Session 10: The ISPD2005 Placement Contest - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Session 10: The ISPD2005 Placement Contest

Description:

FastPlace, Capo, mPL, FengShui, APlace, NTUPlace, mFAR, ... Movs #Objs. Name. 5. ISPD 2005 Placement Benchmark Suite. 6. ISPD 2005 Placement Benchmark Suite ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 17
Provided by: IBMU332
Category:

less

Transcript and Presenter's Notes

Title: Session 10: The ISPD2005 Placement Contest


1
Session 10The ISPD2005 Placement Contest
2
Outline
  • Benchmark Contest Introduction
  • Individual placement presentation
  • FastPlace, Capo, mPL, FengShui, APlace,
    NTUPlace, mFAR, KraftwerkDomino, Dragon2005
  • Result Announcement
  • Conclusion Future Work

3
The ISPD2005 Placement Contest and Benchmark Suite
Gi-Joon Nam, Charles J. Alpert, Paul G.
Villarrubia, Bruce Winter and Mehmet Yildiz IBM
Corp.
4
ISPD 2005 Placement Benchmark Suite
5
ISPD 2005 Placement Benchmark Suite
6
ISPD 2005 Placement Benchmark Suite
7
ISPD 2005 Placement Benchmark Suite
  • Real industrial ASIC designs
  • Free space
  • 54 - 85
  • Affects wire-length significantly
  • Macros
  • Wider distribution of cell sizes
  • I/Os perimeter and area array I/Os
  • Various row configuration
  • Clock logic included

8
ISPD 2005 Placement Contest
  • Open contest primarily for academic physical
    design community
  • Covers majority of placement tools
  • FastPlace, Capo, mPL, FengShui, APlace,
    NTUPlace, mFAR, KraftwerkDomino, Dragon2005
  • Goals
  • To provide new modern placement benchmarks
  • To encourage to expose placement tools and
    results
  • To provide an educational forum on the
    state-of-the-art placement algorithms

9
Contest Format
  • Each team is given 5 days to come up with the
    best results they can get
  • Fixed window of time
  • No limit on CPU resources
  • Quality metrics
  • Legality
  • Half-perimeter bounding box wire length
  • No timing metric
  • No congestion metric

10
Contest Timeline
  • Jan. 12 Sample benchmarks released
  • Mar. 20 Contest benchmarks posted
  • Mar. 25 Solution submission due
  • Apr. 6 Results announcement

11
Outline
  • Benchmark Contest Introduction
  • Individual placement presentation
  • FastPlace, Capo, mPL, FengShui, APlace,
    NTUPlace, mFAR, KraftwerkDomino, Dragon2005
  • Result Announcement
  • Conclusion Future Work

12
Wire-Length Results
13
Conclusions Future Works
  • New placement benchmark suite ISPD2005
  • ISPD2005 Placement Contest
  • Better quality metrics for future contest
  • Routability congestion

14
adaptec2 Layout Figures
15
adaptec2 Layout Figures
16
adaptec2 Layout Figures
Write a Comment
User Comments (0)
About PowerShow.com