Executive Summary
  • A 700k Large Infrastructure Equipment and
    Facilities (LIEF) application submitted to ARC.
  • This provides for 10 Gb/s to Mt Pleasant and 1
    Gb/s to Mt Canopus (1m optical).
  • Ceduna
  • Has an old 2 Gb/s Telstra fibre. Cost of
    operation?
  • Connection to AARNet3 is difficult, but this is a
    more desirable solution.

2
LIEF application
  • Application is a collaboration between UTas,
    ATNF, Swinburne, Geoscience Australia and the
    ANU.
  • A 0.5M Fibre trenching and endpoint
    equipment for Mt Pleasant Sandy Bay.
  • A 80k Minor equipment Research Associated
    for 1 year.
  • B 120k Fibre trenching and endpoint equipment
    for Mt Canopus Mt Pleasant at 1 Gb/s and
    remote operability of Canopus.

3
The Bigger Picture
  • Current connection Hobart-Melbourne is at a few
    100 Mb/s.
  • 7.5M Federal funding to connect University and
    CSIRO in Tasmania to AREN.
  • 2.5 Gb/s when Basslink project completed in
    2006/7.
  • Timeframe for 10 Gb/s ??