CertificationMaintenance - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

CertificationMaintenance

Description:

AVS Repair, Alteration, and Fabrication Team (RAFT) ... OEMs about repairs, alterations, fabrications, and replacement part designs: ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 8
Provided by: MTON
Category:

less

Transcript and Presenter's Notes

Title: CertificationMaintenance


1
Certification/Maintenance
2
Major Discussion Points (RAFT)
  • AVS Repair, Alteration, and Fabrication Team
    (RAFT)
  • Concerns raised by TC/PC holders and component
    OEMs about repairs, alterations, fabrications,
    and replacement part designs
  • Not adequately engineered and evaluated for
    compliance
  • Being performed on more safety critical parts and
    complex systems increasing the threat to safety,
  • Are being misrepresented as TC/PC holder parts,
    and
  • Create an un-even commercial playing field
    because FAA does not hold all applicants to the
    same standards
  • Chartered an AVS team (AFS/AIR) to review all
    regulations and policy related to repair,
    alteration, and fabrication during maintenance
  • Identify any gaps and recommend possible
    solutions
  • Training and Policy and Rule changes

3
Reaction from the Floor (RAFT)
  • Critical part definition
  • Difference between acceptable and approved data
  • Additional Instructions for Continued
    Airworthiness (ICA) guidance
  • RAFT addressing all these items

4
Major Discussion Points (DAH)
  • Design Approval Holder (DAH) Rules
  • DAH rules are a new approach for facilitating
    timely implementation of certain complex,
    fleet-wide safety initiatives
  • DAH rules rely on a proactive, program management
    approach
  • The FAA has issued two final rules containing DAH
    requirements
  • Enhanced Airworthiness Program for Airplane
    Systems (EAPAS)
  • Aging Aircraft Safety Rule (AASR)
  • The FAA expects to issue the Widespread Fatigue
    Damage (WFD)
  • The FAA, TCCA, EASA, and ANAC have been in close
    coordination since early 2005
  • TCCA, EASA, and ANAC intend to issue similar
    rules

5
Major Discussion Points (DAH)
  • Design Approval Holder (DAH) Rules (EASA)
  • Long term rules
  • Amendment to BR216/2008 Article 5 and task
    21.039.
  • Temporary changes for Aging systems
  • NPA on EWIS (Electrical Wire Interconnect System)
  • AMC20

6
Reaction from the Floor (DAH)
  • Positive feedback from Industry relative to
    overall approach and process
  • Some concerns early on
  • Authorities very responsive
  • Good example of Industry/Authority cooperation
  • Significant harmonization efforts by authorities

7
Outcomes/Additional Ideas
  • The RAFT is preparing a final report that will
    address all existing policy and recommended
    changes and/or clarifications
  • Considers Industry feedback
  • Report is due to be completed by the end of June
  • A notice will be published in the Federal
    Register summarizing RAFT results and
    recommendations
  • The FAA process/policy owner offices will
    implement the recommended changes
Write a Comment
User Comments (0)
About PowerShow.com