Methodology - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Methodology

Description:

... bridge, overpass and tunnel repair and earthquake retrofitting ... Earthquake retrofitting bridges, tunnels and overpasses. Transportation Related Facts ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 9
Provided by: Liz299
Category:

less

Transcript and Presenter's Notes

Title: Methodology


1
(No Transcript)
2
Methodology
  • Survey conducted November 13th 20th, 2007
  • Interviews with 1,200 random Los Angeles County
    voters, likely to vote in November 08.
  • Margin of error for the full sample is /-2.8
  • Margin of error for half the sample is /-4.0
  • Margin of error for each Planning Area is /-6.9

3
Key Findings
  • LA County transportation measure support rises to
    the necessary two-thirds level after supportive
    statements
  • Communicating about specific projects by unique
    Transportation Planning Areas personalizes the
    importance of the measure for voters and
    strengthens support
  • Synchronzing traffic signals, extending light
    rail transit and bridge and pot hole repair are
    among the projects receiving the highest level of
    support

4
Continued
  • Voters understand the problem and respond
    supportively to such solution oriented messages
    relating to
  • The aging and outdated highway system, including
    the needed bridge, overpass and tunnel repair and
    earthquake retrofitting
  • The worsening of traffic that has led to an
    increase in hours spent in rush hour
  • The need to reduce emergency response times,
    which have been seriously impacted by worsening
    traffic congestion
  • The need to address the expected population
    growth over the next 25 years

5
Effectiveness of Project in Relieving Traffic in
Los Angeles County
(Ranked by Mean Score)
Mean Score
6. I am now going to read you a list of ways
money from the transportation ballot measure
could be used. Regardless of your opinion of the
measure, please tell me how effective you believe
that item will be in helping to relieve traffic
in Los Angeles County. We will use a scale of
one to seven, where one means carrying out that
project would NOT BE AT ALL EFFECTIVE in helping
relieve traffic in LA County and seven means it
would be VERY EFFECTIVE in helping relieve
traffic in LA County. If you have no opinion or
don't know enough about the item I mention, you
can tell me that too. Split Sample. Planning
Areas 1-WLA 2-Southbay 3-Central LA
4-San Gabriel 5-San Fernando Valley
gt6-Southeast.
6
Continued
Mean Score
Earthquake retrofitting bridges, tunnels and
overpasses
6. I am now going to read you a list of ways
money from the transportation ballot measure
could be used. Regardless of your opinion of the
measure, please tell me how effective you believe
that item will be in helping to relieve traffic
in Los Angeles County. We will use a scale of
one to seven, where one means carrying out that
project would NOT BE AT ALL EFFECTIVE in helping
relieve traffic in LA County and seven means it
would be VERY EFFECTIVE in helping relieve
traffic in LA County. If you have no opinion or
don't know enough about the item I mention, you
can tell me that too. Split Sample. Planning
Areas 1-WLA 2-Southbay 3-Central LA
4-San Gabriel 5-San Fernando Valley
gt6-Southeast.
7
Transportation Related Facts
7. I am going to mention to you some Los Angeles
County transportation-related facts. Please tell
me if you find it a very convincing, somewhat
convincing, not too convincing or not at all
convincing reason to vote for the Traffic Relief,
Rail expansion and Transportation safety MEASURE
that I asked you about earlier. If you do not
believe the fact, or if it has no effect on your
thinking, one way or the other, please tell me
that too. Split Sample.
8
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com