Title: Status Report for KEKPS E391a
1Status Report for KEK-PS E391a
- KEK IPNS
- G.Y.Lim
- 14 April 2003
2E391a experiment
- Collaboration
- High Energy Accelerator Research Organization,
KEK - Faculty of Science and Engineering, Saga
University - Department of Physics, Yamagata University
- Department of Physics, Osaka University
- Research Center for Nuclear Physics, Osaka
University - National Defense Academy of Japan
- Joint Institute for Nuclear Research (Dubna)
Russia - Department of Physics, University of Chicago,
USA - Fermi National Accelerator Laboratory, USA
- Department of Physics, Pusan National University,
KOREA
- Measurement of BR( KL?p0nn )
- Two-step program
- (KEK-PS?JPARC)
- From the E391a
- Establish measurement principle
- Search for near SM expectation
- Data taking from Feb. 2004
- Engineering run
- Preparation of detector components
New KEK member Department of Physics, Kyoto
University
3E391a Detector
Engineering Run on last winter
4Engineering Run
- DAQ using self-trigger of CsI
- Same scheme of real run
- Tuning / feed-back
- CsI calibration
- Cosmic test in vacuum chamber
- Cosmic test during stacking
- Punch-through muon
- Two gammas from single p0
- Multi-gamma decay (Kpi2, Kpi3)
- KL decay data same format of real run
- Develop on-line/off-line software
Significant step to the successful experiment
5DAQ with low noise level
- Distributed and parallel processing
- LeCroy 1885N FASTBUS ADC
- TKO HR-TDC
- Operation with tiny noise
- 1mV threshold for TDC ( 1 MeV)
- 50 fC ADC pedestal (0.1 MeV)
6Calibration using cosmic/punch-through muon
Good agreement between two gain factors !
7Calibration using p0-production
8Study using Kpi3 decay
Background free without veto system Comparison
with M.C.
- Good agreement
Calibration method in real run How to get correct
energy scale
Detailed study is going on
9Response at the high Intensity
- PMT gain (Xe monitoring system)
Same performance under the high beam intensity
7.0 X 1011 / 2s 1.4 X 1012 /2s 1.0 X 1012 / 0.2s
10Detector fabrication Upstream
Modules/vacuum chamber done
Assembling on June -July
11Detector fabrication Middle
Fabrication of 3 modules ? Finished 1 module/1
week ? End of Oct. (32 modules)
Design of assembling jigs final stage
Assembling Nov. Dec.
12Schedule
13Summary
- E391a is aiming for measuring the BR( KL?p0nn )
- Realizing Step-by-step
- Engineering run
- Stable data taking using same triggering scheme
of real run - CsI calibration cosmic ray data is very nice
input - No problem at high beam intensity
- Good agreement with M.C.
- Detailed study is going on
- E391a is preparing almost on schedule
- Downstream section is polishing stage
- Upstream/middle section being fabricated
smoothly - Prompt start at the real run (Feb. June, 2004)
- Full beam acceptable