Title: A very busy week:


1
  • A very busy week
  • In the assembly tent
  • Assembly of module 5 and 6
  • ? missing 4 tiles, module 6 completed
  • Final checks on LED fiber coupling and light
    spread (Hendrik)
  • In the testing tent
  • Test of LED light spread over one bundle
    (Sebastian)
  • Test of settings for the PIN diode preamplifier
    (Nanda)
  • Test of new CMB prototype board with DAQ
    control (Milan)
  • ? the LED can be triggered by Tcalib and the
    amplitude steered by Vcalib
  • ? though some problem in the LED pulse shape

2
Test of new CMB prototype
differential pulse to LED triggered by Tcalib and
steered by trimmers
differential pulse to LED triggered by Tcalib and
steered by Vcalib0
3
  • In the Lab
  • new ASIC test board with manual controlled
    setting is soldered and works properly
    (Sasha/Natasha)
  • recovered lost factor 2 in ASIC gain
  • the measurement of saturation curve continues!!
    (Sasha/Hendrik)
  • At the test beam
  • Paul was here yesterday
  • ? fixed some DAQ problems between new/old
    version
  • ? establish communication to Slow Control
    computer
  • movable stage can be controlled by slow control
    (Sven)
  • ? and soon also by configuration loop in the
    DAQ
  • The longer shaping time is still a mystery
  • APD paper
  • Finished and submitted to Rolf for DESY
    directorate approval

4
  • Another very busy week
  • In the assembly tent
  • Assembly of module 5 and 6 are assembled
  • ? missing 4 tiles, module 6 completed
  • Module 3 fiber rooting finished tested
    (Nanda)
  • Next modules will be testes by Karsten with a new
    system
  • Final checks on LED fiber coupling and light
    spread (Hendrik)
  • In the testing tent
  • Test of LED light spread over one bundle
    (Sebastian)
  • Test of settings for the PIN diode preamplifier
    (Nanda)
  • Test of new CMB prototype board with DAQ
    control (Milan)
  • ? the LED can be triggered by Tcalib and the
    amplitude steered by Vcalib
  • ? though some problem in the LED pulse shape
  • ? many progresses but not conclusive

5
Typical differential pulse from LED
driver amplitude controlled via external DC
level
With amplitude controlled via Vcalib
LED pulse
Vcalib Tcalib
6
  • In the Lab
  • new ASIC test board with manual controlled
    setting is soldered and works properly
    (Sasha/Natasha)
  • recovered lost factor 2 in ASIC gain
  • the measurement of saturation curve continues!!
    (Sasha/Hendrik)
  • ? presentation from Hendrik in 2 weeks
  • ? Renovation of the LAB next week!!!
  • At the test beam
  • Paul was here yesterday
  • ? fixed some DAQ problems between new/old
    version
  • ? establish communication to Slow Control
    computer
  • movable stage can be controlled by slow control
    (Sven)
  • ? and soon also by configuration loop in the
    DAQ
  • ? DAQ controlled scan, software being written
    (Marius)
  • ? deeper look into SiPM with long discharge
    (Marius/Vladimir)
  • The longer shaping time is still a mystery
  • APD paper
  • Finished and submitted to Rolf for DESY
    directorate approval

7
Weekly HCAL Meeting
  • Module assembly Karsten ? large fluctuation in
    the measured resistance between SiPM pins 4
    15 MOhm
  • what do we measure ?
  • - SiPM internal resistance S1000 Rpixel
    (2-20 MOhm) 2-20kOhm
  • - measuring R across SiPM pins measures the R
    diode R(V) !!
  • conclusion measurement indicates if SiPM is
    connected, value fluctuations indicate
    fluctuations in quality of SiPM (? to be checked)
  • ? Mapping of fiber rooting bundle quality
    check automated
  • LED driver Milan/Sven/Boris ? working on a new
    prototype steered
  • by Tcalib and Vcalib (DAQ)
  • CMB production depends on the success
    of this prototype

