MODULAR BUILDINGS RESIDENTIAL - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

MODULAR BUILDINGS RESIDENTIAL

Description:

MOST COMPLAINTS INVOLVE MOBILE HOME DEALERS & THEIR CREW'S INSTALLATION. ... INSTALLED ELECTRICAL EQUIPMENT MUST BE REFLECTED IN PLANS & MUST HAVE SPECS (ICE VENDING) ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 24
Provided by: dcaSt7
Category:

less

Transcript and Presenter's Notes

Title: MODULAR BUILDINGS RESIDENTIAL


1
MODULAR BUILDINGS RESIDENTIAL COMMERCIAL
2
MICHAEL ASHWORTH
  • DCA CODES STANDARDS
  • PHONE 850-922-6075
  • FAX 850-414-8436
  • michael.ashworth_at_dca.state.fl.us

3
STATUTE RULE (Pg. 1)
  • CH 553, PART I, FS-AUTHORIZES MBP
  • RULE 9B-1 FACSPECIFICS OF MBP
  • CH 553.73(8)(d) (e) FS EXEMPTS CONSTRUCTION
    TRAILERS TEMPORARY OFFICES FROM FBC, EXCEPT ADA
    FOR TEMP OFFICES.

4
STATUTE RULE (Pg. 2)
  • CH 553.80(1)(D) FS EXEMPTED SHEDS FROM PA
    LICENSED INSTALLATION (lt400 sf).
  • CH 553.80 (1)(d) FS EXEMPTS MODULAR BUILDINGS
    FROM LOCAL PLAN REVIEWS, BUT ARE SUBJECT TO LOCAL
    PERMITTING INSPECTION FOR ALL SITE RELATED
    ACTIVITIES.

5
STATUTE RULE (Pg. 3)
  • Ch 1013 FS PORTABLES CLASSROOMS (SEPARATE
    COURSE).
  • PLANSPOSTED ON BCIS UPDATED TO INCLUDE LATEST
    CODE REVISION (9B-1.009(5) FAC).

6
RESIDENTIAL (Pg. 1)
  • BUILT TO THE FBC (vs HUD).
  • INSTALLED BY A FL LICENSED CONTRACTOR (GC/BC/RC).
  • INSTALLED ON A PERMANENT FOUNDATION (CH 428.4
    FBC).
  • CONSIDERED REAL PROPERTY.

7
RESIDENTIAL (Pg. 2)
  • MORE HURRICANE RESISTANT CHEAPER INSURANCE
    RATES.
  • NOT RESTRICTED IN RESIDENTIAL ZONES.
  • LOOKS LIKE SITE BUILT HOME.

8
RESIDENTIAL (Pg. 3)
  • MOST COMPLAINTS INVOLVE MOBILE HOME DEALERS
    THEIR CREWS INSTALLATION.
  • BUILDING PERMITS-CAUTION HOMEOWNER!
  • MOBILE HOME CREWS CANNOT INSTALL A MODULAR HOME.
  • ALL SITE WORK MUST BE PERMITTED INSPECTED BY
    LOCAL B.O. (INCLUDES INSTALLATION WARRANTY
    WORK.

9
RESIDENTIAL (Pg. 4)
  • COPY OF MFGR APPROVAL LETTER SUBMITTED W/
    BUILDING PERMIT APPLICATION
  • CAN BE INSTALLED IN FLOOD ZONES ABOVE BFE (OFF
    GRADE/ON PILINGS).

10
RESIDENTIAL (Pg. 5)
  • ANY ONSITE INSTALLATION (END GABLE SIDING, HINGED
    ROOFS, PLUMBING, ELEC, FOUNDATION, etc) ARE
    SUBJECT TO LOCAL PERMITTING INSPECTIONS,
    INCLUDING LOCAL AMENDMENTS TO THE FBC.

11
RESIDENTIAL (Pg. 6)
  • 30 COMPLAINTS ARE MFGR RELATED
  • ELECTRICAL--INCORRECT WIRING
  • PLUMBING--NO ANTI-SCALD VALVES
  • HVACOVERSIZED POOR DEHUMIDIFICATION.
  • NOT FOLLOWING MFGR INSTALLATION INSTRUCTIONS
    (MARRIAGE WALLS, WINDOWS, DOORS, etc.,)

12
RESIDENTIAL (Pg. 7)
  • 70 OF COMPLAINTS ARE DEALER RELATED
  • 1 COMPLAINT MOBILE HOME CREWS INSTALLING
    MODULARS ON HUD TYPE FOUNDATIONS
  • 2 COMPLAINT OFFERING TO GET HOMEOWNER TO PULL
    THE PERMIT
  • NOT USING PROPER EQUIPMENT TO INSTALL MODULAR
    UNITS (BULLDOZERS VS CRANES)

13
RESIDENTIAL (Pg. 8)
  • MARRIAGE WALLS NOT JOINED CORRECTLY
  • FLOORS SAGGING ROOF LEAKING
  • SIDING NOT ALLIGNED
  • WINDOWS DOORS LEAK
  • FOUNDATION SETTLING.

14
QUESTION ANSWER
  • ???

15
COMMERCIAL BLDGS. (Pg. 1)
  • NO PROBLEMS W/ COMMERCIAL OTHER THAN TEMP OFFICES
    CONST. TRAILERS.
  • INSTALLED ELECTRICAL EQUIPMENT MUST BE REFLECTED
    IN PLANS MUST HAVE SPECS (ICE VENDING).
  • COPY OF MFGR APPROVAL LETTER INCLUDED W/ BUILDING
    PERMIT APPLICATION.

16
COMMERICAL BLDGS (Pg. 2)
  • STORAGE SHEDS ARE NO LONGER CLASSIFIED AS
    RESIDENTIAL CAN BE USED IN COMMERCIAL
    APPLICATION.
  • CHANGE IN OCCUPANCY COMPLIANCE W/ CURRENT FBC!

17
COMMERICAL BLDGS (Pg. 3)
  • RECERTIFICATIONS IF THE LOCAL DEFERS TO DCA,
    THEN THE MFGRS 3RD PARTY AGENCY MUST PERFORM
    INSPECTION.
  • AS BUILT PLANS ACCEPTABLE FOR RECERTIFICATION.
  • PLANS SEALED, STAMPED POSTED.

18
QUESTION ANSWER
  • ???

19
STORAGE SHEDS (Pg. 1)
  • SB 442/ch 553.80(1)(d) FS-EXEMPTS SHEDS FROM
    PRODUCT APPROVAL STILL COMPLY W/ FBC.
  • lt400 sf NO LICENSE TO INSTALL
  • lt720 sf EXEMPT FROM WBD

20
STORAGE SHEDS (Pg. 2)
  • PLANSQUALITY POSTED ON BCIS UPDATETO INCLUDE
    LATEST CODE CHANGE RAISED SEAL PLANS ON FILE
    AT 3RD PARTY AGENCY.
  • GFCI REQUIRED FOR SHEDS W/ FACTORY WIRED OUTLETS.

21
STORAGE SHEDS (Pg. 3)
  • COMPLY W/ LOCAL WIND DESIGN.
  • DESIGN S OCCUPANCY OCCUPIABLE NOT
    INHABITABLE.
  • PERMITS REQUIRED (WHERE APPLICABLE).

22
STORAGE SHEDS (Pg. 4)
  • UNAPPROVED MFGRS/NO INSIGNIAS
  • KITS
  • CLOSED CONSTRUCTION
  • OPEN CONSTRUCTION
  • PLASTIC SNAP-TOGETHER KITS