Jean-Pierre Gattuso and the EPOCA consortium
www.epoca-project.eu
2
Jean-Pierre Gattuso and the EPOCA consortium
www.epoca-project.eu
3
EPOCA - European Project on OCean Acidification
epoca-project.eu
  • EPOCA is the European research initiative on
    ocean acidification
  • 4-year long FP7 project more than 100 PIs from
    27 institutes and 9 European countries
  • Total budget 15.9 M, EU contribution 6.5 M
  • Four research themes
  • Theme 1 Changes in ocean chemistry and
    biogeography (past and present)
  • Theme 2 Biological and ecosystem responses,
    acclimation and adaptation (including cold-water
    corals)
  • Theme 3 Biogeochemical impacts and feedbacks
    (modeling)
  • Theme 4 Synthesis, dissemination and outreach
    (tipping points)

4
What is ocean acidification?
epoca-project.eu
When CO2 invades sea water bicarbonates
concentration increases carbonate
concentration decreases CaCO3 saturation state
(O) decreases a small part of the bicarbonate
formed dissociates into carbonates H (ocean
acidification)
Redrawn from Körtzinger
5
Southern Ocean perspective
Jim Orr, CEA/IAEA
6
Thecosome Pteropods
  • Important ecological role
  • Important food source for marine predators
    (zooplanctons, salmons, herrings, wales,)
  • Can replace krill in the Southern Ocean
  • Carbon pump in the Southern Ocean
  • Mucus web

7
Perturbation experiments (LOV-IAEA)
Steeve Comeau, PhD Student, Univ. Paris 6
8
Two items in the first call of FP7(Dec. 2006)
epoca-project.eu
  • Ocean acidification and its consequences
    (ENV.2007.1.1.3.1). Funding scheme collaborative
    projects (large-scale integrating projects)
  • Dynamic of marine ecosystem in a changing
    environment (ENV.2007.2.2.1.4.). Funding scheme
    collaborative projects (large-scale integrating
    projects)

9
Time line
epoca-project.eu
  • July 2006 first discussions with Jim Orr
  • September 2006, Villefranche-sur-mer meeting of
    the 10 core partners
  • November 2006 visit to BXL (J.-P. Gattuso and C.
    Heinze)
  • 22 December 2006 call for proposals
  • January 2007, Gif-sur-Yvette meeting of the core
    partners
  • February 2007, Salzau meeting of all PIs
  • March 2007 planning group finalizes proposal
  • 2nd May 2007 submission
  • 31 October 2007 start negotiation
  • February 2008 end negotiation
  • 1st May 2008 project launch (4 years)
  • 10-13 June 2008 kickoff meeting (Nice)
  • 10

10
European Project on OCean Acidification
epoca-project.eu
  • 27 partner institutions (29 laboratories)
  • 105 permanent scientists
  • Planning group
  • Jelle Bijma (AWI, Germany)
  • Jean-Pierre Gattuso (coordinator, CNRS,
    France)
  • Marion Ghelen (LSCE, France)
  • Ulf Riebesell (IFM-GEOMAR, Germany)
  • Carol Turley (PML, United Kingdom)
  • Budget
  • EU contribution 6.5 M
  • Total budget 16 M
  • May 2008-May 2012

11
Consortium 27 institutions, 100 PIs
epoca-project.eu
12
Overall goals
epoca-project.eu
  • Improve the understanding of the past and present
    spatio-temporal changes of ocean acidification
    due to increasing CO2 uptake.
  • Determine the impacts of ocean acidification on
    marine biota, their physiology, ecosystems, the
    potential for acclimation and adaptation, impacts
    on elemental cycling and production of
    climate-relevant gases.
  • Improve understanding of future changes in ocean
    chemistry and biogeochemical feedbacks in terms
    of hotspots, uncertainties, and thresholds. It
    will also improve the description of the carbon
    cycle in coupled ocean-climate models. The key
    element cycles investigated are carbon, nitrogen,
    sulfur and iron.
  • Synthesize information on tipping points.

