Briefing for DCSENGR/DCSINT decision and way ahea - PowerPoint PPT Presentation

1 / 60
About This Presentation
Title:

Briefing for DCSENGR/DCSINT decision and way ahea

Description:

Briefing for DCSENGR/DCSINT decision and way ahead – PowerPoint PPT presentation

Number of Views:168
Avg rating:3.0/5.0
Slides: 61
Provided by: damiArmyP
Category:

less

Transcript and Presenter's Notes

Title: Briefing for DCSENGR/DCSINT decision and way ahea


1
Theater Geospatial Database Overview
MAJ Jack Haefner GIS Officer USARPAC Deputy
Chief of Staff, G2
Mr. Ron Bijeau Chief, GIS Branch USAREUR Deputy
Chief of Staff, Engineer,18th Engineer Brigade
2
Agenda
Introduction Purpose - Locations -
Problem set - Solution set - What is the
TGD
  • USAREUR TGD
  • - Theater Org Chart
  • - Personnel
  • - Equipment
  • - Software

USARPAC TGD Theater Org Chart -
Personnel - Equipment - Software -
Closing Funding - Execution Plan - Future
Development - Conclusion
3
Purpose
  • Provide an overview of USAREUR and USARPAC
    efforts to develop and implement a Theater
    Geospatial Database (TGD).

Detailed questions will be answered at the TGD
Workshop or demonstration.
4
Current and Future Locations
29
30
565
5
70
175
320
132
60
100
1203
1204
5
Problem Set
  • There is no standardized theater geospatial
    database available to support geospatial and
    intelligence analysis during the IPB and EBA
    process.
  • There is no effective method for sharing
    geospatial data with the National
    Geospatial-Intelligence Agency (NGA).
  • Geospatial operations are product-based and
    therefore data are created, managed and
    disseminated in an ad hoc approach which varies
    from theater to theater. Its like building cars
    one car at a time
  • Standard NGA datasets are incomplete and do not
    meet data-centric operational requirements.

IPB Intelligence Preparation of the
Battlefield EBA Engineering Battlefield
Assessment
6
Solution Set
  • Standardized data structure on Army fielded
    systems Digital Topographic Support System
    Base (DTSS-B)
  • Standardized commercial-off-the-shelf (SCOTS)
    software tools to create, analyze, manage and
    disseminate geospatial data and products
  • Standardized metadata scheme based on existing
    standards
  • Populate the TGD data model with data from NGAs
    Geospatial Intelligence Feature Database (GIFD)
    and other sources
  • Develop a data-centric geospatial concept of
    operations
  • Promote standardization by establishing an Army
    TGD/DTSS Configuration Control Board
  • Implement a scaled TGD capability on all DTSS at
    other echelons and theaters

7
What is the TGD?
  • Standardized hardware systems DTSS with
    additional HW/SW
  • Standardized commercial-off-the-shelf (SCOTS)
    software ESRI (ArcGIS/IMS/SDE, PLTS, JTX) ERDAS
    Imagine, SOCET SET, SQL Server 2000
  • Standardized data model based on the FACC
  • Standardized metadata scheme critical for data
    discovery and analysis
  • Standardized data-centric geospatial Tactics,
    Techniques and Procedures (TTP)
  • Personnel military, DA civilian, and contractors

8
TGD Functional Architecture
Data Ingest
Data Editing Maintenance
Data Dissemination (DGInet)
Production Data (reduced schema) Metadata
(ICML format)
Metadata Tool
Imagery
Reference Data (DGInet Raster)
Admin Tool
ArcSDE 8.3 (SQL Server)
Production Data - Global - Strategic -
Tactical - Urban
Data Analysis
Hardcopy Map Sources
(External to TGD Development)
DTSS - ArcGIS 8.3 - ERDAS
Hardcopy Maps on Demand (TBD)
Metadata
Data Product Output
Reference Data
Product Data (raster, vector, flat files)
TGD Data Store
- Windows 2000 - SQL Server - ArcSDE 8.3 - Flat
File Server
Distributed Editing
(TBD)
9
From Concept to RealityStanding-up the TGD
The Front Door of the TGD - SIPRNET
10
USARPAC
  • Organization
  • Personnel
  • Equipment
  • Software

11
USARPACOrganization
G-2 Staff Group
Intel Support Division
Plans and Operations Division
Security Team
USARPAC Intel Computer Center
OPCON
17th OWS, USAF Weather Support
5th EN Det (PC)
J2X
5
0
70
12
Manning the TGD
THEATER GEOSPATIAL DATABASE
MANAGER
2 X IMAGERY ANALYSTS
2 X GIS ANALYSTS
1 X Dbase STEWARD (GS) / 1 X SYSTEM ADMIN /
WEB AUTHOR
  • Skill Sets
  • PLTS
  • Virtual Campus
  • Smart Force
  • OJT
  • Network Training (DOIM)

NGA Geospatial Analyst
Geospatial Technician
13
USARPAC Personnel
  • PERSONNEL
  • VACANT Topographic Engineer (O-5)
  • MAJ Haefner ATTE/OIC
  • MSG Guess Topo SGM/NCOIC (E-9)
  • CPT Battaglia Topo/Prod Officer
  • CW2 Small Geospatial Analysis Tech
  • SFC Reyes Sr. Topo Survey Sgt
  • VACANT Lithographic Ops Sgt
  • VACANT Sr. Topo Analyst
  • SPC Maisal Topo Analyst
  • SPC White Admin Clerk
  • VACANT Admin Specialist (E-4)
  • GS-11, Mr. Bingue Database Manager
  • SGT Vincent QRS NCOIC
  • SPC Dickens QRS Geo Analyst
  • SPC Aomizu QRS Geo Analyst
  • PFC Herrera QRS Geo Analyst
  • Bryce Wyble NGA Geo Analyst
  • Doug Mahoney SAIC Geo Analyst
  • EQUIPMENT
  • DTSS-Base (TGD)
  • DTSS-Deployable
  • 1 M998
  • 3X36 Plotters
  • 1X60 Plotter
  • NOTES
  • G2 provides Connectivity (NIPR, SIPR, JWICS)

