Title: TLM Implementation-PEO


1
Using PowerLOG-J for Two Level Maintenance
(TLM) and Logistics Management Information (LMI)
System for TACOM LCMC Managed Equipment
Bill Fuller, C.P.L. Camber Corporation 15 May
2007
2
Agenda
  • TLM / LMI Overview
  • Techniques
  • Summary

3
Purpose of TACOM LCMC TLM/LMI Project
  • Establish a Standardized LMI System that supports
    TLM implementation
  • Establish a uniform process within TACOM LCMC for
    developing Logistics Products
  • Integrate with CCSS
  • MAC
  • MARC
  • BOIPFD
  • RPSTL
  • Two Level Technical Publications
  • Train the TACOM LCMC Practitioners
  • Align with DA TLM Initiatives

Establish Sustain a Seamless LMI System
4
Some of the Challenges
  • Integrate existing logistics data from multiple
    independent sources into an LMI System
  • PMR
  • Technical Manuals
  • Task Frequency
  • Document Processes to Sustain the LMI system

It Hasnt Been Done Before
5
TLM / LMI Program Overview
Develop TLM Processes and Procedures
Sustain System
Update System
Recom-mend Systems
Identify Available Systems
Identify Data Require-ments
Select System
Stand Up System
PowerLOG-J Selected
Update Logistics Support Package
Update LMI Baseline to TLM
Establish LMI Baseline
Documented Detailed Processes Essential
6
TLM/LMI Process
  • TLM Checklist
  • Previous TLM Migration Panel Results (if
    available)
  • End Item Density Within South West Asia (SWA) (To
    Be Further Defined)
  • End Item Usage Within SWA (To Be Further Defined)
  • Average Monthly Demand History Within SWA (To Be
    Further Defined)
  • LMI Task Files (if available)
  • LMI Parts Files (CCSS Provisioning Master Record)
  • Fielded Version of Technical Manuals
  • Logistics Engineering "Hold-Files" (Logistics
    Package update To-Do-List)
  • Manpower Requirements Criteria (MARC) Data
  • Basis of Issue Plan Feeder Data (if available)
  • Objective Tables of Organization/Common Table of
    Allowances
  • Technical Data Package (TDP)

UPDATE LMI BASELINE TO TLM
UPDATE LOGISTICS SUPPORT PACKAGE
ESTABLISH LMI BASELINE
  • Create Task List
  • Create LMI Task Files
  • Identify Discrepancies
  • Correct Discrepancies
  • Update Task Files and PPL IAW Latest
    Implementing Guidance for Maintenance and Supply

Update of Logistics Support Packages Will be
Based on an Agreed-Upon Strategy
7
Test the Processes with Pilots
  • Heavy Combat PSID Armored Vehicle Launched
    Bridge (AVLB)
  • Tactical Vehicle PSID Semitrailer, 70T, M1000,
    ASV
  • Deploy PSID 4K Fork Lift
  • Weapons PSID Rifle, 5.56MM M4
  • Field Artillery PSID Howitzer Medium Self
    Propelled M109A6
  • Tools PSID Forward Repair System (FRS)
  • Chem/Bio Defense PSID M58 Smoke Generator
  • Light Combat PSID Fire SPT TM Vehicle BFIST
  • Soldier PSID Containerized Field Kitchen

8
Pilots In Progress
  • Pilot projects are nearing the Initial Baseline
    completed milestone
  • Every Pilot LIN has been different in some aspect
    affecting KEY data elements such as PCCN, PLISN,
    LCN, FGC in a fundamental manner
  • Many PCCNs contain multiple LINs with and/or
    without PCCN
  • Every LIN has displayed some or all of the seven
    deadly sins

Pilot LMIS Are Expected to be Complete in Late
June
9
LMI System Government Sustained
  • TACOM LCMC Network
  • Two Environments
  • Development
  • Production
  • 500 GB Expandable
  • TACOM LCMC Portal
  • Ad Hoc Team Environment
  • Share Point

Information Will Be Government Owned
10
Logistics Product Update Issues
  • CCSS and PowerLOG-J synchronization
  • Recurring PTD Cycles
  • RPSTLs
  • CCSS or PowerLOG-J
  • Technical Publications
  • EMS Next Gen

Seamless Integration
11
Update Logistics Support Packages
Packaging (LSAR-025)
Facilities (LSAR-012)
Update PPL (LSAR-036)
Update MAC (LSAR- 004)
LMI SYSTEMPowerLOG-J
Update RPSTL (LSAR-030)
Report to Update BOIP
Report To Update MARC (LSAR- 001)
ETM/IETM NMWR Manuals (Update)
12
Some Techniques
  • Data Cleansing
  • Army Edits
  • Batch Load Templates
  • EZ MAC
  • Dealing with Legacy Problems