13
Overall strategy
epoca-project.eu
14
Theme 1 Changes in ocean chemistry and
biogeography (J. Bijma)
epoca-project.eu
  • WP2 Past variability of ocean chemistry
    (paleoreconstruction) (H. Elderfield)
  • WP3 Present-day observations of ocean chemistry
    and biogeography (T. Tyrrell)

15
Theme 2 Ecosystem impacts, acclimation and
adaptation (U. Riebesell)
epoca-project.eu
  • WP4 Sensitivity of calcification (D.
    Iglesias-Rodriguez)
  • WP5 Sensitivity of autotrophic processes (A.
    Engel)
  • WP6 Performance reproduction and growth (H.-O.
    Pörtner)
  • WP7 Microbial diversity and activity, in
    particular nitrogen cycling (J. Middelburg)
  • WP8 Impact on trophic interactions (F. Thingstad)
  • WP9 From process studies to ecosystem models
    (cross-cutting with theme 3)(A. Oschlies)

16
Theme 3 Biogeochemical impacts and feedbacks (J.
Orr)
epoca-project.eu
  • WP10 Future changes of ocean carbonate chemistry
    (F. Joos)
  • WP11 Biogeochemical impacts (M. Gehlen)
  • WP12 Assessment and Earth system feedbacks (F.
    Joos)

17
Theme 4 Synthesis, dissemination and outreach
(C. Turley)
epoca-project.eu
  • WP13 Uncertainties, risks and thresholds (C.
    Turley)
  • WP14 Dissemination, exploitation and management
    of knowledge (C. Turley)
  • WP15 Data management (R. Schlitzer)
  • WP16 Training (P. Saugier)

18
National, EU and international cooperation
(letters of support)
epoca-project.eu
  • National projects BOOM, PeECE, PEACE...
  • EU projects
  • NoE MARBEF and EUR-OCEANS
  • IPs CARBOOCEAN and SESAME
  • Proposals submitted to the other ocean
    acidification item DYNAMO, HiSEAS, GLO-COAST,
    MEECE.
  • Proposals submitted to other items EuroSITES
  • ERC proposals CABICC, ECOTOC, MED-CORALS
  • International IGBP programs IMBER, LOICZ, SOLAS
  • US programs US Carbon Cycle Scientific Steering
    Group, Ocean Carbon and Biogeochemistry, NOAA
    Climate Program Office, NOAA Marine Fisheries
    Service, NSF Chemical Oceanography Division
  • International Scientific Advisory Panel K.
    Caldeira, V. Fabry, R. Feely, J. A. Kleypas and
    K. Lee

19
National, EU and international cooperation
epoca-project.eu
  • EPOCA is endorsed by LOICZ (Land-Ocean
    Interactions in the Coastal Zone)

20
Advertisements
epoca-project.eu
  • ESF Ocean Acidification Strategic Workshop, Las
    Palmas, 28-30 January 2009 (invitation only
    chair Jelle Bijma)
  • 2nd Meeting The Ocean in a High CO2 World,
    Monaco, 6-8 October (chair Jim Orr)
  • Next International ASLO meeting, Nice, 25-29
    January 2009
  • Biogeosciences special issue on the 3rd Bergen
    mesocosm experiment. Transparent and open review
    process check out www.biogeosciences.net
  • Another Biogeosciences special issue for
    contributions of the Monaco meeting
  • blog on ocean acidification oceanacidification.wo
    rdpress.com/

21
Budget
Total budget 15.9 M
22
Distribution of EU contribution
epoca-project.eu
23
US initiatives
OCB Ocean Acidification Workshop to promote
collaborative research, Scripps, 9-11 Oct
24
Overarching activities
epoca-project.eu
  • Data Management
  • Training and Education
  • Outreach and Dissemination of Knowledge

25
Data Management (WP 15)
epoca-project.eu
  • EPOCA Data Management Team Observation Data
    Manager and Model Data Manager
  • Collection, quality control, and publication of
    data
  • Protection of intellectual property rights (input
    from IPR panel)
  • Two major types of data
    (1) Direct measurements
    from Themes 1 and 2 (e.g. proxy data, water
    column data, data from mesocosms and laboratory
    experiments)
    (2) Model outputs from Themes 2 and 3 (e.g.,
    4-D velocity and tracer fields, material fluxes,
    various biogeochemical and ecological parameter
    estimates).
  • Data handled according to the EPOCA Data Policy
  • Data storage World Data Center for Marine
    Environmental Sciences (WDC-MARE)
  • EPOCA Data Portal (first version November 2008)
  • Meta-information available on the EPOCA web site
    www.epoca-project.eu

