Description:

Experience of Inspection Process in LBOD case Voice of People and Bank s Inspection Panel findings Continued . Continued . Continued Continued – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 16
Provided by: cpcsOrgP
Category:

less

Transcript and Presenter's Notes

Title: Experience of Inspection Process in LBOD case


1
Experience of Inspection Process in LBOD case
2
Voice of People and Banks Inspection Panel
findings
3
Continued.
4
Continued.
5
Continued
6
Continued
7
Continued
8
Continued
9
Continued
10
Local people submitted their request for justice
in 2004. After 4 years there is no significant
outcome therefore they reiterate their
legitimate request once again saying that
  • Entire LBOD effluent should be diverted to Dhoro
    Puran Outfall Drain (DPOD), Kori Creek and other
    natural routes, Kadhan Pateji Outfall Drain
    (KPOD) should be completely closed at RD-159
  • The sub-drains of Kotri barrage including Tando
    Bago, Lowari and Seerani drain be let to outfall
    in Rann of Kutch through KPOD at RD 00.00
  • The existing Tidal Link Canal, which is main
    cause of sea intrusion and degradation of
    wetland, should immediately be de-linked. We
    propose that dykes should be constructed in
    between the historical lakes and historical tide
    line, closing the mouth of tidal link canal
  • The ecology of the wetlands should be restored
    and wetlands should be brought on their original
    condition.
  • Government of Pakistan and all the donors
    including World Bank, Asian Development Bank
    should publicly take the responsibility of the
    problems and announce not further extension of
    the LBOD drains.

11
They also demand short term measures to
compensate the losses
  • All the losses including agriculture, livestock,
    houses and wetlands should be calculated in
    collaboration with affectees and they should be
    compensated without any delay.
  • Families of the people who were killed by
    drowning in drains should be separately
    compensated.
  • The World Bank and Government of Sindh should
    initiate a program for employment generation of
    at least 2000 to 3000 people in the area on
    emergency basis to protect the right to life and
    food.
  • The World Bank and Government of Sindh should
    provide free of cost boats, nets, subsidized
    gasoline, livestock and at least for four
    agriculture seasons seed and fertilizer in order
    to cope the economic shocks people have suffered.
  • Government of Sindh should announce immediately
    the free fishing zone for fishermen and should
    shelve the plan if it has to auction or other
    control mechanism on fishing in Badin in order to
    facilitate the majority of people to get out from
    poverty.
  • The water flow to wetlands should be ensured as
    it was before the operation of the project.
  • Government of Sindh should ensure the supply of
    irrigation water to this tail area of the canal
    commands.
  • Free of cost medical facilities should be
    provided on emergency basis to treat the severe
    illnesses like tuberculosis and kidney problems
    for at least two years. This is very serious
    issue and should be tackled on priority basis to
    release the health burden of poor.
  • The government of Sindh and World Bank should
    start a crush program for improving the education
    in this area and bring the people at Par with
    other areas in schooling and providing
    scholarships for higher education.

12
Actions Proposed
  • A high powered committee be constituted to
    investigate the case thoroughly, suggest
    permanent (not adhoc) mitigation measures in
    consultation with the local community to redress
    the grievances of the people and to bring the
    conditions of the area at pre-project level with
    a better hope for their livelihood, education,
    agriculture, livestock husbandry and overall
    better future. The committee shall be authorized
    to fix the responsibility of the project failure

13
High Powered Committee
  • MPA of the area
  • District Nazim Badin
  • Two Bank members one from WB and other from ADB
  • Two members one from WAPDA and one from PID
  • Two nominees from Academia / Technocrats
  • Mr. Mazhar-ul-Haque Siddiqui, Vice Chancellor,
    University of Sindh
  • Mr. Muhammad Idrees Rajput Eminent Scholar and
    Irrigation expert
  • Two members from local community
  • Two members from the leading NGOs working in the
    locality
  • Committee shall to come up with concrete
    proposals and work plan with in 6 months

14
TORs of the Committee
  • Fix responsibility on individuals / institutions
    involved in the project failure and sufferings of
    the people
  • Recommend compensation for the loss to the life
    and property of the local people
  • Propose plan of action to dispose off the
    drainage effluent safely through the natural
    routes without harming the ecosystem. If
    required, the committee may propose abandoning
    the existing infrastructure in broader interest
    of the local community
  • Recommend the actions to revive the sweet water
    dhands, the fishermens livelihood, agricultural
    lands, livestock and natural habitats
  • Propose stopping further extension in LBOD/NDP
    project if not in the best interest of the local
    community
  • Propose using the drainage effluent for the
    development of Thar area if feasible
  • Recommendations of the committee shall be
    obligatory for the Government of Pakistan and the
    donors

15