Title: 1z0-1003 Braindumps
1Now Pass Your Oracle 1z0-1003 Exam With More
Efficient Way
2Keep in Touch With Exams4sure
The Name Of Pride and Success
3HELLO!
- I am Blair Jordan
- I am here because I love to give presentations.
- You can find me at _at_Exams4sure.net
4First Step
1
- Research about Your Certification
5- Education is the most powerful weapon which you
can use to change the world
6Exams4sure Features
- 100 Real Exam Questions
- World-Wide Valid
- 3 Months Free Updates
- Get a free Demo before purchase
7Exam Preparation
8Here are some 1z0-1003 Sample Exam Questions
- Exams4sure the name of PRIDE and Success
9Question No 1-
Which two customer requirements are solved using
work skills? A. Activity assignments result in
the least amount of travel time possible. B.
Field resources are assigned certain activities
based on the level of tenure they have at the
company. C. Activity assignments do not result in
overtime. D. Activities that have building access
restrictions are only routed to resources that
have access to the building. Answer C D
https//www.exams4sure.net/oracle/1z0-1003-exam-qu
estions-dumps.html
10Question No 2-
When receiving the Resource Tree, Which icon
represents a "normal" load of activities for a
field resource? A. Option A B. Option B C.
Option C D. Option D E. Option E Answer D
https//www.exams4sure.net/oracle/1z0-1003-exam-qu
estions-dumps.html
11Question No 3-
Which two are correct statements regarding Daily
Extract file data configuration? A. Separate
Daily Extract files must be set up for data to be
used in BICS and DBaaS. B. Customized data sets
can be created for individual instances of
OFSC. C. Data from a single data set can be
configured to be extracted in any number of Daily
Extract files D. All data sets can be configured
to include custom properties and fields. E. Daily
Extract files cannot be set up to extract data
from multiple data sets Answer C D
https//www.exams4sure.net/oracle/1z0-1003-exam-qu
estions-dumps.html
12Question No 4-
A utility company sees several "New Connect"
activities being dropped into the routing bucket
during the day. They want "Meter Read" activities
to be removed from the technician's route so that
the "New Connect" activities can be assigned if
the technician qualifies for the activity They
enabled reoptimization in their route plan and
created a reoptimization filter targeting the
"Meter Read" activities. What additional settings
are required in the route plan to meet the
desired behavior? A. Set the reoptimization goal
to "Assign high priority activities". Then set
cost of not assigning an activity for "Meter
Read" on activities in existing routes to "High",
whereas cost of not assigning an activity for
"New Connect" in activities in the routing bucket
to "Low". B. Set the reoptimization goal to
"Reduce Overdue". Then set cost of not assigning
an activity for "Meter Read" on activities in
existing routes to "High", whereas cost of not
assigning an activity for "New Connect" in
activities in the routing bucket to "Normal". C.
Set the reoptimization goal to "Assign high
priority activities". Then set cost of not
assigning an act or "Meter Read" on activities in
existing routes to "Low", whereas cost of not
assigning an activity for "New Connect" in
activities in the routing bucket to "High". D.
Set the reoptimization goal to "Assign high
priority activities". Then set cost of not
assigning an activity for "Meter Read" on
activities in existing routes to "Highest",
whereas cost of not assigning an / for "New
Connect" in activities in the routing bucket to
"Normal. Answer D
https//www.exams4sure.net/oracle/1z0-1003-exam-qu
estions-dumps.html
13Question No 5-
A dispatcher needs to be able to quickly see
which contractor technicians have started working
for the current day. How doryou configure the
system to support this requirement? A. Enable
the Messages report within a Dashboard, which can
be filter condition and 'Resource Type' for the
current date. B. Configure the Resources list to
ensure that values for the 'Show/Hie Queues' and
'Resource Type' filters can be selected. C.
Configure a resource filter with the conditions
'Resource Type in Cc PM1, and 'Activated is not
null' for use within the List/Time/Map/Dai D.
Create a step within a Message Scenario to set an
'Activated' custo whenever the 8 AM - 5 PM shift
is assigned. Answer B
https//www.exams4sure.net/oracle/1z0-1003-exam-qu
estions-dumps.html
14Visit us
buy15
Get 15 Discount
15THANKS!
- Any questions?
- You can find me at
- _at_https//www.exams4sure.net/