26
Training and Education (WP 16)
  • Training of young scientists high
    priority(through courses, workshops, secondments,
    school projects)
  • Training workshops on paleo-reconstruction
    methods, marine carbon biogeochemistry and
    perturbation experiments (open to non-EPOCA
    scientists whenever possible)
  • Pedagogical educational projects with a strong
    scientist-teacher-pupil interaction
  • Educational package for secondary school teachers
    (PSIEP, Carboschools)

epoca-project.eu
27
Outreach and Dissemination of Knowledge
epoca-project.eu
  • Presentation of project results (critical
    thresholds, risks and pathways to CO2 emission
    reduction) to business leaders, organisations and
    the general public
  • Scientific results communicated directly to
    expert groups, committes, policy-makers, media
    and via the Reference User Group (RUG) of
    targeted stake-holders (WWF, Rolls Royce,
    Greenpeace etc.)
  • RUG
    user
    related issues (type of data and products useful
    to managers, policy advisors and politicians,
    format and nature of key messages, dissemination
    procedures feedback key information
    into their own sector or parent organisation
  • EPOCA will produce a final synthesis report for
    policy-makers in a suitable language

28
Advisory Panels
epoca-project.eu
  • International Scientific Advisory Panel (ISAP)
  • Panel for Protection, Dissemination and
    Exploitation of Knowledge
  • Gender Panel

29
International Scientific Advisory Panel
epoca-project.eu
  • Right from the start, planning group decided to
    have an active connection with non-EU projects
    and scientists
  • K. Caldeira, V. Fabry, D. Feely, J. Kleypas and
    K. Lee
  • ISAP will inform the SSC and EB on initiatives
    outside the EU, funding opportunities and
  • advise on collaborations and joint research

30
Panel for Protection, Dissemination and
Exploitation of Knowledge
epoca-project.eu
  • Composition P. Burkill, C. Hauri (students
    representative) R. Schlitzer (chair) and M.
    Weinbauer.
  • EPOCA Data Policy.
  • Gives recommendations to the EB on data and
    information exchange (in a timely and efficient
    manner).
  • Oversees the data management and intervenes in
    case of conflict.


31
Gender Panel
epoca-project.eu
  • Composition D. Iglesias-Rodriguez (chair), K.
    Six and A. Merico
  • EPOCAs Gender Action Plan
  • make recommendations on relevant gender
  • issues related to recruitment of EPOCA
    staff
  • monitor how special needs for female
  • researchers are being taken into account in
    the
  • various training and research activities.

32
Management Structure
epoca-project.eu
  • Executive Board
  • Members General Assembly (MGA)
  • Scientific Steering Committee (SSC)

33
EPOCA Consortium Bodies
epoca-project.eu
34
Members General Assembly (MGA)
epoca-project.eu
  • Composition One representative from each partner
    institution
  • any major change in the scientific plans
  • any major budget reallocation between partners
  • any alteration of the Consortium Agreement
  • the acceptance of new Contractors as well as any
    exclusion of Contractors
  • any premature completion or termination of the
    project

35
Scientific Steering Committee (SSC)
epoca-project.eu
  • Composition Theme and WP leaders Christoph
    Heinze
  • acting on the initiative of the Executive Board
    (EB) on issues related to fulfilling the
    scientific objectives
  • assessing scientific progress against the
    objectives and, when necessary, making
    recommendations to the EB
  • approving all reports and implementation plans to
    the European Commission
  • providing advice on any call for and evaluation
    of new contractors, participants or partners that
    might be needed to finalize the projects
    objectives
  • linking with the International Scientific
    Advisory Panel