8
Weekly HCAL Meeting
  • Activities on Module 1 2
  • - all measurements stopped to investigate
  • long discharge behavior and SR losses
  • Module 1 Vladimir ? SiPM on the scope vs voltage
  • Marius ? look into correlations
    apply V corrections
  • Module 2 Natasha ? repeat Vladimir measurements
  • Beni ? look into correlations apply V
    corrections
  • SR losses Mathias/Peter/Sven ? chasing ground
    problems
  • 1st lesson learned all auxiliary devices
    must be on
  • reference ground

9
Weekly HCAL Meeting
  • PIN diode r/o Mathias ? implemented changes for
    PIN diode r/o on one HAB channel (this HAB CANNOT
    be used for SiPM r/o !!!)
  • - very low noise
  • - production of all PIN diode HABs launched
  • Nanda ? ASIC settings for PIN diode r/o
  • Lab 143 thanks to Peter and Gert we have a
    new/clean/beautiful lab!!!
  • Next Meeting skip next week but earlier on the
    week after
  • ? Tuesday the 30th

10
Production status
  • VFE Electronics
  • - all mother-boards arrived in the tent
  • - 30 PIN diode HABs 80 SiPM HABs ? to be
    tested on Friday
  • Modules assembly
  • - waiting for connectors (this week) and cables
    (next week)
  • - production of slow control cable ? finished
    this week
  • CMB prototype
  • - many progresses made by Ivo
  • - main problems due to miss-usage of driver

11
Test Beam Status Plans
  • Restart with new VFE electronics
  • Exchange CRC board ? possible problems with BE (!
    to be checked)
  • Start integration of testboard for PM readout
  • 6th of October ? Aachen group starts measurements
    on TPC
  • Plan for the next 4 weeks
  • Week 1) LY calibration
  • Week 2) physics measurements (shower max with
    absorber in front)
  • Week 3) systematic studies (tile sizes,
    uniformity, edge effects, ...)
  • Week 4) spare for possible crosschecks (or delays
    ?)
  • After 6th of October ? we work in parassitic
    mode
  • - long discharge studies
  • - LED calibration, pedestal stability, and
    maybe... beam

12
Test Beam Status Plans
  • Restart with new VFE electronics
  • Exchange CRC board ? possible problems with BE (!
    to be checked)
  • Start integration of testboard for PM readout
  • 6th of October ? Aachen group starts measurements
    on TPC
  • Plan for the next 4 weeks
  • Week 1) LY calibration ? done
    (?Marius)
  • Week 2) physics measurements (shower max with
    absorber in front)
  • ? start on Mon. with additional 2 PM readout
    (? Volker)
  • Week 3) systematic studies (tile sizes,
    uniformity, edge effects, ...)
  • Week 4) spare for possible crosschecks (or delays
    ?)
  • After 6th of October ? we work in parassitic
    mode
  • - long discharge studies
  • - LED calibration, pedestal stability, and
    maybe... beam

13
Module assembly
  • Modules 4,5,6 assembled, cabled, waiting for
    fiber rooting
  • ?next week the mirrors should arrive
  • New fiber bundles made and polished on the glued
    side ?next week presentation on
    new monitoring system technology
  • Module 3 dismounted ? in the tile tester over
    next week
  • ?has to be assembled before end of the month !!
  • After assembly ? modules stacked in tent for
    electr. cosmic test ?no absorber plates
    in between !! Only electrical isolation
  • Module 3 will come as last
  • ? comparison between LD results in tile tester
    and after soldering
  • End of Sep. the measuring/drilling stage is
    dismounted
  • ? end of module assembly for this year

14
Status and Plan for the Main meeting
  • Monitoring system ? still un-understood feature
    of LED driver
  • ? saturation curve from 18 SiPM (mod2)
  • ? pixel fit / systematic studies on gain
  • Test Beam ? E scan for SiPM saturation
  • ? shower max comparison for 10 SiPM
  • ? MIP / LY calibration

15
Test beam tent
  • No test beam activity for this and next week
  • ? try to install LED driver in module 1 but
  • ? module 1 continuously powered
  • ? need of a second LVDS converter to operate two
    DAQ!!
  • Module 2 is closed now supports the tail
    catcher
  • ? integration of tail catcher in undergoing ?
    Vishnu
  • Move to the test beam on the 31st