AUTHORIZED 11 X MILITARY ASSIGNED 7 X
MILITARY
14
USARPAC Equipment
SkyMedia
ArcGIS 8.3 (ArcInfo) Imagine 8.7 PLTS Def Soln w/
JTX
GBS
RBM
ArcGIS 8.3 (ArcInfo) Imagine 8.7 SOCET SET w/
Stereo Editor PLTS Def Soln w/ JTX
MS SQL Server 2000 ArcSDE
CDL 00002 (ESRI)
15
TGD Concept
  • Improve and value-add data
  • Produce tailored products

Push to JWICS
Push to SIPRNet
Push to NIPRNet
16
USARPAC Response to Readiness
1250,000 Scale Data (NGA)
Image Map (USARPAC)
125,000 Extracted and Populated Into TGD
(USARPAC)
Nautical Charts (c. 1989, Chinese) from NGA
1 Apr
2 Apr
14 Apr
22 Apr
TIMELINE OF EVENTS
17
USAREUR
  • Organization
  • Personnel
  • Equipment
  • Software

18
USAREUR Organization
XXXX

HQ USAREUR
60TH Eng Det (PC) 2 1 7 10
DTSS-H DTSS-D PRINT SQD GRAPHIC SQD SUVERY
SQD 2 TERRAIN ANAL 4
DTSS-B DTSS-D DATA MANAGEMENT PLANNING
CONTROL
XXX

HQ, V CORPS
Terrain Platoon 1 1 22 24
DTSS-D TERRAIN ANAL
320TH Eng Co 3 1 82 86
XX
XX
1 AD
1 ID
510TH Eng Det 1 0 2 3
526TH Eng Det 1 0 2 3
DTSS-H DTSS-D TERRAIN ANAL 1
DTSS-H DTSS-D TERRAIN ANAL 1
517TH DET 0 0 6 6
518TH DET 0 0 6 6
19
USAREUR Personnel
18th ENGINEER BRIGADE (TA)
CH, GIS BRANCH
GEOSPATIAL ARCHITECTURE
GEOSPATIAL TEAM, SETAF Mr. Bijeau, GS13
Mr. Yaryan, GS13 (SPAWAR) Ms. Frick,
NGIT Mr. Bonnette, NGIT (Sep 04)
60th ENGINEER DETACHMENT (PC)
PLANNING AND CONTROL/ OPERATIONS
IMAGE PROCESSING
DATA EXTRACTION
DATA FINISHING
REPRODUCTION/ DISTRIBUTION
  • Mr. Finney, GS11
  • Vacant, GS12
  • CW2 Cossell, 215D
  • SFC Heitkamp, 21S
  • SSG Dela Rosa, 21S
  • Vacant, GS12
  • Mr. Wright, GS11
  • SGT Adams, 21U
  • PFC Rhodes, 21U
  • SPC Gobble, 21U
  • SPC Plicka/Behnken
  • Mr. Livingood, NGIT
  • Mr. Ryska, NGIT
  • Vacant, NGIT
  • - Mr. Walker, GS11
  • SFC Bonnette/Ali, 21U
  • PFC Rhodes, 21U
  • Ms. McVicker, NGIT
  • Mr. Albiez, IC-05

INFORMATION TECHNOLOGY
WEB DESIGN/SYSTEM ADMINISTRATION
DATABASE MANAGEMENT/ADMINISTRATION Mr.
Cornell, GS12 Cartographer,
GS07 Mr. Strahan, EDS
20
USAREUR Equipment
IMAGE PROCESSING SECTION
PRODUCTION MANAGEGMENT (PC)
HUB
Sun Ultra 60
Sun Ultra 60
Dell 650 WS
Dell 650 WS
Optia WS
Optia WS
Sun 60 WS
Dell 650 WS
Dell 650 WS
Dell 650 WS
Dell 650 WS
REPRODUCTION SECTION
EXTRACTION/FINISHING SECTION
HUB
36 Scanner
Optia WS
36 Scanner
Sun 60 WS
Optia WS
Dell 650 WS (x2)
DTSS-D
HP All-In-One
Compaq
DVD/CD Duplicator
HP 5000 (x6)
HP 1055
HP 2200
INFORMATION TECHNOLOGY SECTION
Foundry Switch Big Iron 4000
Disk Array (x5)
Cisco Router
Sun Enterprise 350
DELL PowerEdge 2500 (x2)
Xerox Scanner
HP Vectra
Compaq
Dell Dimension
Dell 650 WS
DVD Jukebox
KG-84 Kiv-7
SIPRnet
Winchester FLASHNAS
PairGain Modem
43rd Signal
Database Management
Web/Systems Administration
21
TGD Software
Data Acquisition
Data Master
Sky Media
GBS
Data
Production
ArcGIS
Imagine
SOCET SET
Production Line Tool Set (PLTS) Job Tracking
Extension (JTX) CTIS Tactical Decision Aid
Software
Data Management
ArcSDE
SQL Server
ArcCatalog
Data/Product Visualization and Dissemination
JIVA-V
DGINet
GLIDE (TBD)
ArcIMS
22
Skills Assessment
  • Modify/Use Cross-Reference Databases
  • Perform Systems Administration and Basic Software
    and Hardware Troubleshooting
  • Perform/Supervise Feature Extract Using
    Predefined Specification
  • Run Topology, Consistency, and Logic QC on
    Geodatabase
  • Tune/Maintain Enterprise Database (MS SQL)
  • Version Geodatabases
  • Acquire and Prepare Imagery Sources for Feature
    Extraction (stereo- or monoscopic)
  • Create/Modify/Use Valid Value Tables/Knowledgebase
    s for Symbolization and QC
  • Establish Basic Network Configurations
  • Ingest NGA-standard and Non-standard Data Into
    Spatial Geodatabases
  • Load/Install software
  • Manage Distributive Databases

