??????EMBA-6 ??????(TPM) - PowerPoint PPT Presentation

About This Presentation
Title:

??????EMBA-6 ??????(TPM)

Description:

TPM Total Productive Maintenance Total Productive Management Total Perfect Manufacturing Total productive maintenace: what does it mean? Total ... – PowerPoint PPT presentation

Number of Views:209
Avg rating:3.0/5.0
Slides: 43
Provided by: bmNsysuE
Category:
Tags: emba | tpm

less

Transcript and Presenter's Notes

Title: ??????EMBA-6 ??????(TPM)


1
??????EMBA-6
??????(TPM)
  • ??????? ??
  • ????????
  • ?????????????
  • ???????
  • 20041219

2
??????
  • ??
  • ?????,??????????????????????????????
  • ???????????,????????????????????????????
  • ???????,???????????????,???????????

3
TPM??
  • Total Productive Maintenance
  • Total Productive Management
  • Total Perfect Manufacturing

4
Total productive maintenace what does it mean?
  • Total Everyone
  • Productive No wasted activity
  • Maintenace As new condition

5
TPM???
  • ????????(?????)??????
  • ???????????????,????????????????????,???0?????0???
    ??0????
  • ???????,???????????????
  • ??????????????????

6
TPM???
  • Preventive Maintenance
  • 50????????Preventive Maintenance(????,??PvM),???50
    ?????Break-Down Maintenance(????,??BM)?????,??????
    ????????
  • ???????,???????,????????,????????????
  • ????(????????????????),????,????,????,?????

7
TPM???
  • Productive Maintenance
  • 60???Productive Maintenance(????,??PM),???????????
    ?,?????????
  • ????????,?????????
  • ????
  • ????????????
  • ???????????

8
TPM???
  • 70???Total Productive Maintenance(??????,??TPM),??
    ??????????????,?????????????????????????
  • 80????Predictive Maintenance(????,??PdM),?????????
    ????,???????????,??????????,??????????????????????
    ??(Over Maintenance)?

9
TPM???
  • Total Productive Management
  • 90??JIPM???????????TPM????,?????????????????,??TPM
    ????,?????TPM?
  • 91????????????TPM????,?23???700????,??VOLVO?????NA
    CHI INDUSTRIES PTE.LTD.??????????TPM????2????
  • 1999?????????????????????,???????????????????????,
    ???????TPM?????????

10
TPM???????
?? ??????
??????
?????? ??????? ??????
???????? ?????? ??????
???? ???????
???????
???? ???????
???????
???? ???
????????
11
??TPM?????
  • ?80????,???TPM????????????????????????????????????
    ???????????????????,????????????

12
TPM?8???
  • ??????
  • ????
  • ????
  • ????
  • ???????????
  • ????
  • ??????????
  • ??????????

13
TPM?8???
  • ??????
  • ????????????,????????,???????
  • ????????
  • ????????????,????????,??????,???????????
  • ?????????,???????

14
TPM?8???
  • ????
  • ?????????vs????????,???????
  • ??????
  • ????
  • ????

15
TPM?8???
  • ????
  • ????
  • ????
  • ????
  • ????
  • ?????,?????????????,??????????????,????????,??????
    ?,??????,?????????

16
TPM?8???
  • ????
  • ????????????
  • ???????????,?????????

17
TPM?8???
  • ???????????
  • ?????????
  • ?????????(Design Review)
  • ??????80?????,???????????,??80?????
  • ???????

18
TPM?8???
  • ????
  • ???????,????????????
  • ???????
  • 4M(Machine?Material?Method?Man)
  • ???
  • ???????
  • ???,??????????

