PEACHTREE STREETCAR - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

PEACHTREE STREETCAR

Description:

PEACHTREE STREETCAR – PowerPoint PPT presentation

Number of Views:252
Avg rating:3.0/5.0
Slides: 21
Provided by: ISG
Category:

less

Transcript and Presenter's Notes

Title: PEACHTREE STREETCAR


1
PEACHTREE STREETCAR
  • February 2009 Workshop
  • MARTA Headquarters

2
ATLANTAS PAST A Major Transportation Center
PEACHTREE STREETCAR
  • 1889
  • 1st Electric Trolley Line
  • (Downtown Atlanta to Inman Park)
  • 1924
  • Comprehensive Atlanta Streetcar Network (200
    single track miles)

The Capitol Connector
  • 1949
  • Last Streetcar Operated

February 2009
3
ATLANTAS PAST A Major Transportation Center
  • 1889
  • 1st Electric Trolley Line
  • (Downtown Atlanta to Inman Park)
  • 1924
  • Comprehensive Atlanta Streetcar Network (200
    single track miles)
  • 1949
  • Last Streetcar Operated

4
1943 Atlanta Streetcar Network
5
ATLANTAS FUTURE A Livable and Sustainable
City
  • Advance a Transit, Walking and Biking FIRST
    Culture within the Capitol City
  • Build an Integrated Transit Distribution Network
  • Optimize (connectivity)
  • Efficiencies and Economies of Scale
    Standardization and Interoperability Accelerate
    Project Delivery
  • Solve the First and Last mile distribution
    issues
  • Reduce Car and Bus Traffic in Congested Streets
  • Promote Air Quality, Healthy Communities and
    Lifestyles
  • Support Community Revitalization and Economic
    Development

6
CONCEPTUAL SYSTEM
  • MARTA, TPB Concept 3, Peachtree Streetcar
    PLUS
  • Provides a critical regional missing link for
    the Capitol City
  • Complements Existing Transit System and Regional
    Expansion Plans
  • INTEROPERABILITY with BeltLine

7
INTEROPERABILITY-STREETCAR BELTLINE
  • Joint Use of Infrastructure
  • Joint Procurement of Vehicles
  • Joint Use Of Operations Maintenance Facility
  • Minimize Deadhead"

8
RECOMMENDED APPROACHA Streetcar Starter Line
  • Phased Construction (4 Segments)
  • 1a East-West Line (CBD, Auburn and Edgewood)
  • 1b North-South Line to Arts Center
  • 1c Centennial Olympic Park Extension
  • 1d Future BeltLine Connections (Edgewood and
    10th Streets)
  • Operations
  • 8.1 miles 30 initial stations (1/4 mi.average
    spacing)
  • 9 vehicles (modern streetcar type level
    boarding)
  • 30 minute total trip time (entire length)
  • 10 minute service frequency
  • Estimated daily ridership 4,100 (with fare) to
    6,500 (free fare)
  • Costs
  • 134m capital cost estimate 16.6m per mile
    (2008 )
  • 4.5m annual operating cost (est.)

9
MARTA RAPID TRANSIT SYSTEM
  • East-West Lines

North Spring Station
  • North-South Lines
  • Five Points Station

Doraville Station
Bankhead Station
Holmes Station
Indian Creek Station
Five Points Station
Hartsfield-Jackson Atlanta International Airport
10
Key Streets
STREETCAR ROUTES
14th St.
10th Street
  • 14th Street
  • 10th Street
  • North Ave. NE
  • Ralph McGill Blvd.
  • Auburn Ave. NE
  • Edgewood Ave. SE
  • Boulevard NE
  • Peachtree St. NE
  • Highway 75/85

85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
11
Streetcar Route Overlay
12
STREETCAR ROUTES
14th St.
East-West Line 1-A
10th Street
  • Required for
  • Maintenance Shop
  • Operations Center
  • Car Testing
  • Training Ops.

85
Peachtree St. NE
Boulevard NE

Maint. Shop OCC
Parking
  • Route Features
  • Five Points Station
  • Grady Hospital
  • MLK Memorial
  • MARTA Stations

75
North Ave.
Grady Hospital
Ralph McGill Blvd.
Auburn Ave.
Five Points Station
Edgewood Ave.
13
STREETCAR ROUTES
14th St.
10th Street
North-South Line 1-B
  • Route Features
  • Ralph McGill Bridge
  • Crawford-Long Hospital
  • Bank of America Building
  • Midtown Development
  • MARTA Stations
  • Fox Theater
  • Arts Center

85
Peachtree St. NE
Boulevard NE
75
Crawford-Long Hospital
North Ave.
Ralph McGill Bridge
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
14
STREETCAR ROUTES
14th St.
10th Street
North-South Line 1-B
  • Route Features
  • Ralph McGill Bridge
  • Crawford-Long Hospital
  • Bank of America Building
  • Midtown Development
  • MARTA Stations
  • Fox Theater
  • Arts Center

85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Arts Center
Auburn Ave.
Edgewood Ave.
15
STREETCAR ROUTES
14th St.
10th Street
Centennial Park 1-C
  • Route Features
  • Ralph McGill Bridge
  • Crawfod-Long Hospital
  • Bank of America Building
  • Midtown Development
  • MARTA Stations
  • Fox Theater
  • Arts Center

85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
16
STREETCAR ROUTES
14th St.
10th Street
Future Extensions - BeltLine
Connector
85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
17
Modern Streetcars
  • Portland
  • Helsinki
  • Concept

(Portland Tacoma )
18
Streetcar track
- In Pavement Switch
- Embedded Rail Crossing
- Curb Running Station
- Streets with Embedded Track
19
Next Steps
  • Technology Options
  • Leveraging Assets
  • Connectivity from Regional Services to downtown
    Atlanta
  • Combining Streetcar and BeltLine efforts provides
    Economy of Scale

19
19
20
Questions and Answers
14th St.
10th Street
85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
21
STREETCAR ROUTES
14th St.
10th Street
North-South Line 1-B
  • Route Features
  • Ralph McGill Bridge
  • Crawfod-Long Hospital
  • Bank of America Building
  • Midtown Development
  • MARTA Stations
  • Fox Theater
  • Arts Center

85
Peachtree St. NE
Boulevard NE
75
North Ave.
Ralph McGill Blvd.
Auburn Ave.
Edgewood Ave.
Write a Comment
User Comments (0)
About PowerShow.com