Rock Island Contracting Center (RICC) Overview - PowerPoint PPT Presentation

1 / 58
About This Presentation
Title:

Rock Island Contracting Center (RICC) Overview

Description:

rock island contracting center (ricc) overview ... – PowerPoint PPT presentation

Number of Views:216
Avg rating:3.0/5.0
Slides: 59
Provided by: aschqArm
Category:

less

Transcript and Presenter's Notes

Title: Rock Island Contracting Center (RICC) Overview


1
Rock Island Contracting Center (RICC) Overview
2
Army Contracting Command
Army Contracting Command
Expeditionary Contracting Command
Mission and Installation Contracting Command
LOGCAP
Contracting Centers
Contracting Centers
Contracting Centers
Contracting Centers
Contracting Centers
Contracting Centers
Contracting Centers
Contracting Centers
  • Rock Island
  • AMCOM
  • JML
  • SDDC
  • OPM-SANG
  • TACOM
  • REDCOM
  • CECOM

3
Rock Island Contracting Center MissionFY09
Year to Date
Mission Provide Contracting support to Multiple
Customers including ASC, JML LCMC, CMA
FY0811.5B FY09 YTD 7.14B
FIELD SUPPORT DIVISION 4.4B YTD (7.6B FY08)
Logistics Civil Augmentation Program (LOGCAP)
3.3B YTD (5.7B total in FY08) Awards
Administers Task Orders under LOCAP III LOGCAP
IV Field Support/ ARFORGEN 447.9M YTD (1B
FY08) APS Equipment Global Maintenance and
Supply Services (GMASS) Contract Global Property
Accountability Visibility and Accountability of
LBE TPE (SBE/IPBO) Add-on-Armor Installation
and FSR Contracts Support Services LARS,
AMC-Forwards, Force Pro/Ops Center, Stryker
fielding Reachback contracting 688.7M YTD (900M
FY08)
ASC Theatre Support
NEW MISSION SWA Reachback
NEW MISSION CSB/CCO Support
CHEM DEMIL DIVISION 937.0M YTD (1.2B
FY08) Destroy the U.S. Stockpile of Chemical
Weapons While Ensuring Maximum Protection to the
Environment, General Public, and Personnel
Involved in the Destruction Effort Total Systems
Contracting Approaches Multi-phased Design,
Construction, Systemization, Pilot Testing,
Operations, and Closure GOCO Facilities Secretaria
l Indemnification for Unusually Hazardous
Risk RD, MILCON, PROC, and OM Funding Cost
Reimbursable Contracts

AMMO DIVISION 1.8B YTD (2.7B
FY08) Conventional Ammunition Items for PEO Ammo
SMCA Ammunition GOCOs Depots Conventional
Ammo Demil Stockpile Support
JML LCMC
CMA
Total Staff 291Civ/1Mil On Board
394 AMSAA Validated
4
RICC Organization
LOGCAP Contracting
LOGCAP III
TBD
LOGCAP IV
TBD
Trans
5
Reachback Division
5
6
Genesis of Reachback
  • First reach-back efforts started in Sep 07 in
    support of the 408th CSB in Kuwait
  • Directed by SECARMY in response to fraud and
    contract quality issues
  • Root causes of Kuwait issues include
  • Massive increase in workload
  • 150M annually to 1B
  • Growth in complexity of business
  • Lack of defined requirements process
  • Personnel challenges
  • No increase in staffing levels
  • Inexperience of personnel
  • Difficulty in recruiting

7
Why the RICC?
  • Habitual relationship with ASC which has
    world-wide reach tied directly to the war-fighter
  • AFSBs aligned with CSBs in every AOR
  • Able to bring LOGCAP management structure to the
    table, if needed
  • SWA efforts backed by a 300-person Acquisition
    Center
  • Extensive experience executing contracts with
    performance in SWA
  • Experienced with large-dollar service contracts
  • Able to supply needed contracting specialties
  • Pricing, Property, Counsel
  • Able to tap into ACC acquisition solutions and
    resources
  • Existing contracts
  • Acquisition planning expertise
  • More than 2000 Acquisition personnel