16
Activities in the lab more
  • Test of 40 SiPM for H1 detector, underway in the
    tile tester
  • ? found 2 LD SiPM, the others are OK for the use
    in H1
  • Test of Hamamatzu SiPM from Volker
  • ? need to modify tile (they are thicker)
  • ? need to modify tile tester (opposite bias
    connection)
  • Many more SiPM saturation curves ? Hendrik
  • Online logbook
  • ? after detailed discussion we have a concept
    and Sven said
  • its no problem!
  • Nacht des Wissens
  • ? we have 4 tables to fill with HCAL, a plan
    volunteers

17
Status of Module assembly
  • Modules 4,5,6 assembled, cabled, waiting for
    fiber rooting 20/10/05
  • ? still the case
  • Module 3 only half cabled, no fibers
  • All cabled channels tested for LD
  • ? 3 LD in mod 6, 1 in 5
  • New fiber bundles are needed with smaller
    diameter
  • ? being made
  • Mid Dec. start combined cosmic test with ECAL 5
    HCAL modules
  • ? integrate one CMB prototype board if possible
  • ? run over Xmas
  • Shopping list mechanical support, 10 LV/HV
    cables, 10 SCASI (extra!)
  • 2 scintillator plates,
    NIM/LVDS converter, 1 DAQ

18
Current analysis activities in the group
  • Beni ? combined analysis of HCAL and Tail Catcher
    in the testbeam
  • ? influence of ASIC chip on SiPM r/o
  • Marius ? HCAL testbeam data
  • calibration procedure saturation
    correction
  • Hendrik ? SiPM saturation curve in control
    environment
  • reproducibility, tile size dependence,
    SiPM type dep.
  • Nanda ? SiPM saturation curve in the module
  • reproducibility, uniformity of light
    system

19
The Xmas(s) Run
  • Xmass run started on the 23rd Dec. and continues
    till Mon. the 9th
  • Connected Module 4, 5, 6
  • Monitoring side
  • 3 LED driven with prototype LED driver,
    steered by DAQ 3 PIN diodes r/o on prototype
    preamp. boards (Ivo)
  • In addition 16 ECAL slabs were connected and
    partially in operation ?trigger distribution
    problems high leakage current
  • First run on dCache Dec 25 1646 Run110931.bin
  • The data taking loop
  • 1801383504 Jan 4 0901 Run111319.bin 300k
    ev cosmics LED ped
  • 280658436 Jan 4 1145 Run111320.bin 2
    Gby in 20 h
  • 402035080 Jan 4 1205 Run111321.bin
    saturation gain calib 80k ev
  • 294959428 Jan 4 1221 Run111322.bin
    saturation phys mode 50k ev

20
Xmas(s) Run Hardware
  • Mechanic (Doerte / Karsten)
  • Stack assembly in April check the gap size for
    full stack
  • Need new tool for VFE insertion and extraction
  • Use cable fixing (for SCASI and HV/LV) on the
    module side
  • Electronics
  • VFE working fine! No unexpected DAC losses
  • Repair 1 broken SCASI connector on mother board
    (Mathias)
  • CRC warning! Too many FE with problems
  • ? Paul is coming on the 10th with spare CRCs (2
    ECAL 1 HCAL)
  • Slow control (Sven)
  • Working fine!
  • Check correlation between temperature behavior
    and our actions

21
Xmas(s) Run Software / Online
  • All interactive scripts (cp bin to dCache,
    convert bin to LCIO, check the copied file and
    clean local disc) did not work continuously
    ? need manual restart
  • Fix problems with scripts
    (Roman / S. Schmidt)
  • Discuss strategy for CERN
  • Online display was off too time consuming on DAQ
    machine
  • Install new DAQ next week
    (Marius / Paul)
  • New online display software development
  • Extract data for analysis from LCIO
  • (Roman / S. Schmidt / Beni / Hendrik
    / Nanda)
  • One unique format for every analyzer
  • Many single root files .vs. unique root file with
    everything ? ? check running time
    on LCIO and on ROOT

