AADC Capability Prototype - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

AADC Capability Prototype

Description:

Reassessment of Detailed Design in Response to Early Testing ... Showcases AADC Capability onboard USS SHILOH. SHILOH Is Both Battle Group AW and Theater AADC ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 9
Provided by: techm8
Category:

less

Transcript and Presenter's Notes

Title: AADC Capability Prototype


1
AADC Capability Prototype
Tactical Operations
Force Planning
  • Prototype Installed at JHU/APL, USS SHILOH (CG
    67) USS MOUNT WHITNEY (LCC 20)
  • AADC Capability Interfaces to Host Combat System
    (AEGIS CG, Command Ship, Shore Site, Etc.)
  • Initial Fleet Feedback Has Been Very Positive

2
Cruiser Conversions 4 Pillars
CRUISER CONVERSION ENSURES THE QDR-APPROVED 116
CRU-DES SHIPS WITH THE REQUIRED MIX OF SURFACE
COMBATANT CAPABILITIES
3
Program Status
  • Prototype
  • SHILOH / MT WHITNEY / JHU-APL Continue to Provide
    Operational Assessment and Proof of Concept in an
    Exercise Environment
  • Phase II - EMD
  • Key Dates
  • RFP/SOW Released 17 Dec 99
  • On Site S/W Development 29 Feb 00 - 16 Mar 00
  • Capability Assessments
  • Milestone I/II 27 Mar 00
  • Contract Award July 00

4
Phase II RFP Objectives
  • Design, Develop, Integrate, Test, and Deliver a
    Production Representative Engineering Development
    Model (EDM) to Meet the Requirements of
    System/Subsystem Specification (SSS)
  • Use an Incremental Software Development Approach
    to Permit
  • Early Initiation of Development
  • Incremental Testing of Development Builds
  • Reassessment of Detailed Design in Response to
    Early Testing and On-going Trade-space Analysis
    Results
  • Ensure DII COE Level 6 Compliance as Defined in
    DII COE Integration and Runtime Specifications
    while Minimizing TOC
  • Deliver EDM Not Later Than 30 Sept 2003
  • Optimize Use of New and Emerging Technologies to
    Manage Cost, Schedule, and Performance Risks

5
Phase II RFP Objectives (continued)
  • Minimize Program TOC While Providing Required
    Performance and Functionality Within Schedule
    Constraints
  • Optimize Reuse of Existing Data, Software Mission
    Segments, Application Software, and Advanced
    Computing Technologies in System Design to Reduce
    Development Costs While Meeting or Exceeding SSS
    Requirements
  • Develop and Implement Life Cycle Support
    Strategy, Including All Logistics Support
    Elements Required to Support Future Fleet
    Operations While Meeting TOC Goals
  • Conduct Developmental and Support Operational
    Tests of EDM to Demonstrate DII COE
    Certification, Joint Interoperability
    Certification, and Compliance with the SSS
  • Produce 1 or 2 LRIP Systems if LRIP Option is
    Exercised

6
Exercises - Objectives
  • Incorporate Results of Fleet Exercises to Shape
    Development of Tactics, Techniques, and
    Procedures (TTP) and Production Unit Procurement
    to Meet the Needs of the Warfighter
  • Refine Collaborative Planning in the Joint
    Environment
  • Refine, Test and Evaluation Procedures/Concepts
  • Exercise TE Team/Incorporate Into APL Prototype
    Operations
  • Establish Lessons Learned Data Base
  • RIMPAC 00
  • Showcases AADC Capability onboard USS SHILOH
  • SHILOH Is Both Battle Group AW and Theater AADC
  • First Opportunity to Fly AADC With Staff to CG
    Underway
  • DT Assist by COMOPTEVFOR

7
Exercises
Exercise
Dates
Platform
Results / Results Desired
Determined manning levels. Proved Cruiser
Concept. Notional CG manned by CCDG-2
TMDI 98
Feb 99
JHU/APL Prototype
Jun to Sep 99
NIMBLE SHIELD 99
JHU/APL Prototype
J8 sponsored exercise
Continued manning refinement. Was planning
exercise only. Based ashore with reachback
to ship. First collaborative planning from sea.
MOUNT WHITNEY (LCC 20)
Jul 99
MATADOR 99
Incorporated AADC at sea into C2F JTFEX for first
time
MOUNT WHITNEY (LCC 20)
Dec 99
JTFEX 00-1
C6F CP400 Counter Proliferation Exercise
- Libya/Israel Scenario
Apr 00
FBE G
JHU/APL Prototype
MOUNT WHITNEY (LCC 20)
Continue capability validation in a Joint
environment
May 00
JTFEX 00-2
MOUNT WHITNEY (LCC 20)
FBE H
Sep 00
USACOM sponsored. Coincident with JTFEX 00.
Continue capability validation in a Joint
environment
MOUNT WHITNEY (LCC 20) or SHILOH (CG 67)
Oct 00
JTFEX 01-1
8
AADC Capability Acquisition Schedule
Draft 11 May 00 Draft
99
03
04
05
06
07
08
09
FY
00
01
02
EVENT
3
Milestones System Engineering
Development Testing DT/OT Installation
AWS BL 6P3C AADC (6 total units) Deliveries
(Qty)
I/II
Phase I BAA
Phase III Production
Phase II EMD
Award
4
10
7
Phase IV Life Cycle Support
12
RFP Issued
8
8
2
EDM Testing
Proposals Due
DT-IIC
DT-IIB / OA
DT-IIA
DT-I
8
8
7
6
12
OT-IIA
DT-IID
12
10
RIMPAC 00
JTFEX 00-1
CG
EDM at Contractor Facility
USS SHILOH
USS Mt Whitney
(1)
First LRIP Delivery
PMS 467
DATE
PMS 400C
DATE
Write a Comment
User Comments (0)
About PowerShow.com