Title: New 400 kV interconnection line. Bulgaria Macedonia Fyro


1
  • New 400 kV interconnection line
  • Bulgaria Macedonia (Fyrom)

2
(No Transcript)
3
  • General parameters of 400 kV OHL SS Dubrovo SS
    Chervena Mogila
  • Total length 190.809 km
  • Resistance, positive sequence, R1 6.15 O
  • Reactance, positive sequence, X1 63.714 O
  • Resistance, zero sequence, R0 45.556 O
  • Reactance, zero sequence, X0 154.711 O

4
(No Transcript)
5
  • For 2008/2009 the winter maximum load regime
  • the calculated values of NTC between
  • Bulgaria and Macedonia are
  • From Bulgaria to Macedonia 500 MW
  • and
  • From Macedonia to Bulgaria 230 MW

6