Title: Status Report for KEKPS E391a


1
Status Report for KEK-PS E391a
  • KEK IPNS
  • G.Y.Lim
  • 14 April 2003

2
E391a experiment
  • Collaboration
  • High Energy Accelerator Research Organization,
    KEK
  • Faculty of Science and Engineering, Saga
    University
  • Department of Physics, Yamagata University
  • Department of Physics, Osaka University
  • Research Center for Nuclear Physics, Osaka
    University
  • National Defense Academy of Japan
  • Joint Institute for Nuclear Research (Dubna)
    Russia
  • Department of Physics, University of Chicago,
    USA
  • Fermi National Accelerator Laboratory, USA
  • Department of Physics, Pusan National University,
    KOREA
  • Measurement of BR( KL?p0nn )
  • Two-step program
  • (KEK-PS?JPARC)
  • From the E391a
  • Establish measurement principle
  • Search for near SM expectation
  • Data taking from Feb. 2004
  • Engineering run
  • Preparation of detector components

New KEK member Department of Physics, Kyoto
University
3
E391a Detector
Engineering Run on last winter
4
Engineering Run
  • Fabricate on last summer
  • DAQ using self-trigger of CsI
  • Same scheme of real run
  • Tuning / feed-back
  • CsI calibration
  • Cosmic test in vacuum chamber
  • Cosmic test during stacking
  • Punch-through muon
  • Two gammas from single p0
  • Multi-gamma decay (Kpi2, Kpi3)
  • KL decay data same format of real run
  • Develop on-line/off-line software

Significant step to the successful experiment
5
DAQ with low noise level
  • Distributed and parallel processing
  • LeCroy 1885N FASTBUS ADC
  • TKO HR-TDC
  • Operation with tiny noise
  • 1mV threshold for TDC ( 1 MeV)
  • 50 fC ADC pedestal (0.1 MeV)

6
Calibration using cosmic/punch-through muon
Good agreement between two gain factors !
7
Calibration using p0-production
8
Study using Kpi3 decay
Background free without veto system Comparison
with M.C.
- Good agreement
Calibration method in real run How to get correct
energy scale
Detailed study is going on
9
Response at the high Intensity
  • PMT gain (Xe monitoring system)

Same performance under the high beam intensity
7.0 X 1011 / 2s 1.4 X 1012 /2s 1.0 X 1012 / 0.2s
10
Detector fabrication Upstream
Modules/vacuum chamber done
Assembling on June -July
11
Detector fabrication Middle
Fabrication of 3 modules ? Finished 1 module/1
week ? End of Oct. (32 modules)
Design of assembling jigs final stage
Assembling Nov. Dec.
12
Schedule
13
Summary
  • E391a is aiming for measuring the BR( KL?p0nn )
  • Realizing Step-by-step
  • Engineering run
  • Stable data taking using same triggering scheme
    of real run
  • CsI calibration cosmic ray data is very nice
    input
  • No problem at high beam intensity
  • Good agreement with M.C.
  • Detailed study is going on
  • E391a is preparing almost on schedule
  • Downstream section is polishing stage
  • Upstream/middle section being fabricated
    smoothly
  • Prompt start at the real run (Feb. June, 2004)

- Full beam acceptable