Title: Major Projects Land Combat Development Colonel Tony Luke
1Major ProjectsLand Combat DevelopmentColonel
Tony Luke
1
2Directorate of Land Combat Development
DLCD COL Tony Luke (02) 626 53985
Special Ops LTCOL Martin Skin
DD Combat LTCOL Mark Wellburn
DD Close Combat LTCOL John Baird
DD Combat Spt LTCOL Tim Griggs
LAND 106
LAND 40-2
LAND 17
JP 2097 1A 1B
LAND 112-4
LAND 53-1BR
SF ADRHIB
LAND 146-1/2
LAND 116-3
LAND 125-3
LAND 58-3
LAND 907
LAND 125-4
LAND 19-6
JP 3011
LAND 400-1
LAND 19-7
LAND 91-7
LAND 53-1E
LAND 53-1F
LAND 53-2B
2
3Combat Support Section
- LTCOL Tim Griggs - Deputy Director
-
- Land 17 Artillery Replacement Project
- Land 146-1/2 Combat ID
- Land 19 Ph 7 RBS-70 Enhancement/Replacement
-
3
4LAND 17 - Artillery Replacement
- Key Issues for 2nd Pass
- 2nd Pass Approval planned for June 2009.
- BMS-F basis of provisioning to include Army
Reserve RAA units. -
- Project Aim
- To modernise the Armys fire support system
through the acquisition of a networked BMS-F and
a mixture of protected SP Howitzers and
Lightweight Towed Howitzers. - SPH LW155 Ratio
- New howitzer fleet based on ARA requirement for
6 batteries - - Not less than 2 batteries of protected SP,
and - - Not more than 4 batteries of LW155.
- Schedule
- 1st Pass February 2006
- 2nd Pass June 2009
- ISD 2011-13
- LW155
- ITR evaluation concluded.
- Capability solution identified.
- Acquisition would be via FMS.
- Tactical airlift by ADF CH47D in hot
- temperature, high altitude and high
- threat remains critical to capability.
- SP Howitzer
- Undergoing tender evaluation
- BMS-F
- C2 (AFATDS)
- - ITR evaluation complete.
- - Acquisition via FMS.
- FO System
- - Scope transferred to LAND 146-2.
Contact MAJ Adam Fehlberg
5LAND 146-2 Combat ID
- Project Aim To enhance the operational
effectiveness of the ADFs Land Forces whilst
also decreasing the risk of fratricide. - Scope Increase the provision of general low
technology Combat ID equipment in the Land Force,
and introduce a specialist BMS for the digital
terminal control of Joint Fires (Artillery, NSFS
and CAS) by Artillery Forward Observers and Joint
Terminal Attack Controllers. - Schedule
- 2nd Pass 4Q 2009
- ISD 2010
- Issues
- Transfer of LAND 17 BMS-F(FO) liability to LAND
146-2 - CDG finalising Capability Definition Documents
- DMO finalising acquisition strategy
- DCP Guidance 100 - 150m.
5
Contact SQNLDR Jeff Peterson
6LAND 19-7RBS-70 Enhancement/Replacement
Contact MAJ Marc Bryant
- Issues
- Good feedback from industry provided through the
Project Capability Study. - - 18 responses (of which 3 from Australian
based - companies).
- - IQPC Air Defence Systems Conference held in
Berlin in - mid Sep 08 declared the LAND 19-7 Capability
Study - to be a landmark document.
- Integrated Capability Team to engage industry
early - Development of Preliminary CDD suite in 2009.
- Integration within the ADF Integrated Air and
Missile Defence System, and coalition partners. - CDG interested in Multi-Mission Radars.
- Project Aim
- Enhance the current GBAD system which may
include new technologies and systems that are
also capable of countering rockets, artillery and
mortars - Schedule
- 1st Pass 2012
- 2nd Pass 2015
- ISD 2018 20.