Joint/Interagency
ASCC
Detachment
PC (GPC) Required Skills
MOS
23
TGD FY04 Funding
  • Initial Development 600K 300K
  • USAREUR TGD G2 Enhancements 150K
  • Geospatial Analysts (43) 572K 450K
  • Systems Engineer 175K 150K
  • Web Designer 170K
  • 1,667K 900K

USAREUR
USARPAC
24
Execution Plan
Oct 03 Dec 03 Feb 04 Apr 04 Jun 04 Aug
04 Oct 04
Project initiation
Critical design review (CDR)
Data model prototype
TGD prototype complete
TGD prototype install (Hawaii and Germany)
TGD IOC/initial data loads (NGA GIFD and others)
Expanded GIFD load
USAREUR G2 enhancements
TGD FOC
25
Further TGD Development
  • Establish Baseline 1.0 TGD data model
  • Continue fixing prototype tools (i.e., PLTS,
    JTX, JIVA-V, etc.)
  • Extending the data model
  • Additional server side tools (ArcServer 9)
  • Tracking server
  • Automatic feature extraction
  • Stereo extraction integrated into PLTS

26
TGD Value Adding
Initial product or data call
Data Load
1
2
TGD-DB
Find/Load Data
TGD-DB
Build/Extract Data
JIVA-DB
JIVA-DB
www
Replicate/Push Data to Dissemination Server
Dynamically Updated Product and Site
3
4
TGD-DB
TGD-DB
JIVA-DB
JIVA-DB
27
Disconnected Editing
TGD forms Initial map baseline
Check-In Data to TGD
Check-Out
Check-In
Checkout mission dataset
Check-In
Check-Out
Check-outs To individual ArcPad devices
Check-In
Check-Out
28
Offsite Storage
29
Conclusion
  • In theater production capability
  • Not replacing NGA (we still have production
    requirements!!)
  • Look forward to USARCENT participation
  • Operational Benefits
  • Extracts Versioning
  • Provisions for offsite storage
  • In theater production capability

30
Points of Contact
USAREUR Ronald W. Bijeau Ch, GIS Branch DSN
314-370-7202 CW2 Jim Cossell 60th En Det
(PC) COM 011-49-(0)6221-57-7202 CW3 Dave
Kasten USAREUR GIS Officer NIPRNet
ronald.w.bijeau_at_us.army.mil SIPRNet
ronald.bijeau_at_dcsops.hqusareur.army.smil.mil
TGD DGInet (SIPRnet) http//tgd.60engdet.hq
usareur.army.smil.mil/jiva/start.html USARPAC MA
J Jack Haefner USARPAC GIS Officer DSN
315-438-7502 /MAJ Nathan Rainey 5th En Det
(PC) COM 808-438-7502 (incoming) NIPRnet
haefnerjh_at_shafter.army.mil SIPRnet
haefnerjh_at_shafter.army.smil.mil TGD DGInet
(SIPRnet) http//128.80.136.007/jiva/start.html
CENTCOM/NORTHCOM/FORSCOM MAJ David Foster 132d
En Det DSN 797-7218 Peter Swan FORSCOM GIS
Officer COM 404-469-7218 SIPRnet
laintdaf_at_force1.army.smil.mil https//freddie
.forscom.army.mil/G2-132ndEng/default.htm TEC Den
ise Hovanec TEC TGD Lead DSN 328-6759 COM
703-428-6759 NIPRnet denise.hovanec_at_usace.ar
my.mil
31
Backup Slides
32
Theater Geospatial Database (TGD)The Strategy
the Solution
  • User Base
  • Intelligence Community
  • PACOM
  • USARPAC
  • USARJ/USARAK/USARHAW
  • MARFORPAC
  • PACAF/NAVPAC
  • TEC
  • Other (PDC, FBI, NOAA, NGA)
  • Contributors
  • USAREUR
  • MARFORPAC
  • TEC
  • TPIO-TD
  • 1TOPO (ADF)
  • NGA

Other
  • Imagery components
  • Softcopy (finished product)
  • Programming
  • FY03 GWOT Supplemental (Sep 03-Sep 04)
  • FY05 URR Plug
  • FY06-11 NGA RRL
  • Through PACOM
  • Co-Sponsorship by DAMI-POB and EUCOM
  • FY06-11 POM
  • USPACOM and USARPAC IPL
  • USAES/MANSCEN

Four Components
  • Requirement in-theater geospatial production
    and an on-demand reach capability to theater
    geospatial analysis
  • Problem no PACOM-wide geospatial database exists
    for analysis
  • Methodology
  • Multiple resolutions
  • Data production, archiving and storage
  • On-demand dissemination
  • Uses existing DTSS-B backbone

1
Civilian Hires
2
Data Base Population
3
Data Modeling/Build Data Base
4
Dissemination/Archive Data
Concept Born
GWOT Supplemental
Analysts On Station
Data Modeling w/ TEC, USAREUR
Prototype/ Testing/IOC
POM/IPOM
FOC
Sep
Nov
Dec
Mar
Aug
Maintenance?
2001
2002
2003
2004
33
Clipping and Local Copies
34
Legacy Directory Structures
  • Typical Analyst
  • Current Structure

Schema From NIMAs Index of Regions
35
BENEFITS OF TGD
  • Critical to transformation to data-centric
    operations
  • Externalizes relevant data from NGA (i.e., GIFD)
  • Provides data for terrain and intelligence
    analysis support to IPB/EBA process
  • Vector data support to future systems (i.e.,
    DGCS, FCS)
  • Standardizes and enforces data-centric TTPs
  • User-friendly web-enabled interface via SIPRNET
  • More efficient bandwidth usage than raster data
  • Promotes data accuracy and integrity
  • Increased data visibility via standardized
    metadata
  • End-user on-line help capability
  • Leverage development efforts by other agencies

