Title: Reliability Update Condition Management
1Reliability UpdateCondition Management
- Turn Condition Monitoring Findings into Effective
Maintenance Execution
2Who Is 24/7 Systems?
- Started 1998
- Employees have extensive Predictive Maintenance
and Reliability experience - Host Tango Databases for over 200 Large
industrial plants - Users include ALCOA, Cargill, Mittal Steel,
Eastman Chemical, Goodyear, A-B, AK Steel,
Dominion Power, Buckeye, LOOP
3Where do you stand today?
- Lack of standardization across monitoring
technologies - Multiple condition reports
- Emailed reports no integration
- Poor communications
- Poor accountability
- No history of condition problems/ patterns
- Weak analysis of results
4Sources of Condition Information
- Plant monitoring groups
- Contractors
- Repair shops
- Inspectors
- Plant Systems
5Integrate Results Not Data
- Severity
- Fault
- Recommendations
- Comments
- Work order status
- Documents
6Condition Task Work Management
Vibration
IR
Tango Condition Assessment Task
Reports History
Oil Analysis
Motor Testing
Ultrasonics
7Integrated Condition Status Report
- Shows how long condition entries have been open,
awaiting work completion. - Shows how many condition entries have work orders
opened. - Shows assets where all condition entries have had
work completed and are awaiting confirmation by
condition monitoring.
18
8Condition Entry Form
9How the ICR is Used
- Prioritization
- Planning
- Validating maintenance
- Overview
10Communication of Condition Information
Tango Integrated Condition Report
Maintenance Operations Staff Meeting Work
Prioritization
Management Review Oversight
Reliability Repair Validation
Performance Measurements
Planners
Work Order
11Accountability
- High visibility of problems to managers
- Time open provides warning of slow resolution
- Severity and criticality brings major problems to
top of list - Validation assures work performed well
12Eastman Chemicals Kingsport, TN - 2005
- Accountability is consistently based on condition
status and work execution rather than informal
complaints from operations
21
13Use of Historical Condition Information
- Identify chronic failure issues target
reliability improvement initiatives. - Change work procedures and justify special
training tools. - Fine-tune condition monitoring activities.
22
14Program Results
15Program Results
16Using condition history to spot reliability gaps
- Reduction gearboxes quickly stand out with the
highest number of faults. - Drilling into the report would uncover filter
design and lubrication issues as common
denominators behind the gearbox faults.
- Eastman has significantly reduced chronic
equipment problems such as imbalance,
misalignment, lubrication, and installation
issues by using historical failure mode
information to change procedures and justify
special training and tools.
23
17Tango Reliability Management
The next step in your condition based maintenance
program
18What Tango Does
- Easy for contractors and plant teams to use same
database - Provides work task scheduling and reporting
- Integrates Condition Results
- Communicates HOT problems
- Facilitates prioritization, planning, and
validating of critical maintenance - Results accountability
19Why do Plants Use Tango?
- Standardize condition management practices across
multiple plants. - Manage condition analysis contractors.
- Measure condition based maintenance performance.
- Increase visibility of problems to prevent
dropped balls and assure critical repairs are
scheduled and performed promptly. - Maintain a history of condition problems and
patterns.
20Summary of Results at Eastman Chemicals
- Follow-up of predictive maintenance calls now
consistently tracked. -
- Basic maintenance problems related to
installation, imbalance, and misalignment
practically eliminated - Maintenance budget personnel count reduced
while production capacity slightly increased. - Operating area bosses know and care about
whats happening with equipment reliability.
25
21Whats Your Next Step?