Title: UK COAL
1UK COAL Prince of Wales Colliery
Design Workshop Feedback Session Tuesday 19th
February, 6pmPontefract Town Hall
2Vision Statement
To promote the early delivery of the Park Road
Prince of Wales site as the premier landmark,
urban extension site within the Five Towns
Regeneration Area, with high quality, mixed-use
development set within an attractive, landscaped
environment.
3Five Towns
4Aerial Photograph
5Wider Context
6Masterplan
7- Purpose of today
- To feedback and update on the developments that
have taken place since the last design workshop - Questions and comments raised from the previous
design workshop - Comments raised on the interactive walk with
local residents - Proposed Northern Road design options
- Phasing drawings for the construction of the
scheme - Concept masterplan including public open space
8Summary of comments made at the last meeting
9- Street Furniture
- Vandal proof street furniture
- Picnic area
- Community seating areas
- Water feature similar to Edinburgh Museum
see Joe Swift (BBC Gardener) - Public Art this would work particularly well
at the main entrance to the site near to the
railway lines - Postboxes to be included in the plan
- Design code should include high quality street
furniture/railings no galvanized steel benches. - Public Transport
- Bus stop scheme for children aged 10-16 years as
set up in Sheffield and Barnsley Hopper-bus
connections to town - Heritage
- Memorials
10- Services and Amenities
- Fire station
- Police station
- Youth clubs
- Venue for Scouts, Brownies, Guides etc
- Community centre
- Hairdressers
- Newsagents
- Materials
- No galvanized steel benches
- Tarmac is unattractive and should not be used
- Housing
- Housing should incorporate affordable housing,
housing for elderly people, sheltered housing - Will there be an area dedicated to elderly
people? - Regarding details of new courtyards allocated
to households or individuals will they be
gated?
11- Commercial/Employment
- Consider individual lets for small businesses
- Some of the small office areas could be rented
out to people who want an in-between work and
home office? - Public Squares
- Play spaces should be within these spaces
- Play Spaces
- Sanded areas
- Skate Park
- BMX track
- Play area should be in main squares
12- Sports and Recreation
- Nature trail
- Create a new football stadium within the
development site so that all of the community can
benefit - Signage and Lighting
- All areas should be well lit
- Street furniture should be replicated throughout
the scheme to ensure continuity. - Instead of street lighting, could lighting be
placed in shrubbery/ upon buildings etc nicer
appearance - Safety and security
- CCTV and security are issues
- Will the site be policed?
13Interactive walkabout with local residents
- Main Concerns with the proposed Northern Road
- Traffic from the proposed Northern Road may use
Ladybalk Lane and Monkhill Avenue as short cuts
or rat runs - The safety of pedestrians when crossing Ladybalk
Lane close to junction with Skinner Lane - if
there is additional traffic. - The close proximity of the proposed roundabout
between Northern Road and Skinner Lane to the
level crossing. - When the barriers are down at the level
crossing, traffic will cut through the
Monkhill/Ladybalk Estate to avoid queuing - Traffic calming may reduce traffic speeds, but
it may not stop traffic using the roads in the
Monkhill/Ladybalk Estate. - The impact of the additional traffic on the
bungalows on Ladybalk Lane. - Ladybalk Lane is already busy without the
additional traffic that the proposed Northern
Road will create - Monkhill Avenue and Monkhill Drive do not have
the ability to accommodate an increase in traffic
flows.
14Proposed Northern Road Option 1
15Proposed Northern Road Option 2
16Proposed Northern Road Option 3
17Phasing drawings 1 22 weeks
18Phasing drawings 0 6 months
19Phasing drawings 7 18 months
20Phasing drawings 19 24 months
21Phasing drawings 25 30 months
22Phasing drawings 31 36 months
23Phasing drawings 37 42 months
24Phasing drawings 43 54 months
25Phasing drawings 55 66 months
26Phasing drawings 67 78 months
27Phasing drawings 79 90 months
28Phasing drawings 91 102 months
29Phasing drawings 103 114 months
30Concept Masterplan