36
Challenges With Current NGA Data
  • Vmap?FFD?VITD Spec
  • Unified Data Profile (2122 Feature Categories)
  • FACC (6061 possible attribution schemes)
  • SDSFIE
  • GIFD

37
USAREUR Challenges
  • Continuity of Operations Plan (COOP) Site
    Storage
  • Maintain a synergistic relationship between the
    Engineer and Intelligence staff
  • Upgrade inter/intra communication networks
  • Develop capability to push data to JWICS
  • No POM funding for TGD sustainment
  • No established process for reconciling
    databases with tactical units and NGA

38
UA/UE Geospatial Support
TAC1
MAIN
M


E



E

E
E

E
PRINT
E
E


GIS

E
GEN

PRINT
GIS
E
E

PRINT
GIS

E
E
GIS
E
GIS
PRINT
E
GIS
PRINT
GIS
GIS
39
Embedded Geospatial Modules
HSOC/RCC Data Management and Generation Module
UEx/UEy Geospatial Module
Light Geospatial Module
2-2-22-26
0-1-8-9
0-0-4-4
TDA - 10
1 HMMWV Exp Cap 1 DTSS-Light 1 Trlr Mntd
Gen Set 1 HMMWV 1 HMMWV Trlr
2 - HMMWV 1 HMMWV Exp Cap 1 DTSS-Light 2
DTSS-Deployable 1- Trlr Mntd Gen Set 2 HMMWV
Trlr
0-1-20-21
2-1-2-5
1 DTSS-Base 2 DTSS-Deployable 1 HMMWV
Critical Collective Tasks Performs analysis,
manages, and disseminates geospatial information
products. Embedded in maneuver and selected
support UAs and UEx and UEy TACs.
Critical Collective Tasks Performs geospatial
analysis, fuses, conflates, generates, and
manages geospatial databases, and disseminating
geospatial information products. Embedded
capability in UEx and UEy MAIN CP.
Critical Collective Tasks Collect, generate,
conflate, fuse, and manage geospatial data bases
theater level databases Embedded capability in
HSOC and RCC HQs.
Capabilities Generate, Manage, and Distribute
Theater Level GIS Data and Products Manages and
distributes theater GIS database Provides
theater level terrain analysis for planning
Capabilities Generate, Analyze, Manage, and
Distribute GIS Products Provide detailed terrain
analysis for UEx/UEy AO Manages and updates
UEx/UEy geospatial database 24-hour operations
Capabilities Manage, Analyze, and Distribute
GIS Products Provide Mobility Assessment 24-hour
operations
40
Geospatial Company
6-2-204-212
MISSION Provide C2 for the training readiness
and employment of topographic modules in support
of theater level and HLS GIS operations.
2-0-10-12
1-1-27-29
0-0-11-11
0-0-8-8
4 DTSS-Deployable 4 LMTV 2 Launch/Recovery
Vehicles 2 UAV Cl IV 2 LIDAR Detectors
FORCE ALLOCATION ASSUMPTIONS Number of UEy HQs
in JOA Number of FEMA regions Number of
multi-national divisions and multinational
brigades operating in a JOA
2 DTSS-HVMP 2 MTV-LWB 1 DTSS-Deploy 1
LMTV
1 Exp cap HMMWV 1 DTSS-Light 1
DTSS-Deployable 1 Trlr Mntd Gen Set 1 LMTV 1
LMTV Trlr
1-1-35-37
1-1-35-37
41
Proposed FY05 GIS Budget
  • Geospatial Analysts (3) SFOR (GWOT) 429K
  • Geospatial Analysts (3) KFOR 429K
  • Geospatial Architect (Mr. Yaryan) 175K
  • Web Designer (Mr. Strahan) 170K
  • Geospatial Database Administrator (1) TGD 150K
  • 60th Eng Det Unit Operational Funds 100K

  • 1.45M
  • Funding Strategy
  • Seek cost-sharing opportunities
    (G2/DA/TEC/USARPAC/USAES/NGA)
  • Consolidate contractors at 60th Eng Det for
    leverage quantities of scale
  • Transition from Contingency Operations to Base
    Operations funding

42
GIS Branch (FDU)
18th ENGINEER BRIGADE (TA)
CH, GIS BRANCH
GEOSPATIAL ARCHITECTURE
GEOSPATIAL TEAM, SETAF Mr. Bijeau, GS13/14
Mr. Yaryan, GS13 (SPAWAR) Ms.
Frick, NGIT Mr. Bonnette, NGIT
(Sep 04)
60th ENGINEER DETACHMENT (PC)
PLANNING AND CONTROL/ OPERATIONS
IMAGE PROCESSING
DATA EXTRACTION
DATA FINISHING
REPRODUCTION/ DISTRIBUTION
  • Mr. Finney, GS11
  • - SGT 21U
  • - SPC 21U
  • PFC 21U
  • - LTC 21B
  • - MAJ 21B
  • WO3 215D
  • - SGM 21Y
  • MSG 21U
  • SFC Heitkamp, 21S
  • SPC 21U
  • Vacant, GS12
  • Vacant, GS12
  • Mr. Wright, GS11
  • SGT Adams, 21U
  • SPC Gobble, 21U
  • SPC Plicka/Behnken
  • - SGT 21U
  • - SPC 21U
  • - SPC 21U
  • Mr. Livingood, NGIT
  • Ryska, NGIT (Jun 04)
  • Contractor, NGIT
  • - Mr. Walker, GS11
  • SFC Bonnette/Ali, 21U
  • PFC Rhodes, 21U
  • SSG Dela Rosa, 21S
  • - SGT 21U
  • - SPC 21U
  • SPC 21U
  • Ms. McVicker, NGIT
  • Mr. Albiez, IC-05
  • - SGT 21U
  • - SPC 21U

