AF EOD ROBOTICS UPDATE (Users Perspective)
Mr. Jim Russell HQ ACC/CEXE
This Briefing is UNCLASSIFIED
2
OVERVIEW
  • Background
  • AF EOD Robotics Now
  • AF EOD Robotics Future
  • Conclusion

3
BACKGROUND
  • AF EOD robotics requirements aligned with
    joint vision
  • and doctrine
  • DoD Joint Vision 2010
  • Leveraging joint-service efforts and emerging
    technologies
  • Objective People protection
  • EOD robotics is 1 Civil Engineer (CE)
    modernization
  • initiative.

4
AF EOD ROBOTICS NOW
5
AF EOD ROBOTICS NOWMk VI Andros
6
AF EOD ROBOTICS NOW RONS (Upgraded Mk II RCT)
7
AF EOD ROBOTICS NOW All-purpose Remote Transport
System (ARTS)
ARTS with Ordnance Removal Blade
90mm Water Cannon
8
AF EOD ROBOTICS NOW AF EOD Robot Family
9
AF EOD ROBOTICS NOW
  • Current Status
  • 37 of 47 ARTS funded
  • 26 of 89 RONS funded
  • 68 of 85 MKVI Andros robots funded/fielded
  • Funding Challenges
  • Gain procurement funding to fix requirement
    shortfall
  • 10 unfunded ARTS
  • 63 unfunded RONS
  • 17 unfunded MKVI Andros

10
AF EOD ROBOTICS NOW
  • The Fix Plan - POM Initiatives
  • FY00 POM
  • Submitted procurement initiative - not funded
  • FY02 POM
  • Submitted procurement initiative
  • Funded by ACC offsets, but lost during AF POM
    cycle
  • FY03 APOM
  • Submission includes request for unfunded ARTS,
    RONS, plus buy-in to next generation robotics
  • Fall-back Plan Reprogram from lower priority
    programs to fund EOD robots

11
AF EOD ROBOTICS NOW
  • FY03 APOM Initiative
  • (M)
  • FY03 04 05 06 07 08
  • AF EMD 0.5 0.5 0.5 0.5
    0.5 0.5
  • Procurement 3.7 3.9 2.8 2.9
    1.4 2.3

12
AF EOD ROBOTICS NOW
  • FY98 - FY00 Procurement
  • (M)
  • FY98 99 00
  • ARTS 2.5 1.8
    3.0
  • RONS 0.0 1.0
    1.5
  • MK VI 2.5 1.9 1.1
  • Grand Total 15.3M

13
ROBOTICS FUTURE
14
ROBOTICS FUTURENEAR TERM
  • Three ARTS attachments programmed for EMD
  • HEADD delivery system
  • Fiber optics
  • Manipulator arms
  • Integrate chemical/biological detection
    capability
  • with ARTS/RONS/MKVI

15
ROBOTICS FUTUREMID TERM
  • Upgrade MKVI Andros
  • Leverage next generation robotics
  • ARTS water cutter integration
  • On-board ARTS remote firing system

16
ROBOTICS FUTURELONG TERM
  • Next generation robotics
  • Laser ordnance neutralization system
  • Expand the use of robots in other Civil Engineer
    disciplines
  • Fire protection
  • Environmental
  • Readiness (NBC/WMD)

17
CONCLUSION
  • EOD robotics is AF 1 Civil Engineer
    modernization priority
  • Will continue to POM for additional procurement
    funding
  • Backup plan break other CE programs to fix EOD
    robots
  • Robots provide AF EOD a tool that enables them to
    perform hazardous tasks while keeping the EOD
    tech out of harms way
  • We plan to continue to leverage JRP, NAVEODTECH,
    TSWG, and EOD/LIC RD to modernize our family
    of robots

18
QUESTIONS??
19
POC
  • HQ ACC/CEXE129 Andrews St Ste 102Langley
    AFB, VA 23665-2769DSN 574-2706/Fax
    574-5355james.russell_at_langley.af.mil
Write a Comment
User Comments (0)
About PowerShow.com