Gateway to a Modern Logistics Hub - PowerPoint PPT Presentation

1 / 34
About This Presentation
Title:

Gateway to a Modern Logistics Hub

Description:

Gateway to a Modern Logistics Hub * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * State of the Art CFS facility To re-define logistics solutions – PowerPoint PPT presentation

Number of Views:720
Avg rating:3.0/5.0
Slides: 35
Provided by: chennaicu
Category:

less

Transcript and Presenter's Notes

Title: Gateway to a Modern Logistics Hub


1
Gateway to a Modern Logistics Hub
2
German Express Shipping Agencys
State of the Art CFS facility To re-define
logistics solutions

3
Located 25 kms north of the Chennai Container
Terminal close to Ennore Port in the Hamlet of
Minjur on the Ponneri Highway
4
Overview of all CFS in Chennai
5
An Infrastructure with incomparable facilities
Efficient and trouble free operations.
Designed to deliver the best to our customer.
6
Container Yard
  • 40,000 Sq.mts of Open Container Yard dedicated
    for Container Storage.
  • Adequate area for Truck / Trailer movement.
  • The Yard area has a clear signage for easy
    location of containers .
  • Dedicated area for Reefer containers with
    adequate plug points.

7
Container Yard
  • Container yard clearly marked for easy location
    of containers thereby avoiding delays.
  • Location of container can be tracked through the
    kiosk, which is updated with live information.

8
Covered Warehouse
10,000 Sq.mts of Warehouse area
Roofing made with Colour Coated Galvalume Coils,
first of its kind among the CFSs in Chennai ,
which is devoid of the conventional trusses.
9
Covered Warehouse
Bonded Warehouse 2,500 Sq. mts dedicated for
customs bonded cargo.
Security enhanced by dedicated CCTV cameras with
movement detection facility to record intrusions.
10
Covered Warehouse
2,500 Sq. mts of Warehouse area used for Garments
and other clean cargoes. Major player like APL -
Logistics are one of our satisfied customers.
ltlt Conveyor belt system being used, for a
speedy and effective operation.
11
Covered Warehouse
ltlt Dock levelers at vantage points for smooth
Fork Lift Operations.
Docks on both sides of the warehouse, exclusively
earmarked as Cargo dock and Container dock gtgt
12
Covered Warehouse
ltlt Import LCL warehouse of 2, 500 Sq. meters
Also includes a separate enclosure to store High
value cargoes gt gt
13
Project Cargo Handling
Trained personnel to handle Project and over
dimensional cargo, Well supported by adequate
infrastructure.
14
Service centre
Service Centre at the Admin Block houses the EDI
, Documentation and Common Business Centre.
Centrally Air-conditioned Admin Building with
separate blocks for CFS Users and CFS Customs.
15
Service centre
Centrally Air-conditioned Admin Building with
separate blocks for CFS Users and CFS Customs.
  • Work stations for CHAs
  • Business centre for all communication needs
  • Touch screen Kiosks
  • GESA CFS Container/ Cargo information
  • Custom house document information

16
Customs Block
  • cabin for visiting customs officials
  • Additional waiting area for CHAs

17
Fire Fighting
Fire pump feeds and maintains High pressure in
the fire main, around the CFS and warehouse to
deal with Emergency gtgt

ltlt 2 x 75 hp Pump sets, which delivers a
minimum water pressure 7 Kg/cm2 at all Hydrants.
Adequate fire fighting measures are incorporated,
by providing a separate Fire safe Room for
storing hazardous and inflammable cargo
gtgt
18
Site Security
Entire CFS campus is secured with 10 feet
high Compound wall and additional 3 feet high
Power Energized Fencing.
The CFS is well lit with 8 High Mast Towers to
ensure adequate lighting for 24 hour operations
and security.
19
Site Security
Closed Circuit Cameras have been installed
externally and internally to prevent any
unauthorized entry and pilferage.
  • 24 x 7 Security vigilance and surveillance.
  • 6 cameras covering the entire periphery.

20
Value Additions
Separate Entry / Exit gates to avoid bottle
necks at the Gates during peak time.
Round the clock Survey facility available for all
Gate-In / Gate- Out / Warehouse / Yard Operations
with respect to Cargo / Containers.
21
Value Additions
Separate Rest Room for visiting Truck / Trailer
drivers and cleaners
22
Value Additions
State of the art Canteen facility to provide
high quality food prepared in hygienic
conditions.
23
Value Additions
Canteen - Dining area for CHAs and others
24
Value Additions
Beautiful and scenic Campus with greenery and
aesthetically designed landscape.
25
Value Additions
Campus incorporates a well facilitated Training
centre.
TRAINING CENTRE
Continuous training and updating keeps our staff
well informed with the latest development in the
trade and industry.
26
Value Additions
Dedicated parking area, to avoid traffic
bottlenecks at the Service road.
27
Value Additions
Battery operated vehicles, for ease of movement
inside the CFS
28
Trailer Facility
  • Own fleet of trailers to expedite PNR movements.
  • Triple axle trailers with heavy duty jeep for
    high load bearing capacity.

29
Empty Yard
Empty yard for storing Empty Containers of
all Liners with sufficient mechanical equipments
for handling. Proximity to CFS for easy and
efficient movement of containers.
30
Salient Features
  • The CFS is supported with 80-ton capacity
    Electronic Weigh bridge.
  • Entire CFS campus paved with blocks and
    asphalted roads, with pedestrian walking area
    marked for safety within the CFS .
  • Exclusive areas earmarked for Scrap and Rough
    Granite blocks.
  • The entire flow of Operations are System driven,
    System maintained and System dependant.

31
Salient Features
  • Necessary infrastructure to handle import LCL
    cargo for Chennai.
  • Magnets available for Handling steel scrap.
  • The Power supply to CFS is backed
  • up with 400 KVA Generator, which
  • supports 100 requirement of
  • the CFS.
  • Repairs and Maintenance of containers as per
    IICL and UCIRC standards.
  • Facility to fabricate GOH containers to suit
    customers needs.

32
OUR PROFILE IN A BRIEF
  • CFS developed area 18 Acers
  • Paved container yard area of 32,000 Sq. meter
  • 10,000 Sq. meter of covered warehouse
  • 2 Nos of 40 Ton capacity Reach stackers
  • 2 Nos of 14 Ton Hydra cranes
  • 5 Nos Diesel operated and 2 Nos Battery operated
    Fork Lifts
  • 10 Nos of Triple axle trailers
  • 80 Ton electronic weight bridge
  • Empty container yard developed in a area of 7.5
    acers
  • Back up power with, 400 KVA Genset
  • Last but not the least, a team of highly talented
    and enthusiastic professionals.

33
The Single most important thing to remember
about any enterprise is that there are no
results inside its walls The Result of
a business is a SATISFIED CUSTOMER
34
Thank You
Write a Comment
User Comments (0)
About PowerShow.com