INFORMATION TECHNOLOGY
WEB DESIGN/SYSTEM ADMINISTRATION
DATABASE MANAGEMENT/ADMINISTRATION Mr.
Cornell, GS12
Cartographer, GS07 (Convert to DBA, GS11/12)
Mr. Strahan, EDS
Contractor, NGIT SGT 74B
WO2 Cossell, 215D SPC 74B SPC
21U
43
TGD INTEROPERABILITY
A STANDARDIZED DATA MODEL WILL HELP CAPTURE
AND DISSEMINATE THEATER VALUE ADDED DATA
NIMA NIL/GIFD/GIDI
STRATEGIC
EUCOM ERL
TEC GEO SERVER
STANDARDIZED DATA MODEL
OPERATIONAL
USAREUR DTSS-B/D
VCORPS DTSS-H/L/D
DIV/JTF DTSS-H/L/D
TACTICAL
BDE/JTF DTSS-D
44
TGD Funding
  • Startup Development Cost
  • USAREUR DCSENG/18th Eng Bde 600K
  • USAREUR G2 150K
  • Personnel Cost (Previously Existing)
  • Geospatial Analysts (2) 286K
  • Geospatial Systems Architect 175K
  • Web Designer 170K
  • Sustainment
  • SW/HW Maintenance 50K
  • Supplies 50K

45
REFERENCES
  • ARMY FIELD MANUAL 3-34.230 DATA MANAGEMENT
  • FUTURE COMBAT SYSTEM ORD (AS OF 30 AUG 02)
    GENERAL REQUIREMENT
  • UNIT OF ACTION ORGANIZATION AND OPERATION PLAN
    (AS OF 22 JUL 02) INFORMATION
  • UNIT OF EMPLOYMENT ORGANIZATION AND OPERATION
    PLAN (AS OF 10 JULY 02) KNOWLEDGE
  • BATTLE COMMAND ORGANIZATION AND OPERATION CONCEPT
    PLAN COMMANDER DRIVEN MISSION ORDERS
  • DISTRIBUTED COMMON GROUND SYSTEM-ARMY ORD (DRAFT)
    GEOSPATIAL INFORMATION
  • NIMA STRATEGIC INTENT COMMON, DIGITAL,
    GEOSPATIALLY REFERENCED FRAMEWORK
  • GEOSPATIAL INFORMATION IS KEY TO FUTURE
  • SYSTEMS!

46
BACKGROUND
  • DTSS-B WILL BE FIELDED TO THEATERS (29TH ENG BN,
    30TH ENG BN AND 60TH ENG DET) IN FY03
  • GEOSPATIAL DATA CREATION AND MANAGEMENT IS A KEY
    FUNCTION OF THE DTSS-B
  • DTSS-B WILL USE INFORMIX AS ITS RELATIONAL
    DATABASE MANAGEMENT SYSTEM
  • ESRI ARC PRODUCTS WILL PROVIDE THE FUTURE
    DEVELOPMENT PLATFORM/ENVIRONMENT
  • THE CAPABILITY TO UPDATE AND/CONFLATE DATA
    BETWEEN ECHELONS WILL BE REQUIRED
  • CIVILIANS (GS OR CONTRACTOR) WILL BE REQUIRED TO
    PROVIDE CONTINUITY
  • THE TGD MUST SUPPORT JOINT OPERATIONS

47
ASSUMPTIONS
  • NEW TECHNOLOGIES IN MAINTAINING DATA TOPOLOGY
    WILL FACILITATE DATA CONFLATION AND UPDATING IN
    THE FUTURE
  • IMAGERY WILL BE AVAILABLE FROM INTELLIGENCE
    SOURCES TO SUPPORT GEOSPATIAL DATA EXTRACTION
  • ROBUST COMMUNICATIONS WILL BE REQUIRED
  • STANDARD DATA FORMAT IMPORT AND EXPORT SOFTWARE
    WILL BE REQUIRED TO SUPPORT LEGACY SYSTEMS (I.E.,
    VPF, RPF, DTED, ETC.)
  • STANDARD SYMBOLIZATION AND RENDERING SOFTWARE
    WILL BE REQUIRED
  • DATABASE MANAGEMENT TRAINING WILL BE REQUIRED
  • ADDITIONAL PERSONNEL WILL BE REQUIRED

48
DATA MODEL CONTENT
FFD/DTOP
  • FFD/DTOP MISSING FEATURES
  • ELEVATION CONTOUR LINES
  • SPOT ELEVATIONS

???
COUNTRY DATABASE
  • COUNTRY DATABASE (CDB) MISSING FEATURES
  • HELIPORT, COMPLEX OUTLINE
  • SHAPE FILES LACK TOPOLOGICAL STRUCTURE

???
UNIQUE
THEATER GEOSPATIAL DATABASE
  • TGD INCLUDES ALL AVAILABLE FEATURE DATA
  • NIMA GEOSPATIAL INTELLIGENCE FEATURE DATA
    (GIFD),
  • SOILS, VEG, LAND CLASS, DTED, CIB
  • THEATER UNIQUE DATA (I.E., B.E. NUMBERS)

!!!
49
CONCEPTUAL DATA MODEL
META DATA
THEATER UNIQUE DATA
COUNTRY DATABASE/GIFD/ VEG/SOILS/FFD/CDB/DTOP/UVMA
P
  • DEFINES THE FRAMEWORK OF FEATURES/ATTRIBUTES
  • REQUIRED FOR ALL OPERATIONAL MISSIONS
  • USE GIFD/VEG/SOIL/LAND CLASS/UVMAP DATA CONTENT
  • SPECIFICATION AS STARTING POINT
  • ADD THEATER/JOINT UNIQUE DATA REQUIREMENTS
  • FEATURE ATTRIBUTE CODING CATOLOG (FACC) WILL BE
  • THE INITIAL STANDARD
  • SHOULD BE APPROVED BY THEATER SUBJECT MATTER
  • EXPERTS (I.E., 215D/81T)

