Title: Revitalizing Downtown Bryan
1Revitalizing Downtown Bryan
2The Downtown Master Plan was a collaboration
between the public, City staff, and consultants
Looney-Ricks-Kiss Inc.
- The Plan includes the following components
-
- Existing Condition Analysis Public Input
- Physical Master Plan Streetscape Design
- Utilities and Infrastructure Urban Design
- Economic Market Strategies Façade Restorations
- Market Parking Survey Results
- The Plan was instrumental in engaging the
stakeholders and creating a shared vision for the
future of Downtown Bryan.
3Context Sensitive Design Historical Districts,
Mixed-Use Environment, Public Spaces, Walk-able
Neighborhoods, New Urbanism, Place-making, Town
Hall Designs, Transit Oriented Developments
4Infrastructure Improvements
- The DTMP created streetscape plans and identified
phasing of the infrastructure improvements. - The design elements incorporated within the plan
allows for quick design because the streetscaping
elements have already been selected. Each phase
has taken approximately 6 months for complete
survey and design work. - The infrastructure improvements include a
complete reconstruction of water, sewer, storm
sewer, electrical and private utility
infrastructure in addition to the above-ground
streetscaping.
5Capital Improvement Expenditures
Phase 1 (Carnegie Alley, Main Street between 28th
and 24th Streets) 3.6 million Phase 2 (Bryan
Avenue between 28th and 24th Streets) 7.5
million Phase 3 (Main Street between 24th and
MLK Jr. Drive) 8 million budgeted Phase 4
slated for the 2013 Capital Improvement Plan
(Bryan Avenue between 24th and MLK Jr. Drive)
5.7 million budgeted Tabor Avenue parking lots
slated for 2014 CIP 1.5 million budgeted
6Streetscaping Improvements
- Trees
- Lights
- Sidewalk treatments
7Streetscaping Improvements
- Medians to slow traffic
- Bike racks
- Benches
- Planters/landscaping
- On street parking
- Trash cans
- Public art
8Land Use
- Special Use Licenses to allow and encourage
street dining and other spill-over to create a
living streetscape. - City Initiated Re-zonings to encourage mixed-use
developments in the Downtown area - Downtown North District
- Downtown South District
- Downtown Civic District
9Public Spaces
- Gloria Stephan Sale Park
- Carnegie Library gardens
- Library park
10Special Events
- Texas Reds
- Parades (Veterans Day, Cinco de Mayo)
- Downtown Holiday Lighting
- First Fridays
11Downtown Improvement Program
- façade grants
- 1000 per linear foot of street frontage
12Whats next?
- Phase 3 incorporates several improvements based
on public feedback - Trees located on the sidewalks adjacent to
properties and in medians - Angled parking on side streets and
- Wider sidewalks (as much as 15)
13Julie Fulgham,Downtown Planner
- 979-209-5030
- JFulgham_at_BryanTX.gov
- www.BryanTX.gov