- Funding
- 750m 1b (DCP 06-16)
Potential Introduction Into Service Approach
Stage 1
Stage 2
Stage 3
GBAMD C4I / Sensor
New GBAMD C4I / Sensor
GBAMD C4I / Sensor
CRAM
New CRAM
or
Legacy RBS-70
Legacy RBS-70
Legacy RBS-70
New MRAD
6
7Close Combat Section
- LTCOL John Baird
- Deputy Director Close Combat
- LAND 40 Ph 2 Direct Fire Support Weapon
- LAND 125 Ph 3 Soldier Combat System
- LAND 125 Ph 4 Soldier Combat System
- LAND 53 Ph 1BR Project NINOX Night Fighting
Equipment Replacement - JP 3011 Joint Non-Lethal Capability (JNLC)
- LAND 159 ADF Small Arms Replacement
8LAND 40 Phase 2Direct Fire Support Weapon
- Project Aim Land 40-2 will provide a range of
direct fire support weapons for use by ARA
infantry battalions. - Project Status Pre 2nd Pass
- YOD 08/09
- ISD 09 - 10
- DCP guidance 150 - 200m
- Issues
- Competitive trials complete.
- Source Evaluation ongoing.
- Contact CAPT Derrek Lush
8
9LAND 125 Ph 3Soldier Combat System
- Project Aim - Land 125 provides enhancements to
the close combatant within small combat units of
the ADFs close combat force to achieve combat
overmatch and ensure a high chance of success and
survival. - Approach Currently employing a multi-phase
spiral development and acquisition approach
coupled with Service minor and rapid
acquisitions. - Project Status Pre 2nd Pass
- Project Deliverables
- Phase 2A Definition Study - Complete
- Phase 2 B ISD 05/06 - Complete
- Phase 3 ISD from 10. Soldier Enhancement Version
2 - Phase 3 DCP guidance 450 - 600m
- Issues
- L125-3A C4I - combined L125 and L75 BMS, CRS
NMS. - L125-3B Survivability - body, eye and hearing
protection. - L125-3C Lethality - EF88 ICW under-development.
- ADF seeking primes for sub-systems where feasible.
Contact MAJ Thomas Basan
9
10LAND 125 Ph 4Soldier Combat System
- Project Aim - Land 125 Phase 4 provides an
INTEGRATED SOLDIER SYSTEM to the close combatant
and combat teams to achieve overmatch and ensure
a high chance of success and survival. - Approach Yet to be decided.
- Project Status Pre 1st Pass
- Project Deliverables
- Phase 4 YOD 2011/12. Soldier Enhancement Version
3 - Phase 3 DCP guidance 250 - 350m
- Issues
- C4I Incorporate soldier into Command,
Engagement and Sensor Grids. - Survivability Protect against environmental and
emerging threats. - Lethality - Incorporate networked cooperative
engagement. - Mobility Improve individual and team agility.
- Weight/ergonomics/volume
- Sustainability Maximise team viability
- Power system source, storage, management.
- ADF seeking primes for sub-systems where
feasible. - DSTO to lead science and technology engagement
for Phase 4.
Contact MAJ Thomas Basan
10
11LAND 53 Ph 1B/R - Project NINOX Night Fighting
Equipment Replacement
- Project Aim Seeks to replace/refurbish existing
night fighting equipment systems (NVG, NWS and
NAD). - Project Status Pre 1st Pass (Project Definition
Stage) - YOD 2013
- ISD 2014-2015
- DCP Guidance 150m - 250m
- Issues
- Technology maturity
- Innovations in Image Intensification (FOV,
resolution, weight, power) - Short Wave IR and Long Wave IR solutions entering
the marketplace - Uncooled TI performance (weight, range,
resolution, power) - Fused technology options (TRLs in project
timeframe, costs, reliability, weight, power). - Human factors
- integration useability (particularly weight and
dimensions) impact on the soldier. - Contact MAJ John Snell
12JP 3011 Joint Non-Lethal Capability
- Project Aim To develop a Joint Non-Lethal
capability that spans all technology
classifications. - Project Status Pre 1st Pass
- YOD 2013-14
- ISD Phase 1 2015
- DCP guidance TBC m
- Technology Classes being examined
- Acoustic,
- Chemical,
- Electrical,
- Electromagnetic,
- Kinetic, and
- Mechanical.