8
Reachback Concept of Operations
Customers on the Ground
"Front Office" in Theater
- Customer Interface
- Requirements Development
THE FRONT OFFICE IS KEY TO SUCCESS!
"Back Office" in Rock Island
Contract Execution CONUS based using OCONUS
rules
9
SWA Support Branch
Greg Moore Branch Chief
KBOSSS
Lori Schmidt PCO
CSSC-K
Effie Fragogiannis PCO
Jeremy Miller PCO
Trudy Hallgren PCO
Marie Cramblett Contract Specialist
Vanessa Allardyce Contract Specialist
Beth White Contract Specialist
Amanda Pierce Contract Specialist
Dino Brabant Contract Specialist
Michelle Talbot Contract Specialist
Amanda Long Contract Specialist
Jon Anderson Contract Specialist
Jan Hancks Contract Specialist
Joanne Whitney Contract Specialist
Sam Guzzo Contract Specialist
10
SWA Reachback Key Points
  • Unless specifically directed by the 408th CSB
    Commander, every procurement over 1 million is
    sent to the RICC for execution
  • DCMA administers select Reachback contracts in
    addition to LOGCAP in Kuwait
  • Every major organization in Kuwait has
    requirements executed by Reachback (1st TSC,
    ASG-KU, 401st AFSB, 408th CSB, AFCENT)

UNCLASSIFIED
11
SWA ReachbackUpcoming Requirements
  • Ammunition Supply Point and Theater Storage Area
  • Biometrics Services
  • Dining Facilities
  • Kuwait Base Operations and Security Support
    Services
  • Qatar Base Operations
  • Qatar Base Security
  • Supply Support Activity
  • Telecommunications


12
Requirement Description Storage, Shipment and
Retrograde of Class V AmmunitionPlace of
performance KuwaitCustomer 1st
TSC Performance Period Base year 4 option
yearsProcurement Strategy Full and Open Cost
Plus Fixed Fee
AMMUNITION SUPPLY POINT/THEATER STORAGE AREA
(ASP/TSA)
  • MILESTONES
  • Issue RFP Sep 09
  • Receipt of Proposals Oct 09
  • Contract Award Nov 09

13
Requirement Description Management and
Oversight of Operations, Plans and Training by
ARCENT/CFLCC Biometrics Staff.Place of
performance KuwaitCustomer U.S. Army Central
(ARCENT) Performance Period Base year 4
option yearsProcurement Strategy Full and Open
Firm Fixed Price
BIOMETRICS SERVICES
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Late FY09

14
Requirement Description Food ServicePlace of
performance KuwaitCustomer Area Support Group
Kuwait Performance Period Base year 4
option yearsProcurement Strategy Full and Open
Firm Fixed Price
DINING FACILITIES (DFACs)
  • MILESTONES
  • Issue RFP Jan 09
  • Receipt of Proposals Apr 09
  • Contract Award Aug 09

15
Requirement Description Base Operations Support
ServicesPlace of performance KuwaitCustomer
Area Support Group Kuwait Performance
Period Base year 4 option yearsProcurement
Strategy Full and Open Cost Plus Award Fee
KUWAIT BASE OPERATIONS SECURITY SUPPORT
SERVICES (K-BOSSS)
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Jan 10

16
Requirement Description Base Operations Support
ServicesPlace of performance QatarCustomer
Area Support Group Qatar Performance Period
Base year 4 option yearsProcurement Strategy
Full and Open Cost Plus Award Fee
QATAR BASE OPERATIONS SUPPORT SERVICES
(Q-BOSS)
  • MILESTONES
  • Issue RFP Jan 09
  • Receipt of Proposals Apr 09
  • Contract Award Sep 09


