Title: 5S Kiazen in Lami 2


1
5S Kiazen in Lami 2
  • 02/10/05

2
Team members
  • Nicole Martinez co leader - Sales
  • Joanne Genovese co leader - Laminating
  • Lisa Welsh Purchasing
  • Donna Funk QA
  • Larry Nagy Bending
  • JR Slifer Cutting
  • Fred Carlson Shipping
  • Leanna Stafford - Laminating

3
Project Scope
  • Staging area for Lami 2
  • Washer area feeding Lami 2 assembly
  • Lami 2 assembly area
  • Soldering station
  • Storage cabinet
  • Spallshield cutting area

4
Project Goals
  • Reduce change over by 30
  • Increase productivity 25
  • Improve 5S audit score by 10
  • Introduce at least 1 safety improvement

5
Current conditions
  • Made arrow diagram of current layout
  • Observed processing of 80157
  • Observed change over of 80497 to flat armor

6
Improvements
  • Organized tools, logo screens and templates used
    at washer station outside Lami room
  • Established red tag area
  • Updated work instructions
  • Created visual training aids
  • Organized supply cabinet
  • Increased 5S audit score
  • Redesigned assembly layout and method
  • Created new template design

7
Before L2 washer table
After L2 washer table
8
Newly created red tag area
9
Before, Lami 2 assembly area
After, Lami 2 assembly area
10
Before, supply cabinet
After, supply cabinet
11
After, Lami 2 soldering area
Before, Lami 2 soldering area
i
12
Results
  • Reduced change over from 28 min to 15 min
  • Improved productivity 3.4 pcs per hr to 5.5
  • 5S audit score increased from 41 to 72 out of 80
  • Safety improvements
  • Reminder signs to put protective tape on fingers
  • Taped floor in front of electrical panel
    maintaining 36

13
Goals Results
  • 46
  • 62
  • 75
  • Change over 30
  • Productivity 25
  • 5S Audit 10

14
Remaining task list
  • Construct supply cabinet rack (JR due 3/10/05)
  • Move curtain inside L2 (Joanne 2/18/05)
  • Organize templates (Lisa 3/10/05)
  • Limit amount of sticker on flat armor (Larry
    3/10/05)
  • Paint lines on floor (Fred 3/10/05)
  • Complete sanding work area (Joanne 3/10/05)
  • Complete rework area (Leanna 2/17/05)