50
PHYSICAL DATA MODEL
DTSS-B PHYSICAL DATA MODEL
TGD PHYSICAL DATA MODEL (FEATURES)
METADATA
GIFD/VEG/SOIL/ LAND CLASS/ UVMAP /GIFD
USARCENT UNIQUE DATA
USAREUR UNIQUE DATA
USARPAC UNIQUE DATA
  • DEFINES THE PHYSICAL DATA STRUCTURE ON THE
  • SYSTEM (I.E., DTSS-B, GIL, GIPL, ETC.)
  • ASSURES INTEROPERABILITY BETWEEN THEATERS/NIMA
  • ADDRESSES THEATER UNIQUE DATA REQUIREMENTS
  • ALLOWS DENSIFICATION OF STANDARD NIMA DATASETS
  • WITH TACTICAL-SCALE VALUE-ADDED DATA
  • SCALEABLE - DATA MODEL CAN BE EXPANDED TO
  • ADDRESS OTHER DATA IN THE FUTURE (I.E.,
    COMMON
  • DATA MODEL FRAMEWORK, ETC..)
  • TOPOLOGICALLY STRUCTURED

51
CONCLUSION
  • THE ARMYS OBJECTIVE FORCE CONCEPT AND NIMAS
    STRATEGIC INTENT AND NSGI CONCEPTS ARE NOT
    POSSIBLE WITHOUT A STANDARDIZED COMPREHENSIVE TGD
    TO CAPTURE CRITICAL VALUE-ADDED DATA
  • ALL COMBATANT COMMANDERS AND THEIR ARMY
    COMPONENT SHOULD ADOPT THE TGD CONCEPT AS AN
    INTERIM SOLUTION UNTIL A MORE PERMANENT SOLUTION
    IS DEVELOPED BY NIMA
  • THE TGD WILL PROVIDE A STANDARD AND SCALEABLE
    DATA STRUCTURE THAT WOULD GREATLY ENHANCE CURRENT
    AND FUTURE CAPABILITIES
  • EXISTING NIMA STANDARD AND QUALIFIED DATASETS
    WOULD FORM THE FOUNDATION OF THE TGD
  • COMMERCIAL-OFF-THE-SHELF SOFTWARE COULD BE USED
    TO PROVIDE THE REQUIRED DATABASE AND PRODUCTION
    MANAGEMENT TOOLS
  • A FULLY FUNCTIONING TGD AND SOFTWARE TOOLS
    COULD BE DEVELOPED ON THE DTSS-B WITHIN ONE YEAR

52
RECOMMENDATION
  • ALL ARMY THEATERS, TEC, USAES AND NIMA SHOULD
    FORM A TEAM TO DEVELOP THE TGD
  • DEVELOP A STANDARD COMPREHENSIVE CONCEPTUAL AND
    PHYSICAL DATA MODEL BASED ON THE NIMA GIFD AS A
    MINIMUM
  • DEVELOP STANDARD METADATA PROFILES AND
    EXTENTIONS
  • TAKE ADVANTAGE OF EXISTING COTS SOFTWARE
    APPLICATIONS (I.E., PLTS, JTX, ETC.)
  • SUBMIT THE TGD CONCEPT TO NIMA AS AN ARMY
    REQUIREMENT WITH SPONSORSHIP FROM EUCOM/PACOM
  • DEVELOP A RAPID PROTOTYPE PROGRAM (ICW
    TEC/NIMA) TO INTEGRATE THE TGD INTO SYSTEM
    ARCHITECTURES (I.E., DTSS, GIL, GIPL, ETC.)
    WITHIN ONE YEAR
  • RECOMMEND NIMA PROVIDE RESOURCES FOR THE
    DEVELOPMENT AND IMPLEMENTATION OF THE TGD (IAW
    STRATEGIC INTENT AND NSGI CONCEPT) ON THE DTSS-B

53
CONTACT INFORMATION
USAREUR Ronald W. Bijeau USAREUR GIS
Officer DSN 370-7202 COM 011-49-(0)6221-57-7
202 NIPRNet Email bijeaur_at_hq.hqusareur.army.mil
SIPRNet Email ronald.bijeau_at_dcsint.hqusareur.a
rmy.smil.mil
54
TGD SOFTWARE ARCHITECTURE
OTHER SYSTEMS
DTSS-B
SIPRNET
PRODUCTION LINE TOOL SET (PLTS)/ JOB TRACKING
EXTENSION (JTX)
ArcGIS
ArcSDE (INFORMIX)
ArcIMS
THEATER GEOSPATIAL DATABASE (INFORMIX)
55
DATABASE MANAGEMENT
  • IMPORT
  • FFD
  • DTOP
  • ITD/VITD
  • VMAP0-2
  • Soils DB
  • Veg DB
  • CDB
  • EXPORT
  • ITD/VITD
  • VMAP0-2
  • UVMAP
  • CDB?
  • UPDATE/EDIT
  • EDIT TGD
  • CONFLATE
  • SYMBOLIZE

Theater Geospatial Database
Database Management Application (i.e., ESRI PLTS)
Database management application supports create,
read, update, delete, symbolization and
finishing of geospatial data in the TGD
56
PRODUCTION MANAGEMENT
  • PC Team
  • Refine user
  • requirements
  • Task/Track
  • Manage
  • resources
  • QC/QA
  • Automated error
  • detection
  • Data error
  • resolution
  • Production staff
  • Focused staff
  • Prioritized work
  • Customer
  • Check Status

Theater Geospatial Database
Web-based Production Management Application (i.e.,
ESRI JTX)
Production management/tracking application is
developed to manage critical production assets in
an information-based business processes
57
NIMA Enterprise Architecture(Near-Term)
FLDB (INTERGRAPH) WORKSPACES
ARC GIS (ESRI) WORKSPACES
Objectives
  • Single Schema Instance
  • Single Architecture
  • Tool Interoperability
  • Standardize across all regions

