Title: MUSE ASSIST and GLAO Update
1MUSE - ASSIST and GLAO Update
- Remko Stuik and Ralf Flicker
- Leiden Observatory
Opticon AO-JRA Milestone 1 Meeting 16 17
September 2004, LAOG Grenoble, France
2Outline
- In this talk
- Introduction
- MUSE/MUSE AO
- Leiden HRA Laboratory
- ASSIST
- GLAO
- End the next half year brings
3Remember MUSE
- MUSE is...
- ... the Multi Unit Spectroscopic Explorer
- ... an AO assisted Integral Field Spectrograph
- ... a gen-2 VLT instrument
- ... intended for deep surveys
- MUSE will use...
- The VLT DSM
- ... 4 laser guide stars in 2
- ... 1 VIS(lt18)/IR NGS in 3
4Summary of Contribution
- MUSE, MUSE, MUSE
- MUSE/MUSE AO
- Leiden AO Laboratory and the High-Order AO
testbed - Adaptive Secondary Simulator and InStrument Test
bed - GLAO Algorithms
5MUSE/MUSE AO
- MUSE/MUSE AO
- Interface Control Documents
- MUSE AO - MUSE
- AO Technical Specifications
- LGS positioning
- On the edge or behind the secondary?
- Fratricide
6Leiden AO Laboratory
- Infrastructure
- HO-AO test setup
- Initial tests for the development of ASSIST
7ASSIST (I) - Elements
- Adaptive Secondary Simulator and InStrument Test
bed - Your personal assistant for European testing of
instruments which use the VLT DSM - Opto-mechanical, data and control interface equal
to - VLT focal plane
- DSM electronical interface
Opto-mechanical interface
Star Simulator
Optics
Turbulence Simulator
Optics
DSM Simulator
Optics
Focal Plane Interface
Pupil Image Rotation Simulator
Optics
RTC
High-speed data interface
Control Computer
(Low-speed) control interface
8ASSIST (II) Requirement Overview
9ASSIST (III) - Challenges
- ASSIST
- Which instruments to test
- MUSE!, X-shooter, HAWK-I,
- Wavelength range?
- 10 µm all reflective
- FoV?
- 13.5 50 cm focal plane!
- Nasmyth Cassegrain?
- How to test the test setup?
- Requires a 5 WFS system?
- One WFS available for testing of individual
subsystems - RTC will be available in Leiden ? Closed loop on
one guide star!
10ASSIST (IV) Status and Todo
- Done First iteration with ESO on specs
- To do next 6 months
- Finalize ASSIST specifications
- Interface Control Document
- Investigate ASSIST
- Size financing
- SOW
11GLAO (I) The Layout
12GLAO (II) - Reconstruction
One approach based on virtual tomography (Other
approaches plausible, e.g. minimum variance)
13GLAO (III) An example
- P I - U0U0T
- U0 null-modes
- I identity matrix
- T I (identical bases)
- High-order I-band AO(MUSE) Not working so well
- Tomographic estimation poor
- Tilt anisoplanatism off-axis
- Needs work!
14GLAO (IV) - Status
- Current Status
- Verifying Yorick AO (Rigaut) versus ESO (Miska)
- SVD versus MAP
- Implementing
- Extended source LGS
- Fratricide
- WFS optimization
- Sparse methods
- Searching for better reconstructors WFM/NFM
- Higher Strehl
- More uniform over FoV
- Robust for worse atmospheric conditions
15GLAO (IVa) YAO vs ESO
16GLAO (IVb) YAO vs ESO
PSFs
Ensquared Energy zoom
Ensquared Energy
Seeing Limited (YAO) Seeing Limited (ESO) AO
Corrected (ESO) AO Corrected (YAO)
17GLAO (IV) - Status
- Current Status
- Verifying Yorick AO (Rigaut) versus ESO (Miska)
- SVD versus MAP
- Implementing
- Extended source LGS
- Fratricide
- WFS optimization
- Sparse methods
- Searching for better reconstructors WFM/NFM
- Higher Strehl
- More uniform over FoV
- Robust for worse atmospheric conditions
18Timeline
- 03/2004 Kick-off ?
- 09/2004 Milestone meeting ?
- 10/2004 03/2005 MUSE Requirements
- MUSE TLR
- MUSE AO Specs
- LGS positioning
- 03/2004 04/2005 Development of LAOLAB
- Infrastructure ?
- HO-AO test setup
- Initial tests for the development of ASSIST
- 03/2004 03/2005 ASSIST Requirements
- Iterations with ESO ?
- Fix Requirements
- 04/2005 03/2006 ASSIST Preliminary Design
- 04/2006 03/2007 ASSIST Final Design
- 04/2007 02/2009 Construction ASSIST
- 03/2009 05/2009 ASSIST AIT
- 04/2004 03/2006 GLAO Real-time Control and
Algorithms - Verification of simulation environment ?
19