Title: Installation Process for Family Nutrition Kit


1
(No Transcript)
2
Installation Process for Family Nutrition Kit
Packed FNK
3
Installation Process for Family Nutrition Kit
2
  • Unpacked FNK
  • 20 Ltrs. Water Bag.
  • Siphon Supply line with Siphon Pump, Filter
    Element On/Off Valve.
  • Assembled Sub-main Line with Four Laterals (5
    meters long) and 44 nos. pre-installed micro-tube
    emitters.

1
3
4
Installation Process for Family Nutrition Kit
  • Layout of Sub-main line with Four Lateral Line

5
Installation Process for Family Nutrition Kit
  • Layout of Laterals with pre-installed Micro-tube
    Emitters

6
Installation Process for Family Nutrition Kit
  • Connect the Siphon Line (Main Supply Line) to the
    Tee Connector Located at the Center of Sub-main
    Line

7
Installation Process for Family Nutrition Kit
  • Fix of a Stand Frame of Bamboo/Wood or Metal.
  • Hang the Water Bag keeping distance ½ Meter from
    the ground level.

½ Meter
8
Installation Process for Family Nutrition Kit
  • Put the Siphon Line (Main Supply) Line into the
    Water Bag.
  • See that Filter Element should placed inside
    bottom of the Water Bag and tie the siphon
    line with stand frame to keep in position.

9
Installation Process for Family Nutrition Kit
  • Fill the Water Bag.

10
Installation Process for Family Nutrition Kit
  • Before pressing the siphon pump, make sure that
    on/off valve is in close position. Press siphon
    pump 2 to 3 times and then open the on/off valve.
    The water will start flowing slowly from water
    bag to sub-main line lateral lines. The flow
    of water will cause the lay flat tubes to get
    inflated .

11
Installation Process for Family Nutrition Kit
  • Water will start to flow out from all micro tube
    emitters. There are eleven number of micro tubes
    pre installed in each lateral. The length of
    each lateral line is 5meter. The micro tube
    emitters are fixed to the lateral at distance of
    45cm. The inside diameter of each micro tube is
    1.2mm and length of each micro tube is 20cm.

12
Installation Process for Laterals Micro-tube
Emitters
  • Hold the Lateral line and insert the 16 mm lock
    sleeve (cut piece of 1 mm thick Lateral Tube)

16 mm Lock Sleeves
13
Installation Process for Laterals Micro-tube
Emitters
  • Slide the Lateral over the Tee Connector
    (already fixed in sub-main line). Then move the
    lock sleeve over the Tee Connector. This process
    will lock the lateral with sub-main Line.

14
Installation Process for Laterals Micro-tube
Emitters
  • The Laterals are required to be punched before
    inserting micro-tube emitters. And before
    punching hole the laterals required to be
    inflated with water. Use plastic punch or thorn
    to punch hole.

15
Installation Process for Laterals Micro-tube
Emitters
  • Insert the micro-tube emitters into Lateral
    towards downward stream. Ensure the micro-tube
    emitters should be 50 cm inside the lateral.