RPC production at GT (status and plans) Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements currently ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 12
Provided by: slacStanf4
Category:
Tags: rpc | plans | production | status

less

Transcript and Presenter's Notes

Title: RPC production at GT (status and plans)


1
RPC production at GT (status and plans)
2
Status
  • After the IFR meeting in Rome a new version of
    the Production Plan have been proposed to GT
  • Main requirements currently included in the P.P.
    are
  • Improvements of the infrastructure at GT
  • Improvements of the oiling process (new)
  • QA/QC procedures and tests during processing
  • pre-production test

3
Status (cont.)
  • Infrastructure at GT
  • Assembly shed
  • GT have modified the shed where bakelite plates
    are prepared and assembled to ensure an higher
    level of cleanness.
  • The assembly area have been isolated from the
    outside by means of a sliding door and a
    controlled entrance have been installed out of
    the shed.
  • All products used in this area will be
    controlled and certified (chemical, cloth, tools
    etc..)
  • All workers in this area must have clean and
    standard dress plus must wear gloves and hat
  • Test station area
  • almost ready. All the infrastructures needed
    for the cosmic ray test are in place.

4
Status (cont.)
  • Oiling system
  • the new method foresee a magnetic drive gear
    pump to force the oil-eptane mixture through a
    5µm nylon filter before entering the gap volume.
    The filling time is controlled by varying the
    pump speed while the emptying is controlled by
    the time to bring the oil tank from the ceiling
    to the floor level.
  • The Pump waiting for an offer . The main
    difficulty is to find a vendor which have the
    pump in stock.
  • Best offer at the moment is a Verden-maag inox
    pump that could be sent at GT the for the end of
    July
  • Compatibility between lineseed oil and eptane
    with the Nylon filter must be checked too.

5
Status - The corner pieces
  • Since the Rome Meeting it have been decided also
    to start to design and make a Corner Piece to
    avoid drilling the gap to insert the gas-inlet
  • 30 corner pieces have been designed an produced
    (by machining) in Rome.
  • Molded pieces (H.B. design) in production
  • Molded pieces (C.G. design) ready to start the
    production

6
Machined Corner pieces
  • 45 degree only
  • Simple design of the piece (no guard ring)
  • 1.7mm thick , 4mm wide slot
  • Will be used to build five test gaps (FL02X
    shape)

7
Test -Gap w/corner pieces
  • These five gaps will be used to test
  • gap assembly procedure with the Corner Pieces
  • effects of different polymerization times (2-3-4
    days)
  • oil flow throughout the new gas inlet
  • gap cleaning procedures (before oiling) with
    eptane
  • electrical behavior of the Corner Pieces. (HV
    test)
  • In production now. Ready for testing and
    inspection next week

8
Other Test -Gap w/o corner pieces
  • two rectangular gaps with new cylindrical spacers
    (without the guard ring) to test oil flow and
    stanch around the spacers
  • Gap1 (1000x2000 mm2) 3 alternate (standard/
    cylindrical/ smoothed cylindrical) spacers rows.
    To be opened for inspection
  • Gap2 (500x500mm2) cylindrical spacers to test
    currents
  • In production now. Ready for testing and
    inspection next week

9
Near future plan
  • 220 backelite plates are already at GT but
    production cannot start until the new oiling
    system have been installed and tested
  • Current estimation is the end of July
  • June-July activities
  • Complete the test on the gaps w and w/o the
    corner pieces (done in the next two weeks)
  • Make and test few gaps with the H.B. molded
    corner pieces as soon as they are at GT
  • Go ahead with the C.G. molded corner pieces to be
    used as backup solution if HB pieces fails

10
Near future plan
  • Two scenarios possible depending on the results
    of the test we are going to do in June/July
  • H.B. molded pieces works fine (known by the
    middle of July) official pre-production can
    start the first week of August.
  • H.B. molded pieces fails the test. C.G. pieces
    are ready for the end of July official
    pre-production can start, after testing the new
    pieces, the last week of August (after the 2
    weeks August stop of GT)

11
Construction schedule
  • The duration of the construction is tied up to
    the time needed to test the chambers with cosmics
    (roughly 10 w.d./10 chambers, including unloading
    and re-loading the test stand, gas conditioning,
    data taking and analysis)
  • 100 chambers 100 w.d.
  • By starting in August up to 4 bunch of 12
    envelopes each could be sent at SLAC before
    Christmas .
  • The last delivery to SLAC could be done (120
    chambers total) around the end of March