Network Construction Services Fiber, cable - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Network Construction Services Fiber, cable

Description:

Boom Trucks. 1 Peterbilt 374 w/17 ton RO Simon. 2 Ford L 8000 w/14 ton RO Simon ... Straight Trucks. 10 Ford L9000. 5 GMC Topkick. 1 Chevrolet Kodiak ... – PowerPoint PPT presentation

Number of Views:582
Avg rating:3.0/5.0
Slides: 14
Provided by: charli58
Category:

less

Transcript and Presenter's Notes

Title: Network Construction Services Fiber, cable


1
Network Construction Services(Fiber, cable)
2
Network Construction Services
3
Network Construction Services
By combining Mears resources, we are able to
construct large, complex projects. Our highly
experienced supervisory personnel and equipment
operators have extensive experience in plowing
and trenching in urban, agricultural, swamp,
desert, rocky and steep terrain environments.
4
Our proprietary plowing systems have been used
extensively for the installation of specialized
cables and for the installation of cable in
congested utility corridors and cross-country
applications.
5
Cat Plow
6
Trenching
7
Rail Plowing
8
Metro Builds
9
Mears Equipment
Vacuum Excavator 1 Filtration
Engineering Rubber Tire Backhoes 10 CAT 416C
4WD 13 Case 580L 4WD 1 Case 580K 4WD 2
CAT 416B 4WD 1 Case 580E Directional
Drilling Rigs 1 American Augers (800,000) 1
TRS JD250 Rig (500,000) 1 American Augers
DD330 (330,000) 1 American Augers DD140
(140,000) 2 American Augers DD90 (100,000)
1 American Augers DD60 (60,000) 2 Vermeer
50 (50,000) 6 Vermeer D24x40 (24,000) 1
Vermeer D24 (24,000) 1 Vermeer 711 (7,000)
Rail Plow 3 200,000 units Plow Tractors 1
CAT D8H 1 CAT D7R XR 1 CAT D7H XR 1
Komatsu D65EX 2 CAT D6D Bulldozers 1 CAT
D8K w/winch 1 CAT D7R XR w/winch 1 CAT
D7H XR w/winch 1 Komatsu D65EX 2 CAT D6D
w/winch 2 CAT D5M w/winch 1 CAT D5H
w/winch 1 CAT D4H w/winch
10
Mears Equipment
Excavators 2 CAT 225B LC 3 CAT 315 L 1
Komatsu 150-5 2 CAT 312 w/hammer 2 CAT
E120B 1 Badger Cruz-Air High Rail 1 CAT 214
Hi-Rail 3 Kubota KX 161 Boom Trucks 1
Peterbilt 374 w/17 ton RO Simon 2 Ford L 8000
w/14 ton RO Simon 2 International S1900
w/5 ton National
Straight Trucks 10 Ford L9000 5 GMC
Topkick 1 Chevrolet Kodiak
(All-wheel drive) 5 Ford F800 30 Ford
F550 Truck/Tractors 19 Peterbilt 378 T/A Trucks
11
Customer References
Construction   Jim Lowman John
Stoddard Qwest Communications Sprint Denver,
Colorado Kansas City, MO (303) 313-2922 (816)
854-3917   George Epps Bill Muckle Norfolk
Southern (T-cubed) Broadwing Norfolk,
VA Austin, TX (404) 962-5542 (512)
427-3796   Horizontal Directional
Drilling   George Lascor John Brewer Qwest
Communications Sprint Denver, CO Kansas City,
MO (303) 312-2998 (660) 668-3531   Lyle
Gehleert Bill ODwyer Kiewit Construction Leve
l 3 Communications Paso Robles, CA Denver,
CO (806) 226-9192 (303) 215-8227
12
Representative Projects
Construction   Broadwing Communications IXC
Communications, Inc. Austin, Texas
2000 Austin, Texas 1999 Install twelve miles
of six ducts (1.9) Install 56 miles of 3 each
1.9 in the city of Cheyenne, Wyoming and HDPE
ducts from Lake Wales, FL 20 miles of 6 ducts
from the Denver to Tampa, FL. International
airport to the town of Aurora,
Colorado. Project Value 2,300,000   Project
Value 2,300,000 IXC Communications,
Inc. Austin, Texas 1999 Norfolk Southern
(T- cubed) Install 72 miles of 2 - 2
HDPE Norfolk, Virginia 2000 conduit and fiber
along US Highway Install by rail plow 165 miles
of 16 27 from Baseball City to Lake
Placid, ducts between Atlanta and Florida.
This 46-day, fast track project Chattanooga. re
quired 28 directional drilling rigs and was
completed 10 days ahead of Project Value
14,000,000 schedule.   Install by rail plow 5
miles of 16 ducts Project Value 2.700.000 in
the city of Chattanooga Broadwing
Communications Project Value 1,000,000 Austin
, Texas 1999 Install 400 miles of six
HDPE Install by rail plow 50 miles of
various conduits (3 each 1.9 inch 2.735
inch) duct counts between 20 and 32 in the in
southeastern Wyoming and northern City of
Atlanta. Utah.   Project Value
7,600,000 Project Value 6,000,000  

13
Representative Projects
Construction Norfolk Southern (T- cubed) Qwest
Communications Corporation Norfolk, Virginia
2000 contd Denver, Colorado - 1998 Install by
rail plow 17 miles of various Install 200 miles
of HDPE (1 each 2 duct counts between 8 and
12 3 each 1-1/4) conduit by rail plow
from between the cities of Indiana
Harbor Bainbridge, Georgia to Jacksonville,
FL and Chicago Heights, Illinois along railroad
right-ofway including directional drilling,
cat plowing and Project Value
2,000,000 complete fiber installation. Ins
tall by rail plow 350 miles of 8 ducts Project
Value 4,500,000 between Atlanta and
Jacksonville. Qwest Communications
Corporation Project Value 11,000,000 Denver,
Colorado 1998   Install 160 miles of 2 each
2-inch HDPE Williams Communications conduit from
Detroit, Michigan, to Cleveland, Ohio Tulsa,
Oklahoma 2000 (60 miles installed by rail
plow). Includes Install 78 miles of 3 ducts
along natural numerous directional bores and an
8,000-foot gas pipeline right-of-way (El Paso
Energy) crossing of Sandusky Bay complete in
western Kentucky. fiber installation.
Project Value 2,500,000 Project Value
4,000,000 Williams Communications Tulsa,
Oklahoma 2000 Install 145 miles of 3 ducts
(1.9) between El Paso and Van Horn, Texas along
railroad right-ofway and state roads   Project
Value 3,500,000