FIFO sum, look out Pharmacy Lean we come - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

FIFO sum, look out Pharmacy Lean we come

Description:

FIFO sum, look out Pharmacy Lean we come Jane Maloy Chief Technician Northampton General Hospital Workshop/ Presentation What is Lean Game 1 be careful you don t ... – PowerPoint PPT presentation

Number of Views:101
Avg rating:3.0/5.0
Slides: 32
Provided by: derbyAcU8
Category:
Tags: fifo | come | lean | look | out | pharmacy | sum

less

Transcript and Presenter's Notes

Title: FIFO sum, look out Pharmacy Lean we come


1
FIFO sum, look out Pharmacy Lean we come
  • Jane Maloy
  • Chief Technician
  • Northampton General Hospital

2
Workshop/ Presentation
  • What is Lean
  • Game 1 be careful you dont get wet!!
  • Lean Principles
  • WORMPIT
  • Game 2
  • 5S
  • Lean at NGH

3
A place for everything and everything in its
place
4
WHAT IS LEAN
  • Lean is simply a philosophy designed to help
    organisations systematically identify and
    eliminate activities and processes that are
    preventing them from being effective.
  • Structured common sense

5
History of Lean
  • Lean started over 200 years ago
  • Toyota Production System (TPS) - Toyotas Chief
    Production Engineer, Taiichi Ohno.
  • Reviewed what the company was doing and found
    that much of it was not adding value to the
    customer.

6
Using a mechanical example
7
Built ins
8
Game 1/ Simulation
  • Customer asks for three full cups of water
  • Cups 1 3 added every 15 seconds.
  • Time how long it takes
  • Was the order fulfilled? Any spillage?
  • How long did it take?
  • Where are the bottle necks?
  • How can you improve the process?

9
The 5 Lean Principles
  • Value understand what your customer values
  • Value stream - understand how you currently
    deliver value to your customer
  • Flow eliminate bottle necks and constraints so
    that the value can flow
  • Pull keep the process flowing by triggering
    activity only on demand
  • Perfection drive for continuous improvement

10
The Hierarchy of Improvement
  • Eliminate the Non Value Adding activity by
    getting rid of it completely.
  • If you cant eliminate it Reduce the size or
    impact of the Non Value Adding activity.
  • If you cant reduce it, can you Combine it with
    another activity.

11
WORMPIT/ WASTE
  • Waiting waiting for things to start or arrive
  • Over-Processing (or overproduction) this is
    doing more activity than is required or making
    more items than can be sold.
  • Rework also known as correction, this is about
    repeating activities because of a problem.
  • Motion ( transport) motion is the movement of
    humans and transport the movement of things
  • Processing waste this is about doing things that
    do not need to be done.
  • Inventory stacking information, materials or
    patients.
  • Talent misusing the skills of individuals or
    teams.

12
Key Lean Tools Concepts
  • 5S is a tool designed to create a Visual
    Workplace.
  • A place where things are organised logically.
  • 5S originally came from 5 Japanese words that
    began with a sound similar to S in English.

13
Game 2 /Simulation
  • 5S Game
  • Follow the instructions given.
  • You must not look at the sheets until instructed
    and must finish when time is up.

14
5S
  • Sort remove unwanted items from the area to
    reduce clutter.
  • Set set what remains in order and give each
    item a marked home location
  • Shine keep the area clean and return items to
    their home location at the end of shifts etc.

15
  • Standardise define the responsibilities of
    Teams and Managers in maintaining standards.
  • Sustain audit and improve the area
  • 1 Safety !!!!!!!!!!

16
Lean at NGH
  • Staff attended simulation
  • Worked with Service Improvement Team
  • Identified area that needed improving.
  • Dispensing turnaround times from receipt of
    prescription to completing of checking.
  • Gathered and recorded data before making any
    changes.
  • Quick fixes

17
  • Current process mapping
  • Identified key dispensary staff to work with SI
    team.
  • Planning and Ideal process mapping
  • FIFO
  • Rapid Improvement Event (RIE)
  • Continue data recording one week every six
    months and one day every month.

18
(No Transcript)
19
This area was 5Sd on 17th December 2008 Please
keep it clean and tidy so that everyone can enjoy
it.
After
Before
20
Ideal Process Mapping
21
Layout of Ideal Process
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
Dispensary Before
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
Achievements
  • Two Pharmacy staff completed the Improvement
    Practitioners Programme
  • Two Pharmacy staff took part in the Lean
    Associates programme.
  • Further Lean improvement in Stores and ASU.

30
What now??
  • Lean simulation sessions still being held in the
    Trust and staff encouraged to attend.
  • Lean in Stores
  • Milk run
  • Enlarging ASU chemo support room lean
    principles being applied to ensure efficient flow
    of work.
  • Installation of Pharmacy Tracker ensure it adds
    value to the customer.
  • Ongoing Action Plan..

31
Acknowledgements
  • NGH Service Improvement Team
  • Chris Albone Service Improvement Manager (for
    keeping us all focused).
  • All Pharmacy staff.
Write a Comment
User Comments (0)
About PowerShow.com