Title: Sunrise Powerlink
1Sunrise Powerlink
- Sunrise Powerlink Active Parties Workshop
- Friday, February 2nd, 2007
2Overview of Todays Presentation
- January 19th Errata Filing
- Summary of Changes
- Update of Results
- January 26th Supplemental Filing
- Summary of Changes
- Overview of Results
- Comparison of Aug 4th vs. Jan 26th Results
3January 19th Errata Filing
Correction of Four Input Data Errors
- Southern California Gas Price
- 6.89/MMBTU corrected to 7.13/MMBTU in one of
three simulation runs - Corrected heat rates
- CA gas-fired boiler plants
- Newer combined cycled units
- Corrected fuel source for CA gas-fired plants
- Corrected modeling for SDGE maximum import limit
4Revised with results of 1/19/2007 Errata filing
5Revised with results of 1/19/2007 Errata filing
6Supplemental Filing
- Modeling Differences and Assumptions from the
Aug. 4th filing - ABB GridView Model Version Update
- Version 3.0 to Version 3.4
- Miguel Import Nomogram Expanded to Include All
Directly Connected Imperial Valley Generation - Commission Adopted Load Forecast
- WECC Regional Loads
- New Committed Generation within the San Diego
Area - Miguel Substation Outlet Capability
- Resource Mix
- WECC Grid Simulation for Year 2020
7SDGE LOAD FORECAST
-
2010
SDGEs
SDGEs
August 4, 2006
January 26, 2007
1
Filing
Filing
SDGE
s 2010 90/10 Load Forecast
Before Demand Response CSI
4981 MW
5071 MW
California Solar Initiative (CSI)
10 MW
10 MW
Demand Response
0 MW
29 MW
SDGEs 2010 90/10 Load Forecast
After Demand Response CSI
4971 MW
5032 MW
SDGE
s 2010 50/50 Load Forecast
Before Demand Response CSI
4639 MW
4669 MW
California Solar Initiative (CSI)
0 MW
10 MW
Demand Response
0 MW
0 MW
SDGEs 2010 50/50 Load Forecast
After Demand Response CSI
4639 MW
4659 MW
1
SDGEs January 26, 200
7 filing utilizes the California Energy
Commissions June 2006 load forecast
update.
8SDGE LOAD FORECAST
- 2015
SDGEs
SDGEs
August 4, 2006
January 26, 2007
1
Filing
Filing
SDGE
s 2015
90/10 Load Forecast
Before Demand Response CSI
5342
MW
5438 MW
California Solar Initiative (CSI)
150 MW
150 MW
Demand Response
0 MW
29 MW
SDGEs 2015
90/10
Load Forecast
After Demand Response CSI
5192
MW
5259 MW
SDGE
s 2015
50/5
0 Load Forecast
Before Demand Response CSI
5066
MW
4998 MW
California Solar Initiative (CSI)
0 MW
1
5
0 MW
Demand Response
0 MW
0 MW
SDGEs 20
15 50/50 Load Forecast
After
Demand Response
CSI
5066 MW
4848
MW
1
SDGEs January 26, 2007 filing utilizes the
California Energy Commissions June 2006 load
forecast
update.
9 - 2020
SDGE LOAD FORECAST
SDGEs
SDGEs
August 4, 2006
January 26, 2
007
1
Filing
Filing
SDGE
s 2020 90/10 Load Forecast
Before Demand Response CSI
n/a
5800 MW
California Solar Initiative (CSI)
n/a
150 MW
Demand Response
n/a
29 MW
SDGEs 2020 90/10 Load Forecast
After Demand Response CSI
n/a
5621 MW
SDG
E
s 2020 50/50 Load Forecast
Before Demand Response CSI
n/a
5316 MW
California Solar Initiative (CSI)
n/a
150 MW
Demand Response
n/a
0 MW
SDGEs 2020 50/50 Load Forecast
After Demand Response CSI
n/a
5166 MW
1
SDGEs January 26, 2007 filing utilizes the
California Ene
rgy Commissions June 2006 load forecast
update.
10Total Project Cost
11(No Transcript)
12(No Transcript)
13Data Request Revisions
- Revisions for 1/26/2007 Supplementary Filing
(completed 2/1/2007) - UCAN Data Request 7 Questions 8dg, 10, 36 (2
sub-parts), 78 (8 sub-parts), 79 (8 sub-parts),
80 (8 sub-parts), 81 (8 sub-parts), 86b, 89fhj,
93e, 109 (3 sub-parts), 110b, 110c, 111 (4
sub-parts), 113bc, 117g, 118 (2 sub-parts), 121,
124 (4 sub-parts), 152 (2 sub-parts), 153abc,
154b, 155a - UCAN Data Request 8 Questions 5 (8 sub-parts),
24 (7 sub-parts), 26, 28, 29bcde, 30c, 37 (5
sub-parts) - The Nevada Hydro Company Data Request 1
Questions 1 - LS Power Data Request 1 Question 6
- LS Power Data Request 2 Questions 6, 16
- SDGEs Response to Comments from 10/13/06
Sunrise Powerlink Workshop Comments 42, 89,
120, 142 - Energy Working Group Questions 28
- CPUC Energy Division Data Request 1 Questions
ALT-45
14Data Request Revisions (contd)
- Revisions for 1/19/2007 Errata Filing (due
2/9/2007) - UCAN Data Request 7 Questions 8d, 8g, 10, 36
(2 sub-parts), 51d, 70b, 71c, 71d, 72b, 72c, 75,
77d, 78 (8 sub-parts), 79 (8 sub-parts), 80 (8
sub-parts), 81 (8 sub-parts), 86b, 93 (3
sub-parts), 94 (4 sub-parts), 107e, 109 (3
sub-parts), 110b, 110c, 111 (4 sub-parts), 112 (4
sub-parts), 113 (3 sub-parts), 114, 117 (7
sub-parts), 118 (2 sub-parts), 120 (3 sub-parts),
121, 122 (5 sub-parts), 124 (4 sub-parts), 132,
145, 149 (7 sub-parts), 150, 152 (2 sub-parts),
153 (4 sub-parts), 154 (2 sub-parts), 155a - UCAN Data Request 8 Questions 1 (12
sub-parts), 5 (8 sub-parts), 24 (7 sub-parts),
26, 28, 30c, 37 (5 sub-parts), 50 - UCAN Data Request 5 Questions 25, 38 (3
sub-parts), 39c, 40c, 51f - UCAN Data Request 4 Questions 5a, 5b, 5c, 5d,
6a, 6b, 6c, 6d, 17c, 17d, 23b, 27, 29c, 36b,
37a-p (16 sub-parts), 39b, 39d - UCAN Data Request 2 Questions 12, 13a, 13b,
13c, 13d, 13e, 14d, 16a, 16b, 16c, 16d, 16e, 16f,
17, 22, 25a, 25b, 25c, 26, 27, 28a, 28b, 49, 95c,
95d, 96a, 97b, 97c - UCAN Data Request 1 Questions 20, 77, 78, 89
- The Nevada Hydro Company Data Request 1
Questions 1 - LS Power Data Request 1 Question 6
- LS Power Data Request 2 Questions 1, 2, 3, 4,
6, 7, 9, 10, 12, 13 (2 sub-parts), 16 - SDGEs Response to Comments from 10/13/06
Sunrise Powerlink Workshop Comments 42, 48,
98, 110, 119, 120, 142 - Energy Working Group Questions 13, 18, 28
- CPUC Energy Division Deficiency Responses
Questions Project Description-17, Alternatives-5 - CPUC Energy Division Data Request 1 Questions
ALT-45