17
Requirement Description Base Security
ServicesPlace of performance QatarCustomer
Area Support Group Qatar Performance Period
Base year 4 option yearsProcurement Strategy
Full and Open Cost Plus Award Fee
QATAR BASE SECURITY SERVICES (Q-BSS)
  • MILESTONES
  • Issue RFP Jan 09
  • Receipt of Proposals Apr 09
  • Contract Award Sep 09

18
Requirement Description Warehouse Support
(Serviceable and Non-serviceable Items)Place of
performance KuwaitCustomer Area Support Group
Kuwait Performance Period Base year 4
option yearsProcurement Strategy Full and Open
Cost Plus Fixed Fee
SUPPLY SUPPORT ACTIVITY (SSA)
  • MILESTONES
  • Issue RFP Late Aug 09
  • Receipt of Proposals Late Sep 09
  • Contract Award Nov 09

19
Requirement Description Telecommunications
ServicesPlace of performance Southwest Asia
AORCustomer PEO-EIS Performance Period
5 year Blanket Purchase Agreement
(BPA)Procurement Strategy Multiple BPA
Awards
TELECOMMUNICATIONS SERVICES
  • MILESTONES
  • Issue RFP Jul 09
  • Receipt of Proposals Jul 09
  • Evaluations Ongoing
  • Contract Award Aug 09

20
JCC Reachback
21
JCC/SDDC Branch
Sue Phares Branch Chief
SDDC ReachbackTeam
JCC ReachbackTeams
Amber Thompson PCO
Cindy Pleasant PCO
Barbara Voss PCO
Rock Woodstock PCO
Jake Adrian PCO
Jon Martel Contract Specialist
John Hemmen Contract Specialist
Ilana Bohren Contract Specialist
Dave Buennig Contract Specialist
Mitzi Wagner Contract Specialist
Sam Bennett Contract Specialist
Tyler Wentler Contract Specialist
Justin Trine Contract Specialist
Derek Schnorrenberg Contract Specialist
Nathan Lee Contract Specialist
Paris Weidenbach Contract Specialist
Jim Doran Contract Specialist
Ashley Fahrenkrug Contract Specialist
Rachelle Fitzgibbon Contract Specialist
22
JCC Reachback
  • First Reachback efforts started in August 08
  • Coordinated by AMC and JCC
  • Initial efforts were test case
  • Overcame organizational resistance
  • Reachback is now an integral execution strategy
  • Executing contracts in Afghanistan and Iraq

23
JCC Reachback Key Points
  • Executed under the same principles as Kuwait
    Reachback
  • DCMA retains contact administration
    responsibility for some RICC-executed JCC
    Reachback contracts (i.e. Omnibus)
  • RICC adheres to JCC policies (Iraqi and Afghan
    First etc..)

24
JCC-I/A and Other ReachbackUpcoming Requirements
  • Airfield Pop-up Barrier Maintenance
  • Airfield Rubber Removal Marking Services
  • Airfield Skywatch Tower Maintenance
  • Contracted Working Dogs
  • Counter Improvised Explosive Device (CIED)
    Marketing Campaign
  • Heavy Lift Seven (Transportation Services)
  • Intel Support Services
  • Iraqi Advisory Task Force
  • Iraqi Parts Warehouse and Maintenance
  • IT Infrastructure Materials
  • Locally Employed Person Screening Cells
  • Low-Cost, Low-Altitude Aircraft
  • Multi-Media Illustrator Support
  • Network Technician Subject Matter Experts (SMEs)
  • Omnibus Life Support Services
  • Pods
  • Postal Operations
  • Provincial Reconstruction Development Committee
    (PRDC) Sustainment and Planning Program
  • Rapid Reaction Information Engagement

25
Requirement Description Airfield Pop-up Barrier
Repair and MaintenancePlace of performance
CENTCOM AORCustomer Air Force Forces
(AFFOR) Performance Period TBDProcurement
Strategy TBD
AIRFIELD POP-UP BARRIER MAINTENANCE
  • MILESTONES
  • Issue RFP Late Sep 09
  • Receipt of Proposals Late Oct 09
  • Contract Award Late Dec 09

