator
    interconnections

3
Planning Challenges
  • Balkanization of the planning process
  • Lack of adequate time for planning due to the
    accelerated permitting, siting, and construction
    of new generation
  • Justification of transmission upgrades for
    economic reasons as well as reliability
  • Region wide congestion management and common
    models for real-time operations, markets and
    planning
  • Public opposition to new transmission projects

4
Additional Challenges
  • Desire to move to probabilistic planning rather
    than all deterministic planning
  • Understand and quantify the economic consequences
    of grid failures
  • Need for common definitions of outages and
    failure rates collection and sharing of this
    data
  • Lack of universal transformer / line rating
    methodologies

5
Security Issues
  • Information Security - How to share transmission
    expansion plans / drawings with the public and
    yet not disseminate information that could be
    used by terrorists
  • Communications Security - How to protect systems
    from hackers
  • Physical Security - Protections of transmission
    lines, substations power plants

6
Need for Regional Planning
  • The Western Grid acts as an integrated system and
    needs to be planned as an integrated system
  • Transmission bottlenecks in one state impacts the
    ability to seamlessly move power from resource
    centers to load centers
  • Terry Winters vision is to have a regional
    planning authority with the ability to order
    upgrades where needed in the Western States

7
WSCC Network Model Tools
  • One single model for Regional studies
  • 13,000 buses, 400,000 nodes
  • Need Real-time State Estimator and Security
    Assessment Applications
  • Need System Restoration analysis tools

8
(No Transcript)
9
Locations
10
Figure 14.b
Transmission Capacity
2010 Gas Scenario
2004 Base System Lines
(Width Indicates Relative Capacity)
Added Capacity
(Width Indicates Relative Capacity)
Capacity Added
11
RTO Plans
WestConnect
12
Proposed Functions
  • One Stop Shopping
  • OASIS
  • Ancillary Services
  • Scheduling
  • Market Monitoring
  • Inter-Regional Planning
  • Seams Disputes Resolution
  • Standards and
  • Practices
  • Common
  • Transmission Products
  • Interconnection Standards
  • Reliability Standards
  • ADR (Interregional)
  • Protocols Data Standards
  • Scheduling Practices
  • Pricing
  • Compatible
  • Congestion Management
  • Information Systems
  • Shared
  • Services
  • Back-Up Control Centers
  • Employee Training
  • Pooled Human Resources
  • Purchasing
  • Settlements
  • Enterprise Software
  • IT Systems
  • Regional
  • Accountability
  • Selection of Boards of Directors
  • Provider of Transmission Services
  • Control Area Operation
  • Security Coordinator
  • Maintenance
  • Outage Coordination
  • Capital Expenditures
  • Regional Planning
  • FERC Compliance