13
Data Cleansing Process
14
Army Edits
15
Import Tabular
16
Flexible CSV Data Import Templates
17
THE EZ-MAC Generating an 004 Report
(Maintenance Allocation Chart) with the EZ-MAC
Application.
18
EZ-MAC PROCESS
Quality Review
Quality Review
INPUTS
PowerLOG-J v1.5.1 loaded on the C\ Drive and/or
Server EZ-MAC application loaded on the C\Drive
and/or Server Current MAC (either in print or
electronic)
ENTER DATA to the 3 EZ-MAC worksheets
(ezmac_ground.xls)
IMPORT A MAC 2361 to Power-LOG-J
REVIEW the MAC
EXPORT DATA to an .xml file
RUN the MAC
COPY the templates to the LIN MAC Folder
ERRORS
REVISE the ezmac_ground.xls
NO ERRORS
RENAME REPORTS AND PLACE IN FILE
19
EZ-MAC PROCESS Inputs
PowerLOG-J v1.5.1 loaded on your C\ Drive or
server. EZ-MAC does not work on any lower
version.
A printed or electronic copy of your MAC.
EZ MAC loaded on your C\Drive or server. EZ MAC
has two files ez-mac_ground.xls and mac2.xsl
that you will need to copy and paste into your
LIN folder.
20
EZ-MAC PROCESS Enter the Data
THE EZ-MAC TEMPLATE Three Worksheets mac,
tools, and remarks
21
EZ-MAC PROCESS Enter the Data
THE EZ-MAC TEMPLATE The MAC Worksheet
DO NOT rename the file.
2-digit Group Code heading. Will list as an
error when importing. Ignore the error message
code will still import.
Formatting Example 0100 FGC has 3 separate
task headings Engine Assembly, Engine Mounts,
and Lifting Brackets. Within the Engine Mounts
and Lifting Brackets categories, several task
lines appear. Note how the sequencing (-xx) and
the Component/ Assembly column is input.
Enter times un- der the appro-priate mainte-nance
level.
Enter the Function language accepted, per MIL STD
40051.
22
EZ-MAC PROCESS Enter the Data
THE EZ-MAC TEMPLATE The TOOLS Worksheet
If more than 13 digits, the NSN will error out.
Cells cannot be blank in this column Use zeros
as the default placeholder for missing NSNs.
Do not wrap text in the Nomenclature column (Do
not reformat any of the columns on any of the
sheets.)
23
EZ-MAC PROCESS Enter the Data
THE EZ-MAC TEMPLATE The REMARKS Worksheet
24
EZ-MAC PROCESS Export the Data
  • Select Export MACWP
  • Select the Work Package Maintenance Level (as of
    this publication, select anything, per LOGSA
    result will be the same).
  • Enter your Publication , per the instruction.
  • Note the location of your file, read the Notes
    Limitations, and click Okay.
  • Close the Excel file. You will get no notice
    that the file has exported.

25
EZ-MAC PROCESS Import the MAC
Select Import 2361 MAC and open the file.
26
EZ-MAC PROCESS Import the MAC into PowerLOG-J
  • An .html Error Report will open. The errors are
    grouped according to subject, and the Table of
    Contents displays hyperlinks to the groups.
  • Some common errors are listed here.
  • When you close the file, the files saves to the
    location of your MAC report
  • Correct your errors, either record-by-record
    within PowerLOG-J or in the EZ-MAC Excel file and
    import again (recommended)..

27
EZ-MAC PROCESS Run the MAC
  • Select Reports Technical Manual 004
    Maintenance Allocation Chart from the menu.

28
EZ-MAC PROCESS MAC (.html)
29
EZ-MAC PROCESS MAC (.pdf)
30
PowerLOG-J, TLM, LMI and Legacies
  • MAC conforms to Mil-Std-40051 and is now based
    on task details in LMI System
  • Functional Group Codes vs LCN structure for RPSTL
  • Multiple PCCN/LIN combinations in single PMR
  • Multiple use items
  • Field and Sustainment SMR Codes in CCSS

31
Summary
  • Provide a Standardized LMI System to Support Fact
    Based Logistics Decisions
  • Provide Processes To Assist in Conversion of
    Logistics Support Packages to TLM
  • Establish LMI System in TACOM LCMC Network
    available to all Equipment Managers
  • Seamless Integration to Logistics Support
    Packages

Realizing the Dream of ILS
32
TACOM LCMC TLM LMI Contacts
  • Steve Matthews, COR
  • TACOM LCMC ILSC Policies
  • (586) 574-7741
  • DSN 786-7741
  • steven.a.matthews_at_us.army.mi
  • Bill Fuller, Contract PM
  • Camber Corporation
  • (586) 795-5349
  • wfuller_at_camber.com

33
Questions?
34
Back-Ups
35
Army Edit Results with New Metrics
36
PLISN Tree Audit Report
37
BOM Output
38
Seven Deadly Sins
  • Item SMR Coded Nonrepairable with Parts Breakdown
    Alert the CIT Team
  • Part of the PCCN/Selected LCN Range but not
    attached to any Assembly or Part
  • No Indenture Code
  • SMR Code Blank or Incomplete
  • Recoverable Code in Error
  • SMR Coded Repairable Assembly with no Parts
  • Warning Item Part of a Kit

39
LSA-080 BOM Part II Error Listing
40
Reports to help on Data review
41
Establish Existing LMI Baseline
Upload Existing PMR
Existing PMR?
Yes
CROSSWALK(MAC/PMR/ RPSTL/ Tasks List/ TDP-BOM)
Identify Available Data
Build PMR in PowerLOG-J
Existing LMI Baseline Established
No
Existing Task File?
Build Task Records in PowerLOG-J
Yes
Define LMI LCN Structure
No
Create Task List
The Existing LMI Baseline is Established after
the PSID approved changes are input to the LIN
file in PowerLOG-J.
Technical Data Package?
Create LCN Reparable Level