BROADWAY/CONGRESS CONVERSION - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

BROADWAY/CONGRESS CONVERSION

Description:

Broadway Blvd to 6 2 lanes. Projected Two-way Conversions. Selected Development ... One & Two-Way Operation on Broadway/Congress. Two-Way Operation on Stone and 6th ... – PowerPoint PPT presentation

Number of Views:85
Avg rating:3.0/5.0
Slides: 16
Provided by: eljo
Category:

less

Transcript and Presenter's Notes

Title: BROADWAY/CONGRESS CONVERSION


1
BROADWAY/CONGRESS CONVERSION
  • January 18, 2007

2
Planned Downtown AreaTransportation Projects
  • I-10 Widening
  • Streetcar
  • Fourth Avenue Underpass
  • Clark Street Bridge
  • Downtown Links
  • Speedway at RR Widening
  • 22nd Street to 6 lanes
  • Broadway Blvd to 6 2 lanes
  • Projected Two-way Conversions

3
Selected DevelopmentProjects in Downtown Area
  • Presidio Terrace 80,000 SF
  • City/County Courts 400,000 SF
  • MLK Block 100,000 SF
  • Santa Rita 220,000 SF
  • Post 80,000 SF
  • Plaza Centro 80,000 SF
  • Mercado District 400,000 SF

Total SF 5,256,109 Total Daily Vehicle Trips
52,000
4
Traffic Modeling Scenarios
  • One Two-Way Operation on Broadway/Congress
  • Two-Way Operation on Stone and 6th
  • 2006 2016 Traffic Volumes
  • 22nd Street Downtown Links Diversion
  • (40 EB / 60 WB)

5
Existing One-way Network
Stone Ave. 6th Ave. Alameda St. Pennington
St. Broadway Blvd. Congress St.
6
Recommendation
Convert to two-way where feasible
  • Stone Avenue
  • 6th Avenue
  • Alameda Street
  • Pennington Street

7
Basis for Recommendation
  • Traffic Operations
  • Safety
  • Roadway Configuration
  • Air Quality
  • Timing of Transportation Projects
  • Cost

8
Traffic Operations
  • Increases in Pedestrian Crossing Time
  • Event Access Issues
  • Increases in Delay and Congestion
  • Regional Trends Downtown

9
2006 Volumes with Diversion to Downtown Links and
22nd St
  • Avg. Vehicle Delay On Broadway/Congress
  • One-way 7 min
  • Two-way 11.5 min 64
  • EB Travel Time on Broadway/Congress
  • One-way 9 min
  • Two-way 13 min 44

10
2016 Volumes with Diversion to Downtown Links and
22nd St
  • Avg. Vehicle Delay On Broadway/Congress
  • One-way 22 min
  • Two-way 27.5 min 25
  • EB Travel Time on Broadway/Congress
  • One-way 18 min
  • Two-way 27 min 50

11
Safety
  • Vehicular conflicts
  • Pedestrian conflicts
  • Accident rates
  • Emergency Vehicle Access

12
Roadway Configuration
  • Angled on street parking
  • Parallel parking one-way vs. two-way
  • Sidewalks
  • Streetcar (will work either way)

13
Roadway Configuration for Two-Way
-10
-11
-6
-8
-3
-5
-8
-10
-4
-9
-21
-5
-10
-6
-2
Total Parking Loss 118
2-Way Congress 3 lanes 2-Way Broadway 4-5 lanes
14
Air Quality
  • Emissions Increase with 2 way on Broadway and
    Congress
  • Along Broadway/Congress
  • 28
  • Downtown
  • 14

15
Elements of Two-way Conversion
  • Traffic Signals and Lighting
  • Geometric Issues
  • Access
  • Cost
Write a Comment
User Comments (0)
About PowerShow.com