22
Xmas(s) Run Analysis
  • Pedestal stability
  • LED / PIN diode stability
    (Hendrik)
  • MIP correction with LED
  • MIP correction with temperature
  • Gain stability (Beni)
  • MIP correction with gain
  • Saturation curve studies reproducibility /
    T-dependence (Nanda)
  • Book keeping Long discharge and dead
    channels, currents, etc. (?)
  • Simulation (Sebastian)
  • Influence of calibration precision on energy
    resolution
  • MIP variation with temperature

23
Xmas(s) Run Database
  • After all calibration factors are UNDERSTOOD
    choose frequency for DB update
  • (S. Schmidt)
  • Create DB entry for all modules
  • Develop easy access to check all parameter
  • Analysis from DB (S. Schmidt)
  • LY calculation, comparison to ITEP LY
  • Noise calculation from phys mode ped. In MIPs and
    in pixels

24
First Draft schedule for CERN
These slides are on http//www.desy.de/garutti/We
eklyHCALMeeting.ppt
25
Steps towards CERN
  • Tile tester (Sasha) module 7 tested delivered
  • - 1 tile with high current
  • - 1 mismatch number
  • module 8 test started
  • Assembly production (Doerte/Karsten) started
    mosaic of mod. 7
  • - first look tolerances got worse
  • - knowledge transfer will take 2 weeks
  • - technical support coming only on the 19th
  • Tests on assembled modules
  • - 4,5,6 (tent) used for CMB commissioning
    studies (Hendrik)
  • - check of long discharge 2 (mod 4), 1 (mod
    5), 4 (mod 6) OK!
  • - over night run ECAL cosmics HCAL for 1
    run
  • - from this week combined cosmics every
    night

These slides are on http//www.desy.de/garutti/We
eklyHCALMeeting.ppt
26
Test schedule
this week ? finish CMB commissioning
(tent) week 12-17 ? further checks on CMB ?
/ DAQ studies (tent) test of DC and check
of mod. 1 (TB) week 19-24 ? ?? (tent)
DC dedicated studies (with ECAL people) (TB)
week 26-31(?) ? combined r/o ECAL/HCAL (tent)
with 2 crates no activities possible
(TB) after that (Apr.)? 4 modules in the
test beam, MIP scan mid Apr. ? combined ECAL
/ HCAL test beam
These slides are on http//www.desy.de/garutti/We
eklyHCALMeeting.ppt
27
New SiPM test
Test of cassette 8 completed 2 SiPM bad 1
(?) Average current in 7,8 higher (0.6 uA) than
in previous cassettes (0.3 uA)
0.48 uA
0.78 uA
28
Test Beam and Tent activities
  • New firmware installed in both DAQ systems
  • Synchronization of code changes is very important
    !
  • ECAL HCAL cosmic run over the w.e. (?)
  • Drift chambers aligned and TDC in the readout
  • Flush gas over the w.e.
  • Monday start DC test (with Michele from ECAL)
  • CMB tested in the tent (Hendrik)
  • still 1 week free for test, then 2 weeks DAQ
    combined test (enough?)
  • LAB saturation curve of SiPM (Daniel, Henning,
    Nicola)
  • ?problems with test board
  • ?hopefully first results ion 1-2 weeks (?)

29
Production status
  • Cassette 7 measured, being drilled
  • Cassette 8 ready for measuring and drilling
  • Cassette 9 Tile test finish today
  • Cassette 10 next week

30
Module production
Production can now be followed on the e-log
http//ttfinfo.desy.de/CALICEelog
Update 29/03/06
Update 06/04/06
31
Program for the next week
  • Today tomorrow
  • transport 4 HCAL modules (1,2,3,4) in test beam
  • cabling, slow control connection
  • From Monday
  • transport 1 VME DAQ to test beam
  • set up cosmic run for ECAL over Easter in the
    tent
  • no possible work on tent DAQ till 24th of April
    !!!
  • start stage scan in test beam
  • 24th April
  • ECAL people will move the ECAL to the test beam
  • start preparation to combined ECALHCAL run for
    CERN
  • ? you are all invited to take some shift to
    learn how to use both systems !