26
Requirement Description Airfield Rubber Paint
Removal and Marking Place of performance
CENTCOM AORCustomer AFFOR Performance
Period TBDProcurement Strategy Full Open
IDIQ
AIRFIELD RUBBER REMOVAL MARKING SERVICES
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Late Aug 09
  • Contract Award Sep 09

27
Requirement Description Airfield Skywatch Tower
Repair and MaintenancePlace of performance
CENTCOM AORCustomer AFFOR Performance
Period TBDProcurement Strategy TBD
AIRFIELD SKYWATCH TOWER MAINTENANCE
  • MILESTONES
  • Issue RFP Late Sep 09
  • Receipt of Proposals Nov 09
  • Contract Award Dec 09

28
Requirement Description Provide Contracted
Working Dogs, Handlers, and TrainersPlace of
performance Afghanistan AORCustomer CENTCOM
Performance Period TBDProcurement
Strategy TBD
CONTRACTED WORKING DOGS
  • MILESTONES
  • Issue RFP Sep 09
  • Receipt of Proposals TBD
  • Contract Award Early FY10

29
Requirement Description Counter Improvised
Explosive Device Marketing CampaignPlace of
performance Iraq AORCustomer Multi-National
Corps Iraq (MNC-I) Performance Period
Base year one option year Procurement
Strategy Full and Open IDIQ
CIED
  • MILESTONES
  • Issue RFP Jul 09
  • Receipt of Proposals Aug 09
  • Contract Award Sep 09

30
Requirement Description Heavy Equipment
Transportation Services Place of performance
Kuwait, Iraq, and Saudi ArabiaCustomer 1st
Theater Sustainment Command (593rd Sustainment
Brigade)Performance Period TBDProcurement
Strategy TBD
HEAVY LIFT SEVEN (HL7)
  • MILESTONES
  • Issue RFP Dec 09
  • Receipt of Proposals Jan 10
  • Contract Award Mar 10

31
Requirement Description Multi-faceted Program
Consisting of Coordination/Special Advisors,
Intelligence Analysts, Planners, Counter
Intelligence Support, and Special Security
Personnel Place of performance Iraq
AORCustomer Multi-National Forces Iraq
(MNF-I) Performance Period Base year 4
six-month option periodsProcurement Strategy
Full and open IDIQ
INTEL SUPPORT SERVICES
  • MILESTONES
  • Issue RFP Jun 09
  • Receipt of Proposals Jul 09
  • Contract Award Sep 09

32
Requirement Description Technical Support
Services, SMEs, and Other Various Advisory
Support ServicesPlace of performance Iraq
AORCustomer MNC-I Performance Period
TBDProcurement Strategy TBD
IRAQI ADVISORY TASK FORCE (IQATF)
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award Early FY10

33
Requirement Description Provide Vehicle Parts
Inventory Management System Place of
performance IraqCustomer Iraq Ministry of
Interior (MOI)Performance Period
TBDProcurement Strategy TBD
IRAQI PARTS WAREHOUSE AND MAINTENANCE
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

34
Requirement Description Provide Various IT
Infrastructure Supplies Place of performance
CENTCOM AORCustomer AFFOR Performance
Period N/AProcurement Strategy Full and
Open IDIQ
IT INFRASTRUCTURE MATERIALS
  • MILESTONES
  • Issue RFP Jul 09
  • Receipt of Proposals Aug 09
  • Contract Award Sep 09

35
Requirement Description Establish and Maintain
a Ten-hour, Five-day Per Week Operation of a
Locally Employed Person (LEP) Screening
CellPlace of performance CENTCOM AORCustomer
AFFOR Performance Period TBDProcurement
Strategy TBD
LOCALLY EMPLOYED PERSON SCREENING CELLS
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Oct 09