- Issues Address significant policy and concept of
use issues. - Contact MAJ John Snell
12
13LAND 159 ADF SMALL ARMS REPLACEMENT
- Project Aim Seeks to replace existing ADF Small
arms fleet. - Project Status Pre 1st Pass
- YOD 2019
- ISD 2020
- DCP guidance TBC m
- Issues
- New family of Small Arms,
- Focus on
- Personal Defence Weapons,
- Individual Combat Weapons, and
- Support Weapons.
- Contact MAJ John Snell
13
14LTCOL Mark WelburnDeputy Director Combat
Combat Section
LAND 112 Ph 4 ASLAV EnhancementLAND 400 Ph
1 Survivability of Ground Forces
15LAND 112 PHASE 4ASLAV ENHANCEMENT
- Phase 1 acquired 15 USMC LAVs for trial.
- Phase 2 acquired 113 ASLAV to equip 2 Cav Regt.
- Phase 3 acquired additional 144 vehicles
upgraded 113 Phase 2. - Phase 4 is a proposed survivability and
situational awareness mid-life upgrade. - Project status. First Pass approval achieved 10
Oct 06. Currently progressing prototyping and
acquisition options. - Improvements. Integration of electronic and
mechanical systems including - Enhanced ballistic, mine, fragmentation blast
protection - Battlefield management,
- Signature management, and
- Defensive Aide Suite.
- Status. Pre-Second Pass. YOD 2010/11 2012/13.
- ISD 2012-2014.
- DCP Guidance A200m-250m.
- Contact MAJ Dorian Serfontein
16LAND 400 PHASE 1SURVIVABILITY OF GROUND FORCES
- Project Aim. To enhance the survivability of land
forces in combat operations through the provision
of new warfighting systems. Will incrementally
replace the Armys current combat, combat support
and some combat service support systems. - Status. Pre-1st Pass. Options Review Committee
briefed in March and July 2007. Work has
commenced with Army to develop an agreed Defence
position on Armys future force structure in
order to underpin capability options for Phase 1
and total project. Concurrent work underway to
specify in more detail the future mechanised,
cavalry and mounted infantry battle group
requirements to support cost and priorities for
Phase 1. The RFI conducted in 2006 has been
critical to identify the likely total cost of the
project. - YOD 2011/12 2013/14.
- DCP Guidance A1b - 1.5b.
- Contact CAPT Tom Booler/LTCOL Mark Welburn
17Special Operations Support Cell
18Special Operations projects
- JP 2097 REDFIN Enhancing Special Operations
(NSC in 3rd Quarter 2009) - JP199, JP2088, LAND132 raising SOCOMD, TAG East
and 4 RAR (Cdo) (85 acquired) - JP2088 Ph1A SF Airdroppable Rigid Hull
Inflatable Boat (ADRHIB) (in delivery)
19JP2097 - REDFIN
- The aim of Joint Project 2097 (nicknamed REDFIN)
is to enhance the ADF Special Operations
capability, in order to maintain a capability
edge over emerging threats to Australias
national interests. -
- Phase 1 - Requirements and Acquisition phases of
the Capability Development cycle. 350m to
450m. Address shortfalls in C4ISTAR and Land
Mobility. - Phase 2 - yet to have its Needs considered in
detail by the Capability Development Group,
likely to address Soldier Systems.
20JP2097 Phase 1
- Phase 1 of Joint Project 2097 has been further
split into two sub-phases - Phase 1A is an approved project to replace the
ageing Long Range Patrol Vehicles. - Phase 1B addresses C4ISTAR (NSOC) and Land
Mobility deficiencies. - NSOC Networked Special Operations Capability
21Questions
21