32
Test Beam
  • Scanned modules 1,2,4 ? results next week
  • Module 3 has 20 SiPM to be resoldered/exchanged
    (Sasha)
  • This weekend scan modules 4,2,1 for sys. studies
  • Monday exchange modules with 4,5,6 and (?) 3
  • Scan modules in the beam.
  • ECAL installed behind HCAL till 15th of May
  • Then exchange positions 2 weeks for us to take
    data
  • Write Train online monitoring
  • These week already 4/5 people in the hut we
    expect more !
  • Week of the 8th (Montreal) Drift Chambers on ?
    uniformity of tiles
  • If possible test modules 8-10 before the 15th

33
Tent assembly
  • CMB test suspended till 22-25 May (4 full boards
    expected)
  • Need to dismount steel structure (after Monday)
  • Next 1-2 week(s) Sasha test of new SiPM with
    DAQ
  • No module required
  • From 22 May Ivo test
  • modules 1-7 should go back to cosmics data taking
  • Next week Sasha (NIU) will bring 2 1x1 m2 trigger
    plates
  • New cosmics structure ?

34
Production status
Test of new SiPM completed in tent
(Sasha/Sebastian) ? results next week Modules up
to 8 calibrated Module 9 waiting for tests New
cosmic set up not yet operational will start
this w.e. Second week of shift training a good
experience !??!
35
Test beam studies - holdscan
  • Modules _at_ test beam
  • Trigger latency

beam
Trigger 1 / NIM coin.
readout
DC1
DC3
DC4
DC2
Trigger 2 / NIM coin.
AHCAL modules
36
Trigger latency
Too close at the maximum
OK!
  • Holdscan problems
  • big statistic fluctuations in layer 3 4 due to
    the shower start? accuracy of the mean is
    affected
  • channel differences in the order of 10 ? seems
    to be a chip feature? needs further
    inverstigations

37
Signals in a holdscan for the different layers
? 1 MIP
layer 1
layer 2
layer 3
layer 4
38
Hold channel differences
zoom 2
shaped signal
Physics mode Hold difference of 10 ticks
1-2 amplitude change if we get the module mean
value? how to perform the holdscan?? one scan
for each chip 12 positions
zoom 1
39
Hold scan summary for 20 channels in 4 modules
Module 8 Layer 4
Module 6 Layer 2
Module 7 Layer 1
Module 5 Layer 3
40
Production status
  • Cassettes no. 9 and 10 are ready for tests.-
    Tiles for cassette no. 14 are in the test
    procedure at DESY.- Tiles for the next 2
    cassettes will be sent to DESY in about a week.

41
Test beam / Tent activities
  • ECAL moved in front of HCAL
  • DC operational and in the acquisition
  • 20x20x0.5 cm3 veto counter in the readout
  • ECAL is taking calibration data, we are off for
    the moment
  • 31st May installation of 2 VME crates _at_ TB
  • Test rack configuration for CERN
  • Combined DAQ test
  • Exchange modules 5-8 with 9-14 (?)
  • Calibration scan of 9-14 during w.e. 9-12th
    June
  • !! HERA shutdown planned for 12-15th June
  • !! We need urgently the test the third crate for
    the tent
  • Cosmic data taking for 1-4 ongoing in the tent
  • 24-30th May test of 2 new CMB prototypes in the
    tent (Ivo)

42
Production status plan
  • Module 10 and 15 being worked on ? ready for Wed.
    28 ?
  • Module 16 waiting for 33 SiPM spares ? will stay
    at DESY (CMB test)
  • needed by the 3rd of July for CMB test
  • VFE electronics will be mounted after assembly
  • Modules can be moved to test beam in blocks of 4
    (Uwe/Sebastian)
  • Expected next SiPM delivery ?
  • Expected next SiPM test delivery 4 weeks ?
  • In the TB MIP scan and gain calibration (with
    CMB) (Nanda/Sebastian)
  • TB Data analysis
    (Nanda/Nicola/Niels/Sebastian)

43
Shipping to CERN
  • Mon 26
  • disassemble TB system, pack, move electronics
    from tent to TB
  • set up TB DAQ on new VME (if there)
  • Tue 27
  • send to CERN 2 VME NIM 3 PC 3TB disk
    van Erika/Marius/Sven/Sebastian(SBS)
  • Wed 28
  • load track for CERN, departure date ? (Gert)