DE
DCAFE
Capability - Hardcopy TLM - VMap2 - Custom
Products - Analysis
Capability - Hardcopy TLM, Combat
Chart, JOG - ICM - VITD - VMap 0, 1
2 - UVMap - FFD - DNC - Custom
Products - Analysis
Workspace DB
Workspace DB
Schema Translators
SIPRNET JWICS
GIFD
Web Server
Geospatial Intelligence Feature Database
NIMA FACC Profile Data Schema
ARC IMS
58
INTEL/GEO SYSTEMS
A COMMON GEO FEATURE DATA MODEL IS NEEDED
NIMA GIFD/GIDI
STRATEGIC
NIMA NIL
EUCOM GIL
EUCOM IPL
TEC GEO SERVER
OPERATIONAL
USAREUR GIPL
USAREUR DTSS-B/D
TGD
VCORPS GIPL
VCORPS DTSS-H/L/D
TACTICAL
DIV DTSS-H/L/D
DIV GIPL
BDE DTSS-D
FEATURES ARE THE FUTURE...
59
FACTS
Maintaining a topographic database is a critical
function of all topographic operations (refer to
Appendix D). Database development and management
is a high-priority mission for all topographic
units within the theater. GI databases include
old data, new data, accurate data, qualified
data, and multiformatted hard-copy and digital
data. The analyst and the commander must
understand the limitations, accuracy, and
intended uses of the GI database. Database
management includes the acquisition,
manipulation, formatting, storage, and
distribution of all hard-copy and digital data
and products (FM 3-34.230, para. 3-88.,
Topographic Operations) 1 of 3
60
FACTS
  • DTSS-B will be fielded to theaters (29th Eng Bn,
    30th Eng Bn and 60th Eng Det) in FY03
  • Data creation/management is an important theater
    mission (IAW 3-34.230)
  • Data creation and management tactics, techniques
    and procedures will be required
  • Civilians (DAC or contractor) will be required to
    provide continuity
  • ESRI Arc products will provide the development
    platform/environment
  • 2 of 3

61
FACTS
  • Commercial Joint Mapping Tool Kit (C/JMTK) will
    also use ESRI/ERDAS products
  • DTSS-B will use Informix as its relational
    database management system
  • Robust communications will be required
  • Training will be required
  • The TGD must support a Joint Task Force
  • Standard symbolization and rendering software
    will be required
  • 3 of 3

62
ASSUMPTIONS
  • New technologies in maintaining data topology
    will facilitate data conflation and updating in
    the future
  • Standard data format export software will be
    required (i.e., VPF, RPF, DTED, etc.)
  • DTSS-B provides the required tools for NIMA data
    set creation and management
  • Imagery will be available from intelligence
    sources to support data extraction
  • A strategy for synchronizing/conflating data
    between echelons will be required

63
BENEFITS OF TGD
  • Critical to transformation to data-centric
    operations
  • Externalizes relevant data from NIMA (i.e.,
    GIFD/ERM)
  • Provides effective terrain and intelligence
    analysis support to IPB/EBA process
  • ESRI geodatabase stores topology and supports
    Cross-theme topologic searches
  • Vector data support to future systems (i.e.,
    FCS)
  • Standardizes and enforces data-centric TTPs
  • User-friendly web-enabled interface via SIPRNET
  • More efficient bandwidth usage than raster data
  • Promotes data accuracy and integrity
  • Increased data visibility via standardized
    metadata
  • End-user on-line help capability
  • Leverage development efforts by other agencies

64
OPERATIONAL CONCEPT
IMAGE PROCESSING
DATA EXTRACTION
DATA FINISHING
REPRODUCTION DISTRIBUTION
OUTPUT MEDIA/FORMAT
PLANNING AND CONTROL
  • Project Analysis
  • Resource
  • Allocation and
  • Analysis
  • Data Source Anal
  • Tasking Info.
  • Priorities/Sched.
  • Metadata Editing
  • QC/QA
  • Tasking Info/
  • Priorities/Sched.
  • Track Resources
  • Data import
  • Orthorectifying
  • Mosaicing
  • Image data
  • Acquisition
  • (i.e., WARP and
  • DataMaster)
  • DEM creation
  • Metadata Editing
  • QC/QA
  • Tasking Info/
  • Priorities/Sched.
  • Track Resources
  • Data Acquisition
  • Metadata Editing
  • QC/QA
  • - Tasking Info/
  • Priorities/Sched.
  • Track Resources
  • Symbolization and
  • Map Composition
  • Color Separation
  • Output Formatting
  • Data Acquisition
  • Metadata Editing
  • QC/QA
  • Tasking Info/
  • Priorities/Sched.
  • Track Resources
  • Data Import
  • Feature/Attribute
  • Editing
  • Terrain Data
  • Data Acquisition
  • Metadata Editing
  • QC/QA

CDROM DVD Web Paper Etc.
DEPLOYED PROCESSES
Terrain Teams
Survey Teams
GIS Customers
WEB DESIGN/MANAGEMENT
DATABASE MANAGEMENT/SYSTEM ADMINISTRATION
USAES DOCTRINAL FUNCTIONS
- Data Representation
- Data Acquisition
- Data Management
- Data Exploitation
- Data Dissemination
65
Geospatial Enterprise Architecture
DoD C4ISR Views within the Zachman Framework
(Moved the Why to the left)
66
TGD Interoperability
COMMERCIAL JOINT MAPPING TOOL KIT (C/JMTK)
PROVIDES INTEROPERABILITY
Central Region
Caucuses
N. Africa
Balkans
Levant
NAVTECH
Metadata
Job Tracking
DTSS
CJMTK DTSS-B
TEC
  • - Digital Topographic Support System (DTSS)
  • Geospatial Intelligence Feature Database (GIFD)
  • Image Product Library (IPL)