19
TPM?8???
  • ??????????
  • ???????????????????
  • ??????????
  • ????????
  • ??????

20
TPM?8???
  • ??????????
  • ??3K(????????),??????????????????
  • ??????(False Alarm)??

21
OEE?TPM???????
  • Overall Equipment Effectiveness(??????,???OEE)
  • ?JIPM????TPM?,???????????????

22
??OEE
  • Machine Availability (Scheduled Running Time -
    Downtime)/ Scheduled Running
  • Performance Rate (Std. Cycle Time /Act. Cycle
    Time) X (Act. Cycle Time X Units Produced/ Time
    Available Operating Time)
  • Quality Rate (Units Produced - Defective
    Units)/ Units Produced
  • OEE Availability X Performance Rate X Quality
    Rate

23
OEE
  • Availability is reduced by
  • Shutdowns
  • Breakdowns
  • Changeover times
  • Lack of skilled operators

24
OEE
  • Performance rate is reduced by
  • Failure to operate at the maximum proven rate
    (MPR) or original equipment manufacturers
    specifications (OEMs)
  • Minor stoppages
  • Idling

25
OEE
  • Quality is reduced by
  • Producing waste
  • Defects
  • Rework
  • Start up losses

26
Average OEEs vs World Class OEEs myths and
realities
27
World class OEE
  • UK best about 40-50
  • World class generally accepted as
  • For single product process plant gt 95
  • For batch plant gt 85

28
OEE???
  • ????????????
  • ???????????????????
  • ???????????
  • ???????
  • ?????????

29
TPM?5S????
  • 5S???TPM?????????
  • ???????,????5S?????????TPM?????

30
5S(visible factory)
  • ?5S???????,????????????????
  • ?5S?????????????,?????????5S???????????????

31
The 5Ss
  • In Japanese
  • 1st S ??(Seiri) Sort
  • 2nd S ??(Seiton) Set in order (stabilize)
  • 3rd S ??(Seiso) Shine
  • 4th S ??(Seiketsu) Standardise
  • 5th S ??(Shitsuke) Sustain

32
?5S???? ????-9309????(?)251?
?? ???? ?? ???? ????
? ? 20? 1.??????????? 5
? ? 20? 2.??????????? 4
? ? 20? 3.??????????????? 4
? ? 20? 4.???????????????? 4
? ? 20? 5.??????????????? 3
? ? 20? 1.??????????????? 3
? ? 20? 2.???????????????? 3
? ? 20? 3.???????????????? 4
? ? 20? 4.?????,?????????? 3
? ? 20? 5.???????????? 4
? ? 20? 6.??????????????? 3
33
?5S???? ????-9309????(?)252?
?? ???? ?? ???? ????
?? 20? 1.???????????????? 5
?? 20? 2.???????????????? 4
?? 20? 3.????????????? 4
?? 20? 4.??????????????? 4
?? 20? 5.??????????????? 3
?? 20? 1.3S?????,?????? 4
?? 20? 2.????????????? 4
?? 20? 3.???????,?????? 4
?? 20? 4.?????????? 4
?? 20? 5.???????????????? 4
?? 20?
34
?5S???? ????-9309????(?)252
?
?? ???? ?? ???? ????
? ? 20? 1,?????????????? 4
? ? 20? 2.??????????,???? 4
? ? 20? 3.?????????? 4
? ? 20? 4.????????????,???????? 4
? ? 20? 5.??????????? 4
??



35
TPM????
  • ??????
  • ?????TPM??????
  • TPM?????????
  • TPM???????????
  • TPM???????????
  • TPM??????
  • ????
  • TPM?????(Kick-Off??)

36
TPM????
  • ???????
  • ???????????
  • ????
  • ????
  • ????
  • ????
  • ???????????
  • ????????
  • ??????????????
  • ???????????????

37
TPM????
  • ????
  • TPM???????????
  • ???????TPM???

38
???????
  • ?????
  • ???????
  • ?????,?5S
  • ????autonomous and preventive maintenance
  • ???????(Kaizen)????????
  • ??????,?SMED(Single Minute Exchange of Dies)

39
???TPM???????????
?? ??
??
P (??) ???????
??? 1.52?
??????
??? 1.52?
??????
??? 1/101/250
Q (??) ??????
??? 1/10
??????
??? 1/4
C (??) ????
??   30
D (???) ????
??   50
S (??) ????0,??0
????0,??0
M (??) ?????? 
??   510
40
TPM?????
  • ???????
  • ???????
  • ???????
  • ?????????????????
  • ?????????????

41
??
42
SMED
  • Single minute exchange of dies
  • By Shigeo Shingo
  • The approach to reduce output and quality losses
    due to changeover
Write a Comment
User Comments (0)
About PowerShow.com