July 4th Operation Fast Forward Safarian, Kaz, PM - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

July 4th Operation Fast Forward Safarian, Kaz, PM

Description:

Always a last minute decision by MPD. Requires coordination with VDOT and MPD ... means. Recording cameras. Manual counts. Travel time runs. VDOT Mobile Units ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 13
Provided by: rop86
Learn more at: https://www.mwcog.org
Category:

less

Transcript and Presenter's Notes

Title: July 4th Operation Fast Forward Safarian, Kaz, PM


1
July 4th Operation Fast
Forward Safarian, Kaz, PM
2
Background
  • Evacuation routes
  • Evacuation traffic signal timing

3
Purpose
  • Evacuation signal timing test, at the conclusion
    of the July 4th fireworks.
  • Test evacuation assumptions and strategies.
  • Coordination with other District agencies and its
    Regional partners conduct
  • Collect data during a Regional event that
    includes both heavy vehicular and pedestrian
    traffic.
  • Public safety will remain the priority for all
    public safety agencies.

4
District Agencies
  • DDOT
  • MPD
  • NPP
  • Fire
  • WMATA
  • HSEMA

5
Regional Partners
  • VDOT
  • Arlington county
  • Fairfax County
  • MDOT
  • Montgomery County
  • Prince Georges County

6
Operation Routes
  • Route 1 Georgia Ave (from 7th and F St NW to
    Beltway)
  • Route 2 Pennsylvania Ave eastbound
  • Route 3 Connecticut Ave to Beltway
  • Route 4 14th street south bound
  • Route 5 K Street westbound/Whitehurst
    freeway/Canal road

7
Operation Routes
8
Operation Parameters
  • Traffic Signal Timing
  • Traffic Management Center
  • Dynamic Message Signs
  • Traffic Control Officers
  • Traffic Signal Technicians
  • MPD Officers
  • Roadway Operation Patrols
  • Cone Crews
  • Data Collection Crews
  • System Inspection oversight Division
  • DDOT ELOs
  • 800MHz Radios

9
Operation Timing and Duration
  • The operation starts right after the conclusion
    of the fire works.
  • It lasts for 2 hours

10
Operation Procedures
  • 240s CL for all 5 selected routes in coordination
    with VA and MD.
  • 7th ST/Georgia Ave.(Simulation Route)
  • EB, WB and SB moving restrictions at the 6
    critical intersections
  • All motorists are directed to turn to northbound
    direction
  • 14th ST Bridge.
  • HOV lane reversal
  • Always a last minute decision by MPD
  • Requires coordination with VDOT and MPD
  • DDOT 800MHz radios used for communications with
    VDOT

11
Critical Intersections Traffic control
VMS 1 EVAC/IN/PROGRESS / LEFT/TURN/ONLY VMS
2 EVAC/IN/PROGRESS / RIGHT/TURN/ONLY
12
Data Collection
  • Both vehicular and pedestrian
  • Traffic simulation area
  • Data collection means
  • Recording cameras
  • Manual counts
  • Travel time runs
  • VDOT Mobile Units