67
EAC Personnel Plan
Past
Current
Transformation
Future
MTOE 08 (TA Team 00)
MTOE 08 (TA Team 00)
MTOE 08 (TA Team 01)
MTOE (FDU) 28 (TA Team 01)
TDA 07
TDA 08
TDA 08
TDA 08
Contractors 08 (1.1M)
Contractors 09-15 (UFR 6) (1.3-1.9M)
Contractors 15 (2.7M)
Contractors 15 (2.8M)
Totals USAREUR/Doctrinal
(Percent of Doctrinal Force Structure) 23/121
(19) 25-31/121 (21-26)
31/121 (26) 51/168 (30)
  • No TGD
  • No MTOE TA Team
  • No EAC Company
  • Start Contracts
  • TGD IOC
  • No MTOE TA Team
  • No EAC Company
  • Add Contractors
  • TGD FOC
  • Build MTOE TA Team
  • No EAC Company
  • Add Contractors
  • Maintain TDA
  • TGD (Expand for FCS)
  • FDU GPC w/TA Team
  • No EAC Company
  • Keep Contractors
  • Maintain TDA

FY02 FY04
FY06 FY08
Includes EAC Company and PC Detachment, but
not the Topographic Battalion Includes FDU
ASCC Company and Geospatial Theater Army Team
68
EAC Equipment Plan
Past
Current
Transformation
Future
Fielded TIP/TIES DTSS-D (1) SkyMedia
Fielded DTSS-B (1) DTSS-D SkyMedia
Fielded DTSS-B DTSS-D SkyMedia
Fielded DTSS-B DTSS-D (1) SkyMedia
Non-Fielded Server (1) 7Tb Disk Array (1) PC
W/S (6) DVD Jukebox (2) CD/DVD Dup (1) Plotters
(6) Taclane Crypto (2)
Non-Fielded Server Backup (1) Storage Backup
(1) PC W/S (6) Paper Cutter (1) 2-sided Printer
(1) SIPR Upgrade (1) LAN Upgrade (1)
Non-Fielded Server LCR (2) Storage LCR (1) PC
LCR (6) CD/DVD LCR (2) Plotter LCR 6) Crypto LCR
(2) GBS Suite? Pocket PCs
Non-Fielded Server Upgrd (1) Storage Upgrd
(1) PC LCR (6) Paper Cutter LCR Printer LCR
(1) SIPRNet LCR LAN LCR
USAREUR Total Equipment
Cost 470K 18th 300K/G2
300K 400K
300K
  • No DTSS-B (TGD)
  • New Server
  • New PC-based
  • Limited Output
  • Limited Comms
  • Sun-based W/S
  • DTSS-B/TGD (FOC)
  • Reconfig Server
  • PC-based W/S
  • Improved Output
  • SIPR Upgrade (OC12)
  • LAN Upgrade (GIG-E)
  • DTSS-B/TGD (P3I)
  • Life Cycle Replacemt
  • Deployable Comms
  • Handheld PCs
  • DTSS-B/TGD (P3I)
  • Server/Storage Upgrd
  • PM/CTIS programmed
  • Life Cycle Replacmnt
  • (LCR) too late

FY02 FY04
FY06 FY08
69
EAC Software Plan
Past
Current
Transformation
Future
Fielded Solaris WinNT/2000 ArcInfo ERDAS SocetSet
Fielded ArcGIS ArcSDE ArcIMS Informix
Fielded ArcGIS ERDAS SQL Server
Fielded Win XP ArcGIS ERDAS
Non-Fielded Win 2000 Mr. Sid ZEH RIP MET
Non-Fielded TGD Development - PLTS -
JTX - PS Tracker - SQL Sever DataMaster WinI
IS/Apache
Non-Fielded Feature Analyst (8) DB
Synchronizing Windows (64 bit)
Non-Fielded SDS-FIE Interface Mod/Sim
Interface
USAREUR
Total Software/Development Cost 70K
18th 650K/G2 150K
300K 300K
  • No DTSS-B (TGD)
  • New Server
  • New PC-based
  • Software Maint
  • TGD FOC
  • Reconfig Server
  • Improved Output
  • SIPR/LAN Upgrade
  • Windows Upgrade
  • Eng Toolkit integration
  • TGD Virtual Network
  • NGA Interoperability
  • Advanced Terrain Vis
  • Data Interoperability
  • - 7th ATC Mod/Sim
  • - IMA-E (SDS-FIE)

FY02 FY04
FY06 FY08
70
USAREUR TGD Personnel
18th ENGINEER BRIGADE (TA)
CH, GIS BRANCH
GEOSPATIAL ARCHITECTURE
GEOSPATIAL TEAM, SETAF Mr. Bijeau, DAC
Mr. Yaryan SPAWAR Ms. Frick, NGIT
Mr. Bonnette, NGIT (Sep 04)
60th ENGINEER DETACHMENT (PC)
PRODUCTION MANAGEMENT (PC)
IMAGE PROCESSING
DATA EXTRACTION
DATA FINISHING
REPRODUCTION/ DISTRIBUTION
  • Mr. Finney, DAC
  • Cartographer, DAC
  • CW2 Cossell, 215D
  • SFC Heitkamp, 21S
  • SSG Dela Rosa, 21S
  • Cartographer, DAC
  • Mr. Wright, DAC
  • SGT Adams, 21U
  • PFC Rhodes, 21U
  • SPC Gobble, 21U
  • SPC Plicka/Behnken
  • Mr. Livingood, NGIT
  • Mr. Ryska, NGIT
  • Vacant, NGIT
  • - Mr. Walker, DAC
  • SFC Bonnette/Ali, 21U
  • PFC Rhodes, 21U
  • Ms. McVicker, NGIT
  • Mr. Albiez, IC-05

INFORMATION TECHNOLOGY
WEB DESIGN/SYSTEM ADMINISTRATION
DATABASE MANAGEMENT/ADMINISTRATION Mr.
Cornell, DAC Cartographer,
DAC Mr. Strahan, EDS
Write a Comment
User Comments (0)
About PowerShow.com