MSE608C - PowerPoint PPT Presentation

About This Presentation
Title:

MSE608C

Description:

... sales commission Committed and Deterministic Fixed Costs Discretionary Can be changed for short periods Advertising Training R&D Deterministic ... – PowerPoint PPT presentation

Number of Views:0
Avg rating:3.0/5.0
Slides: 6
Provided by: California83
Learn more at: http://www.csun.edu
Category:

less

Transcript and Presenter's Notes

Title: MSE608C


1
MSE608C Engineering and Financial Cost Analysis
  • Controlling Expenses

2
Mixed Expenses
  • Fixed Expenses
  • Little correlation with changing levels of
    business activity.
  • Examples would include building space managers
    and technical staff utilities depreciation and
    amortization
  • Semi-variable Expenses
  • Some correlation with incremental changes in
    business activity
  • Examples would include Supplies office space
  • Variable Expenses
  • Direct correlation with each unit of business
    activity
  • Examples would include direct materials direct
    labor sales commission

3
Committed and Deterministic Fixed Costs
  • Discretionary
  • Can be changed for short periods
  • Advertising
  • Training
  • RD
  • Deterministic (Committed)
  • Cannot be reduced
  • Rent
  • Salaries of key employees

4
Which Variances to Address?
  • Materiality
  • The magnitude and importance of the variance
  • Consistency of Occurrence
  • The magnitude and consistency of a variance over
    several periods.
  • Ability to control
  • Is the variance within the control of management
  • Deterministic expenses are ones that management
    has little control over in the short term.
  • Discretionary expenses are ones that are flexible
    in the short term.
  • Nature of the item.
  • The importance of the variance to the organization

5
Assessment
  • What type of Expenses directly correlate with
    changes in business activity?
  • Which type of Expenses can be changed in the
    near-term?
Write a Comment
User Comments (0)
About PowerShow.com