CBC 7 Report to June C4 - PowerPoint PPT Presentation

About This Presentation
Title:

CBC 7 Report to June C4

Description:

... Progress made with Chlorogin (POGO, EC0607) , Building National Capacity (UNEP, ... Games Contest. User Oriented workshops for GEOSS outreach and feedback ... – PowerPoint PPT presentation

Number of Views:98
Avg rating:3.0/5.0
Slides: 13
Provided by: imra8
Category:
Tags: cbc | games | june | pogo | report

less

Transcript and Presenter's Notes

Title: CBC 7 Report to June C4


1
CBC 7 Report to June C4
2
Discussions in Meeting
  • Next CBC Meeting
  • Coordination with Committees
  • GCI
  • Work Plan Progress
  • Development of 2009 2011 Work Plan
  • CB in the Regions

3
CBC 8 Opportunity for inter-committee coordination
2008 2008 2008 2008 2008 2008 2008 2008
May Jun Jul Aug Sep Oct Nov Dec
ADC 19-22, Geneva 21-24, Boulder
CBC 3-5, Tashkent 15-17, Athens
STC 22-23, Geneva 8-9, Paris
UIC 6-8, Toronto 22-24, Boulder

C4 17-18, Geneva 25-26, Boulder

ExCom 15-16, Geneva 18, Beijing
Plenary 19-20, Beijing
22-24, Boulder
4
Coordination with Committees - ADC
  • CB and the GEO Portal Accepted ADC proposal to
    establish a joint task team (Alan Edwards, Gordon
    Bridge, Hilcea Ferreira, Imraan Saloojee)
  • First OB review existing requirements drafted
    by CBC
  • Second OB assess impact
  • Prioritization of requirements
  • Feasibility of the current architecture
  • phasing of requirements
  • evaluate impact on existing Tasks (and update the
    GEO wp if necessary)
  • Third OB start implementation (through existing
    or new task)
  • Best Practices Wiki for capturing Good CB
    practice
  • Hilcea Santos Ferreira
  • Chris Mannaerts
  • Possible Joint Session in Boulder

5
Coordination with Committees - UIC
  • US 06 01
  • Linkage with determining CB needs (CB0701b)
  • UNECA contribute to user requirements in Africa
  • Potential UIC call for participation
  • Identification of projects provides a linkage
    with donor engagement task
  • Develop CB requirements from IGOS Theme Reports
  • COPs as a vehicle to determine CB needs
  • Joint Session in Boulder would require planning
    between co chairs

6
GCI and CB
  • IOC Task Force and CBC Hilcea Santos
    Ferreira,Gordon Bridge, Alan Edwards
  • CBC members identifying test cases in each GEO
    region to provide specific user feedback on
    portal usability e.g. Kenyan Wildlife Services

7
Work Plan Progress
  • Task progressing well
  • Most will continue into next work plan
  • Excellent Progress made with Chlorogin (POGO,
    EC0607) , Building National Capacity (UNEP,
    CB0701d), Open Source (CB0701e)
  • Recurring theme resources for task
    implementation
  • Resource Mobilisation
  • Identification of showcase projects from current
    tasks
  • Possible Meetings with Resource Providers
  • Task Sheets
  • Addition of capacity building info Box

8
2009 2011 WorkplanCB Overarching themes/Tasks
(OAT)
  • Resource mobilization
  • Promoting education, training and certification
    (Build Individual Capacity to use EO)
  • Strengthening and building networks (Build
    Institutional Capacity to use EO)
  • Advancing Earth Observation through
    infrastructure development (Build Earth
    Observation capacity through technology transfer)
  • Outreach and institutional reinforcement
    (Continuous Needs/Gap Assessment)

9
OAT and the CB Strategy
  • The objectives outlined in the Capacity Building
    strategy, therefore, need to be the driver of the
    2009-2011 Work Plan Capacity Building activities
  • The 2009-2011 Work Plan should include, realign
    and possibly redefine priority actions identified
    in the strategy
  • The 2009-2011 Work Plan should address the I3 of
    Capacity Building namely Infrastructure,
    Institutional and Individual
  • The current Work Plan largely focuses on
    developing the cross-cutting dimension of
    capacity building a bigger focus is required in
    the 2009-2011 Work Plan, through sub-tasks, on
    developing societal-benefit-area specific
    capacity building activities

10
OAT and current tasks
  • Resource mobilization
  • CB0701a
  • Promoting education, training and certification
  • CB0801 AG0607 WE0605
  • Strengthening and building networks
  • EC0607 CB0701d CB0702(will this end in 08 ?)
  • Advancing Earth observation through
    infrastructure development
  • CB0701e WA0607 CB0604
  • Outreach and institutional reinforcement
  • CB0701b CB0701c

11
OAT and suggestions from CBC6 GEOSec Call
  • Resource mobilizationFP7 - establishing a
    Capacity Building advisory capability in support
    of Earth Observation (EO) activities
  • Promoting education, training and
    certificationBuild Individual Capacity to use
    EOGMOSS summer schoolsGEONETCast training
    channelGEOBONForrestMonitorIRI /Gmoss Summer
    School
  • Strengthening and building networksBuild
    Institutional Capacity to use EOImplementing
    CBERS GEO CB Network
  • Advancing Earth observation through
    infrastructure development Build Earth
    Observation capacity through infrastructure
    development technology transfer CBERS,SERVIR
    Africa,
  • Outreach and institutional reinforcementCB
    PortalGames ContestUser Oriented workshops for
    GEOSS outreach and feedback

12
Recommendations to C4 and Excom
  • Promote the identification of CB contact points
    in GEO Caucuses
  • Proposal to reduce number of committee meetings
    to 2
  • Implications for task sheet updates
Write a Comment
User Comments (0)
About PowerShow.com