Title: Regional Plan Comparison: Southern Relief Route and Alternate Plan
1Regional Plan ComparisonSouthern Relief Route
and Alternate Plan
- Presentation to
- Transportation Policy Board
- El Paso MPO
- September 22, 2006
2Topics for Discussion
- Description of the Plans
- Plan Similarities
- Plan Differences
- Next Steps
- Discussion
3Background
- SRR is based on TxDOTs Regional Mobility Plan
- SRR Phase 1 documented and presented to TAC and
TPB (April-May 2006) - Alternate Plan based on official 2030 Gateway MTP
- Elements included in both plans
- Northeast Parkway (NEP)
- Border Highway East (BHE)
- Border Highway West (BHW)
- Upgrades to West Paisano
- Loop 375 widening (Cesar Chavez)
- Non-tolled improvements to I-10 (Mesa to
Executive Ctr.)
4Regional Plan Similarities
5Summary of Similarities
- NEP (Super-2) and BHE are the same
- SRR Phase I and Alternate Plan (1 thru 4 7)
both offer - Non-tolled improvements to I-10
- BHW downtown missing link
- Schuster connection and interchange
- Executive Ctr. interchange
- Paisano upgrade to limited access (freeway)
- Provide access to Schuster and Executive Ctr.
6Similarities SRR Phase 1 and Alternate Plan (1
thru 4 7)
7TxDOT SRR Phase 1
Mesa Dr. (SH 20)
Ramping Improvements (Non-Tolled)
Resler Dr. Direct Connects
Ramping Improvements (Non-Tolled)
C/D Road (Non-Tolled)
8TxDOT SRR Phase 1
Racetrack / Doniphan/NM 273 Interchange
C/D Road (Non-Tolled)
I-10
US 85
Ramping Improvements (Non-Tolled)
Sunland Park Dr,
I-10
Auxiliary Lane to Executive Ctr. (Non-Tolled)
Ramping Improvements (Non-Tolled)
9TxDOT SRR Phase 1
I-10
Auxiliary Lane to Executive Ctr. (Non-Tolled)
Executive Ctr.
Executive Ctr.
Non-Tolled Paisano Under Elevated Toll Lanes
US 85 (Paisano)
10TxDOT SRR Phase 1
ASARCO
Toll Lanes (Elevated)
Non-Tolled Paisano Under Toll Lanes
Restrictive ROW Area
Restrictive ROW Area
Toll Lanes (Elevated)
I-10
Rio Grande River
Non-Tolled Paisano Under Toll Lanes
11TxDOT SRR Phase 1
Schuster (Exist)
UTEP
Schuster Connect to I-10 SRR
I-10
Non-Tolled Paisano Under Elevated Toll Lanes
Toll Lanes (Elevated)
Paisano
SRR
Toll Lanes (Elevated)
12TxDOT SRR Phase 1
Non-Tolled LP 375 Under Elevated Toll Lanes
Toll Lanes (Elevated)
End Exist LP 375 (_at_ Santa Fe)
Paisano
LP 375
Begin Toll Lanes (Elevated)
Non-Tolled Section
Coles Interchange
13TxDOT SRR Phase 1
Non-Tolled Section
Begin Toll Lanes (Continues to Zaragoza)
US 54
LP 375
Non-Tolled Section
14Alternative Plan - Project 2
Project 2 Limit Doniphan/NM 273
Exec. Ctr. Interchange
1-Ln Frtg Rd (Both Sides of Fwy) (Length of
Project)
Schuster Connection
Source 2030 Gateway MTP, 2030 Network
Project 2 Limit BHW Connect (S. of Yandell)
15Right of Way Issues
ASARCO
Rio Grande River
American Canal
BNSF Railroad
EB Paisano
WB Paisano
16Funding Items
17Funding Items (contd)
- SRR Phase 1 proposal
- Includes 108 million of Texas Mobility Fund
(TMF) - Provides 180 million NEW revenue through tolls
- Does NOT affect Category 2 projects
- I-10_at_Horizon interchange
- Montana at Loop375 (Joe Battle) interchange
- Loop 375 realignment (Canutillo)
- Hawkins extension, I-10 to North Loop
- Buford-Horizon
- FM 3380 (Manny Aguilera) _at_ SH20
- Artcraft extension (Paseo del Norte)
- Alternate Plan
- Includes 108 million TMF
- Provides 14.9 million in toll revenue
- Reprioritization of Category 2 projects?
- Pass-through financing for BHE
- CBI funds
18Next Steps
- Alternate Plan likely will not fund all proposed
projects without new funding sources - SRR proposal recognizes need to prioritize
projects - Which project goes first?
- Establish criteria to determine regional
priorities - Transportation Policy Board to decide
19Proposed Criteria to Establish Priorities
- Individual projects measured vs. No-Build
- Criteria
- Reduce congestion
- Diversion from I-10 (ADTs)
- Vehicles
- Trucks
- LOS on facility and I-10
- Reduction in delay (travel time)
- Texas Congestion Index (regional impact)
- Total Cost (Life Cycle) (e.g. Construction,
Maintenance, and Operations) - Increased Reliability
20Analysis Scenarios
- No- Build scenario
- Based on MPOs 2030 Gateway MTP 2005 network
- Future demand (2030 demographic projections)
- Future scenarios
- NE Pkwy (tolled, Super-2)
- BHE (non-tolled)
- TxDOT SRR - Phase 1 (tolled)
- Alternate Plan Options (as requested by MPO
staff) - Alt Plan A 1 thru 4 7, non-tolled (as
discussed before) - Alt Plan B Same as A, eliminate frontage roads,
Schuster connection, Executive Center interchange - Alt Plan C Same as B, widen West Paisano to 6
lanes