Title: DES Review


1
DES Review
  • DES Front End Electronics
  • WBS 1.3
  • T. Shaw

2
DES FE Project Definition
  • We must read out a large focal plane of CCDs
  • 62 Science CCDs
  • 8 Alignment CCDs
  • 4 Guide CCDs
  • The Science and Alignment CCDs are read out at
    the same rate with the same clocking patterns
  • 250k-pixels/s _at_ 10e- rms noise
  • The Guide CCDs will be readout at a faster rate
    will not interfere with required quiet time of
    Science and Alignment CCDs

3
DES FE Electronics WBS structure
4
LBL CCD
CCD Bond Pads
2048 x 4096 15 µm pixel CCD
Vertical clocking moves charge towards
serial register
Horizontal clocking moves charge along serial
output register to video output amplifiers
5
Signal Count per CCD
  • Each CCD will require control of the following
    signals
  • Horizontal clocking
  • H1_U, H1_L, H2_U, H2_L, H3_U, H3_L, SW, RG
  • Vertical clocking
  • V1, V2, V3, TG
  • Erase control
  • n guard
  • Bias voltages
  • Vr_U, Vr_L, Vdd, Vopg, Vsub
  • Totals 13 clocks per CCD
  • 5 bias levels per CCD
  • Tuning of optimal CCD readout is accomplished
    by adjusting clock rail voltages and bias
    settings. We are assuming, relying on current
    test results, that production readout can group
    at least 3 CCDs together with like clock rail
    settings.

6
CCD Packaging Picture FrameWBS 1.3.1
CCD is wire bonded to a polymide board
7
CCD Packaging Pedestal PackageWBS 1.3.2
37-pin Nanonics Dualobe connector
CCD is wire bonded to an AlN board
8
Monsoon Readout SystemWBS 1.3.6
  • Monsoon
  • Developed by NOAO
  • Crate based system (Eurocard format)
  • cPCI backplane used (no cPCI protocol)
  • Open Design
  • Schematics available
  • Firmware available
  • Layout files available
  • Boards exist
  • Master Control Board
  • Clock and Bias Board
  • 8 Channel Acquisition Board
  • Large software framework exists
  • http//www.noao.edu/ets/monsoon/

9
Monsoon Block Diagram
10
Monsoon Crate
MCB
CBB
8-Ch CCD Acq.
11
History of Monsoon at FNAL
  • Mid 2004
  • DES group looks into the Leach and Monsoon
    Systems as possible readout solutions. Leach is
    an established proprietary readout system for
    CCDs. Monsoon offered some advantages higher
    density (8 channel card vs 2 channel card of
    Leach) telemetry readout (readback of clock rail
    voltages and bias voltages) designed for large
    mosaics open architecture easy to customize.
    (Lots of manpower already expended by NOAO on
    Monsoon 12 engineering years/5 programmer
    years/5 board layout years.)
  • University of Illinois Urbana-Champaign began to
    purchase the initial Monsoon test stands.
  • March 2005
  • FE workshop at FNAL decision to continue to
    pursue Monsoon as readout platform.
  • April 2005
  • Receive MCB, CBB and a blank prototype 8 ch CCD
    Acq Board to be hand assembled.
  • Never able to achieve low noise.
  • Nov 2005
  • Delivery of 2 complete Monsoon systems (MCB, CBB
    and production 8 ch CCD Acq Board).
  • Fairly quickly began running with lt10e- noise at
    12us/pixel.
  • Jan 2006
  • FNAL takes delivery of Leach System. Leach
    performance quickly matches Monsoon performance.
  • Feb 2006
  • FEE Panel formed to examine choice of design
    platform. Specifically, to look at Leach and
    Monsoon.

12
History of Monsoon at FNAL
  • Feb 2006
  • Delivery of two additional complete Monsoon
    Systems. One was shipped to Barcelona
  • Mar 2006
  • With short cable run, we are able to achieve
    6.5e- noise at 6us/pixel
  • April 2006
  • With a pre-amp (WBS 1.3.5) located outside of
    dewar wall, we are able to achieve 6.5e- noise
    at 6us/pixel with a long cable
  • June 2006
  • FEE Panel tasked with examining choice of Monsoon
    vs Leach comes back with its findings.
  • In summary
  • Monsoon work seems to be progressing
  • Keep an eye on 12 Channel Board design fallback
    to use current 8 Channel Board
  • Leach Controller remains a viable alternative in
    case of unforeseen problem with Monsoon.
  • July 2006
  • Delivery of fourth Monsoon system for FNAL

13
Pre-amp Board (WBS 1.3.5) currently outside of
dewar
14
Proposed Changes to Monsoon
  • To use the Monsoon System for DES, we will
    customize the boards for our specific
    application
  • Build a 12 channel CCD Acq Module which would
    provide customized bias voltages, RTD readout,
    and Vsubstrate ramp control. (WBS 1.3.8)
  • Build a customized Clock Board to better address
    our clocking needs greater fanout ability to
    drive more clocks. (WBS 1.3.7)
  • Slight modification to the Master Control Board
    to allow for switch to S-Link as the fiber optic
    link. (WBS 1.3.9)
  • Breakout session will cover these new board
    designs in more detail.

15
PF Packaging WBS 1.3.10
  • UIUC has worked with FNAL mechanical engineers
    and proposes to instrument the telescope using
    three FE crates.
  • These crates would each contain two backplanes
    one with 6 slots and one with 4 slots.
  • A single 4-slot section would provide for readout
    of up to 9 guide CCDs
  • The remaining backplane sections would provide
    readout of up to 72 science and alignment CCDs.
  • UIUC is also providing engineering support for
    crate power supplies.

16
Vacuum Interface Board(VIB) WBS 1.3.4
Vacuum Interface Board will provide the
connection between the Monsoon boards and the
CCDs on the focal plane. Monsoon cables will
plug into the VIB outside the vacuum. Kapton
cables will be used to connect between Vacuum
Interface Board and the CCDs inside the dewar.
17
Camera Vessel Instrumentation
Kapton Cable WBS 1.3.3
Vacuum Interface Board WBS 1.3.4
AlN Board WBS 1.3.2
18
DES FE Electronics L3 Milestones
19
Monsoon Electronics Schedule Milestones
20
DES Electronics Schedule Milestones
21
Engineering Teams/Responsibilities
  • FNAL
  • (T. Shaw, D. Huffman, M. Kozlovsky, Jamieson
    Olsen, Walter Stuermer)
  • Instrumentation of CCD testing stations
  • 12 Channel CCD Acq Module Transition
  • Vacuum Interface Board
  • Cabling
  • Pre-amps
  • UIUC
  • (T. Moore, V. Simaitis)
  • Crate
  • Power Supply
  • Barcelona
  • (Laia Cardiel, Miquel Barceló)
  • Clock Bias Board Fanout Transition Module
  • Clock Board Transition
  • Master Control Board
  • Madrid
  • (Gustavo Martinez, Javier Castilla, Juan De
    Vicente)
  • Clock Board

22
FE Electronics Costs
23
Conclusions
  • FE Readout is based upon the Monsoon system. This
    is working for the readout of our small test
    dewars. New customized Monsoon modules are being
    designed to address specific DES requirements.
  • Leach remains as a fallback to the Monsoon
    readout solution.
  • Next plans
  • Readout an array of CCDs in the large test dewar.
  • Optimize cable design location of pre-amp.

24
Backup slide
25
Monsoon Quantity/Cost estimates