CIVL 202 Construction Engineering I

1 / 11
About This Presentation
Title:

CIVL 202 Construction Engineering I

Description:

CIVL 202 Construction Engineering I Tutorial 1 T1 Mon 11:00-11:50 T2 Wed 09:00-09:50 Construction vs Manufacturing Process Construction and Manufacturing Process ... – PowerPoint PPT presentation

Number of Views:8
Avg rating:3.0/5.0
Slides: 12
Provided by: agne4

less

Transcript and Presenter's Notes

Title: CIVL 202 Construction Engineering I


1
CIVL 202Construction Engineering I
  • Tutorial 1
  • T1 Mon 1100-1150
  • T2 Wed 0900-0950

2
Construction vs Manufacturing Process
Construction Process Manufacturing Process
Nature Service-oriented Product-based
Quantity of Production Single and unique product Mass/batches of units
Target Purchaser Clients who need a facility Without designated purchaser
Focus Planning and controlling resources within the timeframe of project Applying resources over the life of extended production run of many unit
3
Construction and Manufacturing Process
  • Manufacturing Process
  • Construction Process

Design and Fabricate units
Units in inventory
Distribute units for sale
Preliminary Design
Final Design
Construction
4
Sequence of Project Development
  • Three parties
  • Owner who needs for a facility
  • Designer who designs the facility on the basis
    of owners need
  • Constructor Contractor, who constructs the
    facility on the basis of the design

5
Sequence of Project Development
  • Owner shows a need for the facility
  • Designer carries out feasibility studies and cost
    estimations
  • Obtain a conceptual design and approximate cost
    estimate
  • Proceed with detailed design
  • Advertising project
  • Acceptance of proposal and construction commenced
  • Project testing and maintenance of the facility

6
Construction Technology and Management
  • Technology
  • techniques used to place physical materials and
    elements of construction
  • Management
  • 4M resources manpower, machines, materials and
    money
  • Construction manager should consider optimum
    application of 4M resources, should also consider
    quality, time and money constraints

7
Structure of Construction Industry
  • Building
  • Habitational, institutional, educational,
    commercial, social, recreational, office
    building, shopping centers, sports complexes
  • Engineered
  • Highways Project and Heavy Project
  • Industrial
  • Highly technical projects in product
    manufacturing and processing

8
Management
  • Hierarchical

Organizational
Project
Activity
Operations
Process
Work task
9
Preparing the bid package
  • Establishing Need
  • Establishment of a need of certain facility for
    users
  • Social needs? Economic needs?
  • Need Evaluation
  • Cost/benefit analysis
  • Graphical representation of the project and a
    layout diagram
  • Cost estimate based on the conceptual-level
    information available

10
Conceptual Drawings and Estimates
  • Cost/benefit analysis, layout drawings, 3D models
  • Cost estimate conceptual drawing
  • Estimate based on specific cost indexes

11
Design of a facility
  • Preliminary design
  • General layout, floor plan, building cladding,
    finishing, heating system, foundation support,
    structural frame
  • Detailed design
  • Gives a detailed design to ensure the design is
    within owners financial resources and to
    evaluate bids