36
Requirement Description Provide Small Aircraft
Used to Perform Low Altitude DropsPlace of
performance Afghanistan AORCustomer Various
Performance Period TBDProcurement Strategy
TBD
LOW COST, LOW ALTITUDE AIRCRAFT
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

37
Requirement Description Provide Additional
Multi-Media Illustrator Support Place of
performance Iraq AORCustomer Multi-National
Division South (MND-S) Performance Period
Base year 1 option yearProcurement Strategy
Firm Fixed Price Contract
MULTI-MEDIA ILLUSTRATOR WITH IRAQI CULTURE
EXPERTISE SUPPORT
  • MILESTONES
  • Issue RFP Jul 09
  • Receipt of Proposals Aug 09
  • Contract Award Sep 09

38
Requirement Description Provide Network
Technicians, Engineers, and Audio/Visual
SMEsPlace of performance Afghanistan
AORCustomer JCC-Afghanistan Performance
Period TBDProcurement Strategy TBD
NETWORK TECHNICIAN SMEs
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Oct 09

39
Requirement Description Provide Various Life
Support Services, i.e. DFACs, Laundry Services,
Maintenance, etc.Place of performance Iraq
AORCustomer Various Performance Period
TBDProcurement Strategy TBD
OMNIBUS LIFE SUPPORT SERVICES
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

40
Requirement Description 32 each Expeditionary
Pods and 16 Build Pallets Place of performance
Afghanistan AORCustomer Task Force Guardian
Performance Period TBDProcurement
Strategy TBD
PODS
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

41
Requirement Description Operation of Army Post
Offices (APOs)Place of performance Afghanistan
AOR Customer 38th HR Co. Performance
Period TBDProcurement Strategy TBD
POSTAL OPERATIONS
  • MILESTONES
  • Issue RFP Nov 09
  • Receipt of Proposals Jan 10
  • Contract Award Mar 10

42
Requirement Description Provide Training
Technical Support and Other Assistance to
Strengthen Iraqi Provincial Governments Ability
to Deliver Essential ServicesPlace of
performance Iraq AORCustomer Corps of
Engineers Performance Period
TBDProcurement Strategy TBD
PRDC SUSTAINMENT AND PLANNING PROGRAM
  • MILESTONES
  • Issue RFP Late Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Oct 09

43
Requirement Description TBDPlace of
performance Iraq AORCustomer 34th Infantry
Division Performance Period TBDProcurement
Strategy TBD
RAPID REACTION INFORMATION ENGAGEMENT
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

44
Requirement Description Provide Increased
Rotary Wing Support for Passengers and
CargoPlace of performance Afghanistan
AORCustomer Combined Joint Task
Force Performance Period TBDProcurement
Strategy TBD
ROTARY WING SUPPORT
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award TBD

45
Requirement Description Classified Information
Operations Support ServicesPlace of performance
Iraq and Afghanistan AORsCustomer
Various Performance Period TBD Procurement
Strategy Full and open IDIQs
SEVERAL CLASSIFIED REQUIREMENTS
  • MILESTONES
  • Issue RFP Varies per requirement
  • Receipt of Proposals Same as above
  • Contract Award Same as above

46
Requirement Description Provide 24-hour per day
Shuttle Bus ServicesPlace of performance
Kuwait AORCustomer Area Support Group
Kuwait Performance Period TBDProcurement
Strategy TBD
SHUTTLE BUS SERVICE
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Oct 09

47
Requirement Description Warehouse Operation
SupportPlace of performance Iraqi Joint
Operating Area (IJOA)Customer
MNC-I Performance Period Base year 1
option yearProcurement Strategy Full and open
IDIQ
WAREHOUSE SUPPORT SERVICES
  • MILESTONES
  • Issue RFP Jul 09
  • Receipt of Proposals Aug 09
  • Contract Award Sep 09

