WHAT ARE INDIRECT COST RATES

Description:

Fringe Benefits On G&A Labor. Professional Fees (CPA) Office Supplies. IDC RATES ARE NEEDED ... Fringe Benefits. Overhead and G&A. INDIRECT COST RATE SYSTEMS ... – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 24
Provided by: Bish2
Category:
Tags: are | cost | indirect | rates | what | fringe

less

Transcript and Presenter's Notes

Title: WHAT ARE INDIRECT COST RATES


1
  • WHAT ARE INDIRECT COST RATES????
  • Indirect Cost Pool-How Deep?
  • Indirect Cost Base-How Large?
  • Indirect Cost Rate-How High?

2
AGENDA
  • Who Are We- Indirect Cost Branch
  • Definitions
  • Why Indirect Cost Rates Are Needed Including An
    Example
  • The Negotiation Process Including How To Start
    The Process

3
INDIRECT COST BRANCH
  • The Office At NIH With The Responsibility Of
    Negotiating INDIRECT COST RATES With COMMERCIAL
    ORGANIZATIONS Receiving Awards (Grants
    Contracts) With DHHS
  • SBIR STTR

4
TYPES OF COSTS
  • DIRECT COSTS Easily Identified With A Specific
    Project
  • Direct Salaries Wages
  • Materials Supplies
  • Consultants Subcontracts

5
TYPES OF COSTS
  • INDIRECT COSTS Not Easily Identified With A
    Specific Project
  • Fringe Benefits
  • Overhead
  • GA

6
FRINGE BENEFITS
  • Allowances And Services Provided To Employees
  • Pd Abs (Vacation, Holiday Sick Leave)
  • Payroll Taxes
  • Pension Plan
  • Group Ins (Health, Life Disability)

7
OVERHEAD COSTS
  • Indirect Costs Relating To The Performance Of A
    Project
  • Overhead Labor (e.g. supervision, general
    meetings)
  • Fringes On Overhead Labor
  • Facility Costs Depreciation
  • General Lab Supplies

8
GA COSTS
  • Indirect Costs Associated With The Overall
    Management Of The Company
  • Executive Administrative Labor
  • Fringe Benefits On GA Labor
  • Professional Fees (CPA)
  • Office Supplies

9
IDC RATES ARE NEEDED
  • To Provide A Uniform Method
  • Funding Indirect Costs
  • Charging Indirect Costs
  • To Provide An Equitable Allocation Of Indirect
    Costs Across All Projects

10
INDIRECT COST RATE
  • A Method For Allocating Indirect Costs To
    Projects
  • Ratio Between Indirect Costs (Pool) And An
    Equitable Base

11
TYPES OF RATES
  • Three Types Of Rates
  • Provisional Rates
  • Based On Projections For Current FY
  • Used For Funding Charging
  • Final Rates
  • Based On Actual Costs
  • Charges Adjusted To Reflect Final Rates
  • Ceiling Rates
  • Final Rates Cannot Exceed

12
INDIRECT COST RATE SYSTEMS
  • One Tier System One Pool
  • Fringe Benefits, Overhead GA
  • Two Tier System Two Pools - Typically
  • Fringe Benefits
  • Overhead and GA

13
INDIRECT COST RATE SYSTEMS
  • Three Tier System Three Pools
  • Fringe Benefits
  • Overhead
  • GA

14
NEGOTIATION PROCESS
  • CONTACT INDIRECT COST BRANCH-RUTH BISHOP
  • When Notification Grant/Contract Is Going To Be
    Awarded
  • How Via
  • E-Mail rb17i_at_nih.gov
  • Fax 301/402-7180

15
NEGOTIATION PROCESS
  • Information Needed
  • Representative Name E-Mail Address
  • Company Name Address
  • Grant/Contract Number
  • Grant/Contract Specialists Name

16
NEGOTIATION PROCESS
  • Indirect Cost Branch Requests Indirect Cost
    Proposal
  • Letter Via E-mail

17
NEGOTIATION PROCESS
  • Indirect Cost Proposal Submitted
  • Indirect Cost Branch Reviews Proposal
  • Indirect Cost Branch Follows-up With Questions To
    Company

18
RATES ARE NEGOTIATED
  • POOL We Want POOL SHALLOW Company Wants POOL
    DEEP
  • BASE We Want BASE LARGE Company Wants BASE
    SMALL
  • RATE We Want RATE LOW Company Wants RATE HIGH

19
NEGOTIATION PROCESS
  • NEGOTIATES RATES WITH COMPANY
  • Typically By Phone
  • Rate Agreement Is Issued

20
FINALLY
  • WE ARE DONE!
  • NOW THAT WAS NOT SO BAD!
  • WAS IT?
  • GUESS WHAT?
  • WE ARE GOING TO DO IT AGAIN NEXT YEAR!

21
SBIR
  • PHASE I - If GRANTEE DOES NOT HAVE A NEGOTIATED
    RATE INDIRECT COSTS FUNDED AND CHARGED CANNOT
    EXCEED 40 OF TOTAL DIRECT COSTS (NO EXCLUSIONS)

22
SBIR
  • PHASE II - IF PROPOSED INDIRECT COSTS ARE 25 OR
    LESS OF TOTAL DIRECT COSTS (NO EXCLUSIONS),
    GRANTEE DOES NOT NEED TO PROVIDE SUPPORTING
    DOCUMENTATION
  • THE 25 SHOULD NOT BE USED TO FUND PHASE II
    GRANTS UNLESS PROPOSED BY GRANTEE-NOT A TEMPORARY
    RATE

23