53:071 Hydraulics and Hydrology Project - PowerPoint PPT Presentation

About This Presentation
Title:

53:071 Hydraulics and Hydrology Project

Description:

Allen Bradley, Loren Wehmeyer, Li-Chuan Chen, and Marian Muste. Problem Statement. A children's museum in Colorado has purchased a small Pelton turbine for its new ... – PowerPoint PPT presentation

Number of Views:200
Avg rating:3.0/5.0
Slides: 18
Provided by: lich152
Category:

less

Transcript and Presenter's Notes

Title: 53:071 Hydraulics and Hydrology Project


1
53071 Hydraulics and HydrologyProject
1Pelton Turbine
  • Allen Bradley, Loren Wehmeyer, Li-Chuan Chen, and
    Marian Muste

2
Problem Statement
  • A childrens museum in Colorado has purchased a
    small Pelton turbine for its new display on
    renewable energy.

3
Problem Statement
  • The museum wishes to operate the turbine (with
    available flows) and sell the power on the open
    market.
  • You have been hired as a consultant to the museum.

4
Project Objective
  • Your job is to determine energy (kWh) that can be
    generated from the laboratory-scale Pelton
    turbine, and the revenue it can generate (/year)
    for the museum.

5
Site Information
  • The effective head for operations at the site is
    about 120 ft
  • Variations in the forebay elevation are assumed
    to be minor

6
Operational Information
  • The museum will operate the turbine 7 days a week
    (9 am to 4 pm).
  • The museum has secured water rights to divert
    flows from the South Platte River. The allotted
    diversion depends on the average monthly flow
    rate in the river.

7
Laboratory Component
  • Determine the energy conversion efficiency of the
    laboratory-scale Pelton turbine for the proposed
    operating conditions (Havailable, Q)

8
Engineering Analysis Components
  • Compute the energy produced (kWh/yr) if operated
    as planned.
  • Estimate the revenue that can be generated if the
    energy is sold on the open market (/year).
  • Prepare a one-page flyer on the exhibit (for
    distribution to museum visitors).

9
Principle
10
Principle
11
Laboratory Objective
  • To determine energy conversion efficiency (h) for
    the laboratory-scale Pelton turbine for three
    operational discharges (Q)

12
Laboratory Apparatus
13
Laboratory Procedures
  • TA sets the discharge and initial measuring speed
    with the brake off
  • Tighten the friction hand-wheel and record the
    torque and rotational speed
  • Repeat Step 2 with ?N 50-100 rpm until the
    rotational speed reaches about 500 rpm
  • Measure the head on the weir (H1) and record the
    reference point (H0)
  • TA adjusts to a lower discharge and initial
    rotational speed
  • Repeat Steps 1 to 5

14
Data Sheet
15
Laboratory Analysis
  • Determine the discharge using Q2.49(H1-H0)2.48.
  • Determine the efficiency of the turbine.
  • Plot the rotational speed vs. the efficiency of
    the turbine.
  • Show results for the three different discharges.

16
Sample Result
17
Project Report
  • Provide the client (the museum director) with a
    concise report that answers the project objectives
Write a Comment
User Comments (0)
About PowerShow.com