Title: FISCHER PORTER REBUILD
1FISCHER PORTER REBUILD
HPD THE NEXT GENERATION
2SUTRON MANUAL
SOLAR PANEL MOUNT
BATTERY
PRECIP RECORDER
SD CARD
SOLAR PANEL
TOOLS MISC.
LOAD CELL
3BASEPLATE (BOTTOM)
SHIPPING SCREW
DASHPOT/ LOADCELL MOUNTING
4LOAD CELL MOUNTED
FRONT OF BASE
5LOOSEN SET SCREWS TO INSERT SCREWS FOR LOAD CELL
SCREW
6ALLEN HEAD SCREWS
7FRONT VIEW OF LOAD CELL
8SIDE VIEW OF LOAD CELL
9LOAD CELL PLUNGER MOUNTED
10PLUNGER
LOADCELL
11PLUNGER CENTERED
12ADJUSTING SCREWS (4)
13PRECIP RECORDER MOUNTED
GROUND ATTACHED
BATTERY CABLE
14PRECIP RECORDER MOUNTING SCREWS
15ENSURE CLEARANCE
16ATTACH LOADCELL CABLE
17CHECK BATTERY VOLTAGE - 12.5V
18INSIDE PRECIP RECORDER
BATTERY CABLE
NOT USED
SOLAR PANEL CABLE
19CHECK VOLTAGE FOR BATTERY
BATTERY CABLE
20SOLAR PANEL CONNECTIONS
CHECK VOLTAGE
WIRE TO SOLAR PANEL
21(No Transcript)
22COMPUTER CONNECTION
GROUND
LOAD CELL
SOLAR PANEL
BATTERY
23SOLAR PANEL MOUNT
24(No Transcript)
25(No Transcript)
26SD CARD ACCESS
27COMPUTER ACCESS
28DOWNLOAD TO SD CARD
INSERT CARD
29PRESS SET TO SELECT LAST OF DAYS
30DEFAULT 60 DAYS PRESS SET
31DOWNLOAD COMPLETE REMOVE CARD
32CALIBRATION CHECK 1) REMOVE HOOD 2) PLACE BAR ON
BUCKET
3) LET READING STABILZE READ 4) PLACE 5 INCH
WEIGHT, LET READING STABILZE 5) DIFFERENCE
IN READINGS SHOULD BE 5.0 (/- 0.2)