Title: DES Review
1DES Review
- DES Front End Electronics
- WBS 1.3
- T. Shaw
2DES FE Project Definition
- We must read out a large focal plane of CCDs
- 62 Science CCDs
- 8 Alignment CCDs
- 4 Guide CCDs
- The Science and Alignment CCDs are read out at
the same rate with the same clocking patterns - 250k-pixels/s _at_ 10e- rms noise
- The Guide CCDs will be readout at a faster rate
will not interfere with required quiet time of
Science and Alignment CCDs
3DES FE Electronics WBS structure
4LBL CCD
CCD Bond Pads
2048 x 4096 15 µm pixel CCD
Vertical clocking moves charge towards
serial register
Horizontal clocking moves charge along serial
output register to video output amplifiers
5Signal Count per CCD
- Each CCD will require control of the following
signals - Horizontal clocking
- H1_U, H1_L, H2_U, H2_L, H3_U, H3_L, SW, RG
- Vertical clocking
- V1, V2, V3, TG
- Erase control
- n guard
- Bias voltages
- Vr_U, Vr_L, Vdd, Vopg, Vsub
- Totals 13 clocks per CCD
- 5 bias levels per CCD
- Tuning of optimal CCD readout is accomplished
by adjusting clock rail voltages and bias
settings. We are assuming, relying on current
test results, that production readout can group
at least 3 CCDs together with like clock rail
settings. -
6CCD Packaging Picture FrameWBS 1.3.1
CCD is wire bonded to a polymide board
7CCD Packaging Pedestal PackageWBS 1.3.2
37-pin Nanonics Dualobe connector
CCD is wire bonded to an AlN board
8Monsoon Readout SystemWBS 1.3.6
- Monsoon
- Developed by NOAO
- Crate based system (Eurocard format)
- cPCI backplane used (no cPCI protocol)
- Open Design
- Schematics available
- Firmware available
- Layout files available
- Boards exist
- Master Control Board
- Clock and Bias Board
- 8 Channel Acquisition Board
- Large software framework exists
- http//www.noao.edu/ets/monsoon/
9Monsoon Block Diagram
10Monsoon Crate
MCB
CBB
8-Ch CCD Acq.
11History of Monsoon at FNAL
- Mid 2004
- DES group looks into the Leach and Monsoon
Systems as possible readout solutions. Leach is
an established proprietary readout system for
CCDs. Monsoon offered some advantages higher
density (8 channel card vs 2 channel card of
Leach) telemetry readout (readback of clock rail
voltages and bias voltages) designed for large
mosaics open architecture easy to customize.
(Lots of manpower already expended by NOAO on
Monsoon 12 engineering years/5 programmer
years/5 board layout years.) - University of Illinois Urbana-Champaign began to
purchase the initial Monsoon test stands. - March 2005
- FE workshop at FNAL decision to continue to
pursue Monsoon as readout platform. - April 2005
- Receive MCB, CBB and a blank prototype 8 ch CCD
Acq Board to be hand assembled. - Never able to achieve low noise.
- Nov 2005
- Delivery of 2 complete Monsoon systems (MCB, CBB
and production 8 ch CCD Acq Board). - Fairly quickly began running with lt10e- noise at
12us/pixel. - Jan 2006
- FNAL takes delivery of Leach System. Leach
performance quickly matches Monsoon performance. - Feb 2006
- FEE Panel formed to examine choice of design
platform. Specifically, to look at Leach and
Monsoon.
12History of Monsoon at FNAL
- Feb 2006
- Delivery of two additional complete Monsoon
Systems. One was shipped to Barcelona - Mar 2006
- With short cable run, we are able to achieve
6.5e- noise at 6us/pixel - April 2006
- With a pre-amp (WBS 1.3.5) located outside of
dewar wall, we are able to achieve 6.5e- noise
at 6us/pixel with a long cable - June 2006
- FEE Panel tasked with examining choice of Monsoon
vs Leach comes back with its findings. - In summary
- Monsoon work seems to be progressing
- Keep an eye on 12 Channel Board design fallback
to use current 8 Channel Board - Leach Controller remains a viable alternative in
case of unforeseen problem with Monsoon. - July 2006
- Delivery of fourth Monsoon system for FNAL
13Pre-amp Board (WBS 1.3.5) currently outside of
dewar
14Proposed Changes to Monsoon
- To use the Monsoon System for DES, we will
customize the boards for our specific
application - Build a 12 channel CCD Acq Module which would
provide customized bias voltages, RTD readout,
and Vsubstrate ramp control. (WBS 1.3.8) - Build a customized Clock Board to better address
our clocking needs greater fanout ability to
drive more clocks. (WBS 1.3.7) - Slight modification to the Master Control Board
to allow for switch to S-Link as the fiber optic
link. (WBS 1.3.9) - Breakout session will cover these new board
designs in more detail.
15PF Packaging WBS 1.3.10
- UIUC has worked with FNAL mechanical engineers
and proposes to instrument the telescope using
three FE crates. - These crates would each contain two backplanes
one with 6 slots and one with 4 slots. - A single 4-slot section would provide for readout
of up to 9 guide CCDs - The remaining backplane sections would provide
readout of up to 72 science and alignment CCDs. - UIUC is also providing engineering support for
crate power supplies.
16Vacuum Interface Board(VIB) WBS 1.3.4
Vacuum Interface Board will provide the
connection between the Monsoon boards and the
CCDs on the focal plane. Monsoon cables will
plug into the VIB outside the vacuum. Kapton
cables will be used to connect between Vacuum
Interface Board and the CCDs inside the dewar.
17Camera Vessel Instrumentation
Kapton Cable WBS 1.3.3
Vacuum Interface Board WBS 1.3.4
AlN Board WBS 1.3.2
18DES FE Electronics L3 Milestones
19Monsoon Electronics Schedule Milestones
20DES Electronics Schedule Milestones
21Engineering Teams/Responsibilities
- FNAL
- (T. Shaw, D. Huffman, M. Kozlovsky, Jamieson
Olsen, Walter Stuermer) - Instrumentation of CCD testing stations
- 12 Channel CCD Acq Module Transition
- Vacuum Interface Board
- Cabling
- Pre-amps
- UIUC
- (T. Moore, V. Simaitis)
- Crate
- Power Supply
- Barcelona
- (Laia Cardiel, Miquel Barceló)
- Clock Bias Board Fanout Transition Module
- Clock Board Transition
- Master Control Board
- Madrid
- (Gustavo Martinez, Javier Castilla, Juan De
Vicente) - Clock Board
22FE Electronics Costs
23Conclusions
- FE Readout is based upon the Monsoon system. This
is working for the readout of our small test
dewars. New customized Monsoon modules are being
designed to address specific DES requirements. - Leach remains as a fallback to the Monsoon
readout solution. - Next plans
- Readout an array of CCDs in the large test dewar.
- Optimize cable design location of pre-amp.
24Backup slide
25Monsoon Quantity/Cost estimates