Title: CBC 7 Report to June C4
1CBC 7 Report to June C4
2Discussions in Meeting
- Next CBC Meeting
- Coordination with Committees
- GCI
- Work Plan Progress
- Development of 2009 2011 Work Plan
- CB in the Regions
3CBC 8 Opportunity for inter-committee coordination
2008 2008 2008 2008 2008 2008 2008 2008
May Jun Jul Aug Sep Oct Nov Dec
ADC 19-22, Geneva 21-24, Boulder
CBC 3-5, Tashkent 15-17, Athens
STC 22-23, Geneva 8-9, Paris
UIC 6-8, Toronto 22-24, Boulder
C4 17-18, Geneva 25-26, Boulder
ExCom 15-16, Geneva 18, Beijing
Plenary 19-20, Beijing
22-24, Boulder
4Coordination with Committees - ADC
- CB and the GEO Portal Accepted ADC proposal to
establish a joint task team (Alan Edwards, Gordon
Bridge, Hilcea Ferreira, Imraan Saloojee) - First OB review existing requirements drafted
by CBC - Second OB assess impact
- Prioritization of requirements
- Feasibility of the current architecture
- phasing of requirements
- evaluate impact on existing Tasks (and update the
GEO wp if necessary) - Third OB start implementation (through existing
or new task) - Best Practices Wiki for capturing Good CB
practice - Hilcea Santos Ferreira
- Chris Mannaerts
- Possible Joint Session in Boulder
5Coordination with Committees - UIC
- US 06 01
- Linkage with determining CB needs (CB0701b)
- UNECA contribute to user requirements in Africa
- Potential UIC call for participation
- Identification of projects provides a linkage
with donor engagement task - Develop CB requirements from IGOS Theme Reports
- COPs as a vehicle to determine CB needs
- Joint Session in Boulder would require planning
between co chairs
6GCI and CB
- IOC Task Force and CBC Hilcea Santos
Ferreira,Gordon Bridge, Alan Edwards - CBC members identifying test cases in each GEO
region to provide specific user feedback on
portal usability e.g. Kenyan Wildlife Services
7Work Plan Progress
- Task progressing well
- Most will continue into next work plan
- Excellent Progress made with Chlorogin (POGO,
EC0607) , Building National Capacity (UNEP,
CB0701d), Open Source (CB0701e) - Recurring theme resources for task
implementation - Resource Mobilisation
- Identification of showcase projects from current
tasks - Possible Meetings with Resource Providers
- Task Sheets
- Addition of capacity building info Box
82009 2011 WorkplanCB Overarching themes/Tasks
(OAT)
- Resource mobilization
- Promoting education, training and certification
(Build Individual Capacity to use EO) - Strengthening and building networks (Build
Institutional Capacity to use EO) - Advancing Earth Observation through
infrastructure development (Build Earth
Observation capacity through technology transfer) - Outreach and institutional reinforcement
(Continuous Needs/Gap Assessment)
9OAT and the CB Strategy
- The objectives outlined in the Capacity Building
strategy, therefore, need to be the driver of the
2009-2011 Work Plan Capacity Building activities - The 2009-2011 Work Plan should include, realign
and possibly redefine priority actions identified
in the strategy - The 2009-2011 Work Plan should address the I3 of
Capacity Building namely Infrastructure,
Institutional and Individual - The current Work Plan largely focuses on
developing the cross-cutting dimension of
capacity building a bigger focus is required in
the 2009-2011 Work Plan, through sub-tasks, on
developing societal-benefit-area specific
capacity building activities
10OAT and current tasks
- Resource mobilization
- CB0701a
- Promoting education, training and certification
- CB0801 AG0607 WE0605
- Strengthening and building networks
- EC0607 CB0701d CB0702(will this end in 08 ?)
- Advancing Earth observation through
infrastructure development - CB0701e WA0607 CB0604
- Outreach and institutional reinforcement
- CB0701b CB0701c
11OAT and suggestions from CBC6 GEOSec Call
- Resource mobilizationFP7 - establishing a
Capacity Building advisory capability in support
of Earth Observation (EO) activities - Promoting education, training and
certificationBuild Individual Capacity to use
EOGMOSS summer schoolsGEONETCast training
channelGEOBONForrestMonitorIRI /Gmoss Summer
School - Strengthening and building networksBuild
Institutional Capacity to use EOImplementing
CBERS GEO CB Network - Advancing Earth observation through
infrastructure development Build Earth
Observation capacity through infrastructure
development technology transfer CBERS,SERVIR
Africa, - Outreach and institutional reinforcementCB
PortalGames ContestUser Oriented workshops for
GEOSS outreach and feedback
12Recommendations to C4 and Excom
- Promote the identification of CB contact points
in GEO Caucuses - Proposal to reduce number of committee meetings
to 2 - Implications for task sheet updates