36
Executive Board (EB)
epoca-project.eu
  • Composition Theme leaders Coordinator
  • ensuring that adequate management is in place to
    monitor the science and perform quality control
    of deliverables
  • enforcing decisions of the MGA
  • ensuring the preparation of reports and work plan
  • informing the SSC about project progress, any
    problems and risks encountered and any change in
    strategy
  • ensuring that the Coordination executes the
    distribution of funds as required to reach the
    objectives of the project

37
Decision making structure
epoca-project.eu
38
Overall tasks of the Project Office
epoca-project.eu
  • ensure that the project runs in compliance with
    the requirements of the contract (administrative,
  • operational and scientific aspects)
  • it acts upon decisions taken by the EB, the SSC
    and the MGA

39
Project Office Service to the Consortium
epoca-project.eu
  • At LOV and OOV
  • F. Berthier, European projects engineer, CNRS
  • Lina Hansson, Project manager
  • Anne-Marin Nisumaa, Webmaster/Observational data
  • manager
  • Jean-Pierre Gattuso, Scientific coordinator
  • Admin support staff of LOV and OOV
  • At CNRS regional headquarters (M.-F.
    Grenier-Loustalot)
  • Hélène Faradji and Anne-Lise Garnier, Office of
    contracts
  • Sandra Pittavino, Finances
  • Laurence Schlosser, Human resources
  • John Pusceddu, Communication
  • At CNRS main headquarters
  • INSU (P. Monfray)
  • Press office
  • ...

40
Tasks of the Project Manager (Lina)
epoca-project.eu
  • assist the Coordinator by being the overall
    contact person towards
  • the Commission and the intermediary between the
    partners and the
  • Commission
  • prepare agendas, attend and act as secretary for
    all EB, SSC and
  • MGA meetings
  • communicate all decisions regarding the
    implementation of the
  • scientific work to the Theme and Work Package
    leaders
  • work in close collaboration with the Theme and
    Work package
  • leaders collecting all formal research and
    training plans and progress
  • reports for the presentation in the EB and SSC
  • assist in developing scientific reports and
    implementation plan to the
  • Commission
  • monitoring of partners adherence to the
    Consortium Agreement (CA)
  • coordinate and run the day-to-day administrative
    and financial tasks
  • control that financial contributions are
    transferred to contractors on
  • time
  • assist for project communication, meeting and
    workshops, as well as any action for training and
    dissemination purposes.

41
Tasks of the Communication Manager (Anne-Marin)
epoca-project.eu
  • design the EPOCA website (http//epoca-project.eu/
    ) and update it regularly
  • maintain on a daily basis the blog on ocean
    acidification (http//oceanacidification.wordpress
    .com/)
  • ensure frequent communication within the
    consortium through the web site as well as the
    already existing
  • Google discussion group that is restricted to
    EPOCA
  • partners
  • assist the leaders of WPs 14 (Dissemination,
    exploitation and management of knowledge C.
    Turley)
  • and 15 (Data management R. Schlitzer), and help
    for
  • dissemination, web-based data management and
  • training activities

42
Specific responsibilities
epoca-project.eu
  • Each partner
  • to perform and fulfill all of its obligations
    under the GA and the CA
  • to notify the Coordinator and the appropriate
    Work Package Leader(s) promptly of any
    significant information, fact, problem and delay
    likely to affect the success of the Project
  • to ensure the accuracy of any information or
    materials it supplies to the other Parties
  • to inform other Parties of relevant
    communications it receives from Third Parties in
    relation to the Project
  • to abide by the decisions of the MGA and the EB

43
Responsibilities
epoca-project.eu
  • WP Leaders
  • coordination and delivery of work within their WP
  • checking the quality of WP deliverables and
    reports
  • report to their respective theme leaders
  • Theme Leaders
  • coordination and delivery of work within their
    Theme ie coordinating all activities and WP
    within their Theme, checking the delivery and
    quality of deliverables, integrating all work
    within their Theme and ensuring communication
  • contribute to the planning, integration and
    fulfillment of their Theme research tasks into
    overarching and transversal WP so as to fulfill
    the overall EPOCA integrated scientific objectives

44
Key meetings
epoca-project.eu
  • Kick-off Meeting
  • General Assembly once a year
  • Scientific Steering Committee at least
    quarterly
  • Executive Board at least twice a year
Write a Comment