48
SDDC Reachback
49
SDDC Reachback
  • Prior to FY 08, SDDC Support in CENTCOM executed
    by 409th CSB team in Bremerhaven
  • Approached by SDDC PARC in April 08 to execute
    this mission
  • MOA executed on 1 Jun 08
  • Assumed immediate responsibility for all SDDC
    requirements in CENTCOM AOR
  • Deployed personnel forward to provide On the
    Ground support to 595th TTG in Kuwait

50
What We Provide SDDC
  • Contracting Support
  • Full Compliance on all contracts with CENTCOM
    required initiatives such as Quarterly CMR
    Census, SPOT, Vetting of Armed Contractors
  • Centralized Host Nation Support, Local Tariffs
    and FAR-based requirements across CENTCOM
  • Other Support
  • Assist in consistent requirements definition
    through standard IPTs
  • Tracking and Training of Contracting Officer
    Representatives (CORs)
  • Standard Operating Procedures developed to
    centralize challenges for resolution
  • Liaison contracting efforts between TRANSCOM and
    SDDC

51
SDDC ReachbackUpcoming Requirements
  • AFRICOM Line Haul
  • Alaska Stevedoring and Related Terminal Services
    (SRTS)
  • Cellular Phone Services
  • Iraq Third Party Logistics (3PL) Support
  • Jordan 3PL
  • Pakistan 3PL
  • United Arab Emirates SRTS
  • Various SDDC Supply Requirements

52
Requirement Description Provide Transportation
Line Haul ServicesPlace of performance Africa
AORCustomer 598th CSB Performance
Period TBDProcurement Strategy TBD
AFRICOM LINE HAUL
  • MILESTONES
  • Issue RFP TBD
  • Receipt of Proposals TBD
  • Contract Award FY10

53
Requirement Description Provide SRTS
SupportPlace of performance Alaska
AORCustomer 598th CSB Performance
Period TBDProcurement Strategy TBD
ALASKA SRTS
  • MILESTONES
  • Issue RFP Late Aug 09
  • Receipt of Proposals Late Sep 09
  • Contract Award Early FY10

54
Requirement Description Provide Cellular Phone
ServicesPlace of performance CENTCOM
AORCustomer Various Performance Period
Base 2 option yearsProcurement Strategy Full
and open Multiple Award IDIQ
CELLULAR PHONE SERVICES
  • MILESTONES
  • Issue RFP Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Late FY09

55
Requirement Description Provide 3PL
SupportPlace of performance Iraq AORCustomer
595th CSB Performance Period
TBDProcurement Strategy TBD
IRAQ 3PL SUPPORT
  • MILESTONES
  • Issue RFP Late Aug 09
  • Receipt of Proposals Sep 09
  • Contract Award Late FY09

56
Requirement Description Provide 3PL Support
Place of performance Jordan AORCustomer
595th CSB Performance Period
TBDProcurement Strategy TBD
JORDAN 3PL SUPPORT
  • MILESTONES
  • Issue RFP Sep 09
  • Receipt of Proposals Oct 09
  • Contract Award 2nd Qtr FY10

57
Requirement Description Provide 3PL
SupportPlace of performance Pakistan
AORCustomer 595th CSB Performance
Period TBDProcurement Strategy TBD
PAKISTAN 3PL SUPPORT
  • MILESTONES
  • Issue RFP Sep 09
  • Receipt of Proposals Oct 09
  • Contract Award 2nd Qtr FY10

58
REACHBACK POCs
Mr. Jim Loehrl, SES Director, ACC Rock Island
Contracting Center Mr. Mike Hutchison Dep
Director, ACC Rock Island Contracting Center Mr.
Jay Carr Chief, Reachback Division ACC Rock
Island Contracting Center Mr. Greg Moore Chief,
SWA Support Reachback Branch ACC Rock Island
Contracting Center Ms. Sue Phares Chief,
JCC/SDDC Reachback Branch ACC Rock Island
Contracting Center Ms. Amber Thompson SDDC Team
Procuring Contracting Officer ACC Rock Island
Contracting Center
Write a Comment
User Comments (0)
About PowerShow.com